Fort Sill - POOF Tim Onasch, Mike Timko March 18, 2007 (day 0) LOG Day 1 – co-adds 2, used 1 multiply data by 2 Day 2 – IE used 34, should be 15, multiply.

Slides:



Advertisements
Similar presentations
Stratagem EH4 Field Evaluation of Data Quality.
Advertisements

Screenshots January 27 SP-AMS. Laser Menus Menu 1, 2, 3.
Operating the Harmonizer
Tinker AFB – F , F14 jet engine test MTT, TBO 3/29/07 – 4/6/07.
Chem. 133 – 2/19 Lecture. Announcements Lab Work –Turn in Electronics Lab –Starting Set 2 HW1.2 Due Today Quiz 2 Today Today’s Lecture –Noise –Electrochemistry.
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
① The output signal of a room thermostat is ON or OFF according to changes of room temperature ② The power supply to a motorized valve is ON or OFF according.
1 Computer Maintenance Disaster Recovery and Preventative Maintenance Copyright © Texas Education Agency, All rights reserved.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
PS wirescanner calibration Student Meeting 10/03/2014 Carolina Bianchini BE-BI-BL.
Squirrel Overview Donna Sueper Aerodyne, University of Colorado, Boulder.
Kamico Program Tami Warner Agenda Program Overview Teacher Reasonability's Problems with Software Summarize Questions.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Meso: Exp 15 Figs1-Exp6 5ppb Limonene and 20ppb O
Squirrel Overview Donna Sueper June, 2007 Aerodyne, University of Colorado, Boulder.
Oxford Engine Emissions 10 th Jan Filter run.
Squirrel Tutorial Post – Pre-Process Steps Airbeam correction PToF DVa, DC markers Fragmentation checks Donna Sueper Aerodyne, University of Colorado,
Imago LEAP Recovery Procedure for Cryo-Compressor and Cold Finger The LEAP is equipped with a Uninterrupted Power Supply (UPS). Located in the 19 inch.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Stephen Pemberton TE-MPE-EE 1 DQLPUR Prototype Testing Initial Results: Thermal Tests Voltage Drop Off Tests.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Emmanuel Momjian (NRAO)
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
ACD Calibrations in L&EO Needed Calibrations Pedestals (low and high range) Low range gains via MIP peak positions Veto and HLD discriminator set points.
Sparrow Light Scattering (LS) Analysis Tool The first flight ver March 26, 2010.
Draft HPS Run Plan March 30, Next Steps Beamline Setup Trigger Commissioning Beam Stability Studies SVT Commissioning Data Taking Checking the.
TPD Workstation Software TPD software for control/ analysis of experiments Multiple temperature steps. Optimised data acquisition.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
Squirrel Tutorial Pre – Pre-Process Steps Modify Single Ion (SI) M/z Calibration Fitting Baseline Fitting Donna Sueper ToF AMS Training, Aerodyne, Nov/Dec.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Handling Multiple Loaders ©Dr. B. C. Paul 2000 Revised 2008 The Binomial Formula is widely published in works on statistics. These slides contain screen.
Squirrel Tutorial Pre – Pre-Process Steps Modify Single Ion (SI) M/z Calibration Fitting Baseline Fitting Donna Sueper Aerodyne, University of Colorado,
Threshold ionization mass spectroscopy of radicals in RF silane discharge Progress report 11/19/2003 Contributors: Alan Gallagher Peter Horvath Karoly.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Center for Atmospheric Particle Studies AMS Data Analysis Training Amy Sage and Andy Grieshop March 7, 2007.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
Comparison of MC and data Abelardo Moralejo Padova.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Data Editing Strategies Common edits Invalidation vs. contamination? What is a considered a spike? What not to edit! Automatic edits Reasons for edits.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Workflows to set up acquisition methods for scheduled sMRM-HR on the TripleTOF 5600 Start from a data dependent acquisition (DDA) Perform data base search.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
H - ion source at the pre-acc R&D lab Update HINS Meson meeting January 20 th, 2011 L. Prost, C. Schmidt, D. Bollinger, R. Tomlin.
GC Trouble shooting.
PreShower Characterisations
Brooks Expert Support Tool (BEST) Software
Automotive Heating And Air Conditioning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
Clinical Research Use Only Not For Diagnostic Purposes
Summary Friday h38: Ramp down and pre-cycle.
Noise analysis of the 1m3 DHCal test beam
CONTOUR NGIMS PRE-SHIP REVIEW
Chem. 133 – 2/16 Lecture.
M/Z Cal Issues at high mass loadings
Optimizing PToF timing and averaging and saving
Tuesday March 27, 2012 Clicker questions.
3a) Load or Verify IonSource & Tune File
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Summary of dE/dx studies in silicon and MS in muon system
CONTOUR NGIMS Electronics Test History
Status Report and highlights from workshop II
Presentation transcript:

Fort Sill - POOF Tim Onasch, Mike Timko March 18, 2007 (day 0) LOG Day 1 – co-adds 2, used 1 multiply data by 2 Day 2 – IE used 34, should be 15, multiply data by 4/10

Fort Sill POF Summary Day 0 – setup March 18, 2007 (Sunday) Day 1 – AM Paladin 155mm howitzer (NO offline for part of the day) (Mon) Day 2 – PM small arms fire – SAWs and machine gun (PTR down for final hour) (Tues) Day 3 – AM 105 mm howitzer, PM single shot grenade launcher M203 (Wednesday) Day 4 – AM/PM single shot SAW’s (AMS off line for the entire measurement) (Thursday)

Post Fort Sill To-do list Is 10-sec GA working properly? 3/23 looks OK (look at final hdf files from 3/22/07 to confirm) How is the noise level? At ARI talk to JJ and AT to diagnose noise problems – do we need to open things up? Clean instrument and sort through cables Why is heater bias not heater controlled? Get latest software –Igor, Squirrel, and DAQ Standard cold start procedure –Turn on pumps (wait 10 min) turn on oven, bake overnight –Turn filament and let heat up for a couple of hours –Boot up TPS controller with no_amp_noK settings –Baseline in bitwise –m/z cal –Tune including heater bias (maximize 28, max res of 32/184, optimize peak shape, minimize 39/23) –Redo baseline/ m/z cal –Get SI in bitwise (SI was about 18 on last days of POF) –BFSP calibration in GA mode (IE_cal menu, 60 sec) with Ben’s software (IE was about 5e-7 on last days of POF) –Take 10 min of 10-sec GA truck and 10-sec GA on filter – analyze with Squirrel – Are things OK?

070318_poof_day0

Valve open, chopper open

Valve closed, chopper open

Valve open, chopper closed

10-sec scan routine

0.3 sec wait time

Day 1: M155 Range ? March 19, 2007

Shot 2 Mass Specs

Ambient ptof before shot 1

shot 1 size distribution

Ambient ptof

shot 6 size distribution

Combined data from Day 1 morning - Paladin

Day 2 March 19, 2007

3-sec ptof truck air

1-sec ms truck air

3-sec ms truck air

This single ion was done post-fact, the data from day 2 needs to be multiplied by 4/10

Bfsp_ie/day2bBFSP afternoon, AB = 6e5, IE = 1e-6

Day in the morning Grenade launchers in the afternoon? 3/21/07

Stable SI

Small correction to m/z cal

BFSP ie cal afternoon of Day , IE = 5.4e-7, AB = 3.5e5

Loads of K signal at m/z = 39 Also, really running our mcp into the ground (possibly due to K) Raise board gain from 0.2 to 0.1 Lower MCP Tune away from K at m/z = 39 Here are the results

This is a screen shot from the end of day 3 Truck air

This is a screen shot from the end of day 3 Truck air

Day 4 prep

Single ion went up a very slightly, probably due to MCP and thresholding

Tuning looks good, single extraction is reasonable,

Morning/Afternoon Day 4 March 23, 2007 Massive failure – no MCP signal even for tuning purposes Why? A) about 1 hr of oven temp > 900C b) very bumpy ride to the range Diagnosis? None, lots of external connections checked out OK, waited for several hours and the signal was recovered. At first, there was nasty electronic noise, but that went away after about an hour. What happened? Unknown at this time. The following slides are the tuning and recals performed the afternoon of Day 4

1 sec ms truck air

1 sec ms filter air

1 sec ptof truck air

1 sec ptof filter air

30 sec GA truck air