Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.

Slides:



Advertisements
Similar presentations
Regular process for global reporting and assessment of the state of the marine environment, including socio-economic aspects Taking forward Global Oceans.
Advertisements

A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.
IMS1805 Systems Analysis Topic 6: Analysis as a process within a process.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
Systems Engineering Management
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Dissertation Workshop 1 Essay Writing/Dissertation Planning John Solomos Department of Sociology.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
On-line briefing for Program Directors and Staff 1.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
M. Oreglia, ALCPG07, 23 Oct 2007Slide 1 (of 1) Introduction to SiD; Preparing for a LOI Quick overview of SiD Charge to SiD speakers Substance of.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
SiD Vertexing and Tracking Contribution to the LOI Bill Cooper Marcel Demarteau Ron Lipton Rich Partridge Dong Su For the SiD Vertex/Tracking Group SiD.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
ILD LoI (Calorimeter part) 2008/12/14 K. Kawagoe.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
KA12 Marcel Demarteau Fermilab DOE Site Visit August 23,
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Taught Postgraduate Program Review
CUCSA Workgroup Chair Orientation
Oct 22 Group Leaders Planning meeting
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
The SiD Detector Outline Overview
Technical Design Report preparation
The DBD: Outline and Scope
Update of the Detector Program for ILC Sakue Yamada March
TECHNICAL REPORT.
Chapter 21 Formal Reports
Exit Capacity Substitution and Revision
17 April 2018 Progress report ccc General capacity requirements for SAIs for conducting IT audits.
Taught Postgraduate Program Review
Presentation transcript:

Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia

Philip Burrows SiD meeting, Chicago 15/11/082 Reminder of scope (Yamada Oct ) ‘Loi should contain: information on proposed detector, its overall philosophy, its sub-detectors and alternatives, and how these will work in concert to address the ILC physics questions’

Philip Burrows SiD meeting, Chicago 15/11/083 Reminder of scope (Yamada Oct ) ‘Evaluation of detector performance should be based on physics benchmarks … some same for all LoIs … some chosen to emphasise the particular strengths of the proposed detector’

Philip Burrows SiD meeting, Chicago 15/11/084 Reminder of scope (Yamada Oct ) ‘discussion of integration issues with the machine … state of technological developments for the components … alternative technological options … further R&D should be identified … with timelines and milestones … a preliminary cost estimate’

Philip Burrows SiD meeting, Chicago 15/11/085 Reminder of scope (Yamada Oct ) ‘In addition, should present: structure of group … resource needs and evolution in time … enable the reader to judge the capacity and seriousness of the groups to carry out the work until the EDR’

Philip Burrows SiD meeting, Chicago 15/11/086 Additional questions (IDAG June ) 1. Sensitivity of different detector components to machine background as characterized in the MDI panel. 2. Calibration and alignment schemes. 3. Status of an engineering model describing the support structures and the dead zones in the detector simulation 4. Plans for getting the necessary R&D results to transform the design concept into a well-defined detector proposal. 5. Push-pull ability with respect to technical aspects (assembly areas needed, detector transport and connections) and maintaining the detector performance for a stable and time-efficient operation. 6. A short statement about the energy coverage, identifying the deterioration of the performances when going to energies higher than 500 GeV and the considered possible detector upgrades. 7. How was the detector optimized: for example the identification of the major parameters which drive the total detector cost and its sensitivity to variations of these parameters.

Philip Burrows SiD meeting, Chicago 15/11/087 IDAG Mandate (Yamada June ) 1. Are the physics aims of the detector convincing for an experiment at ILC? 2. Is the detector concept suited and powerful enough for the desired physics aims and the expected accelerator environment? Namely, is the arrangement of the employed detector components adequate? 3. Do the mechanism for the push-pull operation, related alignment and calibration methods enable the desired switching process? 4. Is the detector feasible? Namely, is the required R&D for the selected technologies advancing fast enough so that they can be completed during the design phase? Are the estimated cost and the way to obtain it reasonable when examined at the time of LOI? 5. Is the group powerful enough to accomplish the required design work through the technical design phase?

Philip Burrows SiD meeting, Chicago 15/11/088 Executive summary YIKES!

Philip Burrows SiD meeting, Chicago 15/11/089 LoI Framework 1.Introduction (5) 2.Global issues (10) 3.Subsystems (45) 4.Physics performance and benchmarking (25) 5.Cost estimate (5) 6.R&D issues (5)

Philip Burrows SiD meeting, Chicago 15/11/0810 LoI Framework 1.Introduction ILC physics menu ILC environment SiD rationale

Philip Burrows SiD meeting, Chicago 15/11/0811 LoI Framework 1.IntroductionJaros ILC physics menu ILC environment SiD rationale

Philip Burrows SiD meeting, Chicago 15/11/0812 LoI Framework 2. Global issues SiD assembly Push-pull

Philip Burrows SiD meeting, Chicago 15/11/0813 LoI Framework 2. Global issuesBreidenbach SiD assembly Push-pull

Philip Burrows SiD meeting, Chicago 15/11/0814 LoI Framework 3. Subsystems Overview Beamline Tracking system Forward detectors Calorimeters Muon system Magnet DAQ + electronics

Philip Burrows SiD meeting, Chicago 15/11/0815 LoI Framework – ‘responsibles’ 3. Subsystems Overview BeamlineMoffeit/Woods Tracking systemDemarteau et al Forward detectorsMaruyama/Markiewicz CalorimetersWhite/Frey Muon systemBand/Fisk MagnetKrempetz DAQ + electronicsHaller

Philip Burrows SiD meeting, Chicago 15/11/0816 LoI Framework 4. Physics performance and benchmarking Simulation Benchmark reactions Performance of SiD

Philip Burrows SiD meeting, Chicago 15/11/0817 LoI Framework 4. Physics performance and benchmarking Barklow/Nomerotski Simulation Benchmark reactions Performance of SiD

Philip Burrows SiD meeting, Chicago 15/11/0818 LoI Framework 5. Cost estimate 6. R&D issues

Philip Burrows SiD meeting, Chicago 15/11/0819 LoI Framework 5. Cost estimateBreidenbach 6. R&D issuesWhite/Brau

Philip Burrows SiD meeting, Chicago 15/11/0820 Since Boulder Meeting Editors meeting regularly Defined framework just described Agreed on APS latex format Assigned responsibles for each section Zeroth pass at assembling some of starting material

Philip Burrows SiD meeting, Chicago 15/11/0821 Current Status 1.Introduction 2.Global issues 3.Subsystems 4.Physics performance and benchmarking 5.Cost estimate 6.R&D issues = something exists

Philip Burrows SiD meeting, Chicago 15/11/0822 Current Status 1.Introduction 2.Global issues 3.Subsystems DUE TODAY 4.Physics performance and benchmarking 5.Cost estimate 6.R&D issues

Philip Burrows SiD meeting, Chicago 15/11/0823 Subsystem section template

Philip Burrows SiD meeting, Chicago 15/11/0824 LoI Timeline November 15: 1 st draft subsystem reports feedback to subsystems December 15: 1 st draft physics/benchmarking chapter identify and fill gaps, iterate etc. January 15: revised subsystem sections focussed collaboration meeting early Feb? February 15: complete draft for collaboration review March 15: final draft ready March 31: submit to Research Director

Philip Burrows SiD meeting, Chicago 15/11/0825 Editorial comments Have not done any detailed editting yet - want to have most of raw material first Will need to harmonise style, deal with overlaps … Will need to draw out/delineate clear answers to IDAG questions Thanks for contributions to date! We need your cooperation in order to stay on track …