8/12/2000Guy Crockford BI days 20001 New application software for SPS wire scanner controls G.Crockford SL/OP.

Slides:



Advertisements
Similar presentations
22-23/06/20093 rd Libera Users Meeting, ESRF1 3 years of experience of Libera BPMs at SOLEIL Nicolas HUBERT Synchrotron SOLEIL On behalf of Diagnostics.
Advertisements

M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Chapter 13 Organizing Information System Resources MIS Department Centralization and Decentralization Outsourcing Computer Facilities and Services.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
SPS Syncrotron Telescope Software specifications Aurélie Goldblatt BE-BI-PM
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Wire scanner controls at SLAC. Subgroup for one emittance measurement station Wire to select Scan range Park position Selection x,y,u Single scan Start.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
BWS PS and SPS problem report J. Emery
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
High Beam Intensity Harp Studies and Developments at SNS*
Wire Scanners Observations In SPS & LHC G. TRAD Emittance working group 26/08/2015.
Chapter 10 Rüdiger Schmidt (CERN) – Darmstadt TU , version E 2.4 Acceleration and longitudinal phase space.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Optics studies for the LHC beam in the TT2-TT10 line and effect of the QKE58 suppression E.Benedetto, A.Franchi Thanks: G.Arduini, D.Jacquet, O.Berrig,
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Self Switching Power Supply. Introduction Self Switching Power Supply  Embedded system requires a regulated power supply.
AB/BI J. Koopman New WS design - Brain storm session 18/06/2007 1/16 New WS design - Brain storm session.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
PS Orbit Second year of TMS Operation Stéphane Bart Pedersen BE-BI-SW July BE-BI-SW July 2013.
Kernel Design & Implementation
LHC Wire Scanner Calibration
Automatic emittance measurement in the CERN 1.4 GeV Booster
Space charge studies at the SPS
Injectors BLM system: PS Ring installation at EYETS
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
Instrumentation for SPS 2006 restart
BE-BI Software for LINAC4
LHC wire scanners status
Beam Gas Ionization Monitor (BGI)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
What am I working on… H. Loos 08/02/2010.
Status of muon monitor R&D and construction
Transverse emittance measurements
Transverse emittance measurements from FWS
Beam dynamics requirements after LS2
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Commissioning Experience
He Zhang MEIC R&D Meeting, 07/09/2015
Measurement of the beam (transverse) emittances
Presentation transcript:

8/12/2000Guy Crockford BI days New application software for SPS wire scanner controls G.Crockford SL/OP

8/12/2000Guy Crockford BI days Motivation Need to eradicate OS9 and TG3 systems in favour of LynxOS on PowerPC and TG8 (SL/CO supported hardware). Improved emittance measurement facilities required for LHC machine developments. Old application and server software written in Decide to replace this with more efficient software, better able to meet user requirements and ease software maintenance.

8/12/2000Guy Crockford BI days User Requirements Need 2 pairs of wire scanner in both non dispersive region and high dispersion section. Intensity range of bunches from I=10^9 to I > 10^12 (need for optical filters). Multi-bunch FAST WS allowing measurements: –Averaged over the whole batch. –On different slices of the batch. –On selected single bunches (given sufficient spacing). SLOW measurement for general use. IN and OUT scan performed in the same cycle.

8/12/2000Guy Crockford BI days The Hardware for fast/slow measurements Two hardware requirements for fast acquisition. –Fast signal response from photo multiplier. –Beam synchronous timing to allow acquisition gating. 2 photo multipliers installed in LSS4. 1 connected to a local amplifier in the tunnel, and a 50 ohm impedance line to the surface giving fast signal response, but with the disadvantage of a noisier signal. 1 connected directly to a 1 kilo ohm line to the surface providing a slow measurement integrated over 3 SPS turns. Provides less noisy measurement, integrated over the whole beam, which works for all types of beam.

8/12/2000Guy Crockford BI days BSG for fast acquisition Beam synchronous gate has 7 programmable fast acquisition modes. Currently set as follows. Fixed Target, 2 batches, 10 acquisitions (2*5 CPS extractions). Lead Ions, 4 batches, 4 acquisitions. 4 LHC beam options. –3 batches, 3 acquisitions. –1 batch, 3 acquisitions (3 slices of same batch). –1 bunch, 1 acquisition (effectively same as slow). –1 batch, 1 acquisition. 1 user option, single gate, adjustable with respect to the revolution frequency and adjustable gate size. Effective resolution of the fast acquisition is of the order of 200ns.

8/12/2000Guy Crockford BI days The Software Chose to integrate wire scanner into TZ measurement application. –1 standard application for many BI systems (already used for SEM, Fast SEM, OTR, TLPOS). –Measurement selection presented in a standard way. –Takes advantage of the TZ database infrastructure. –Application completely data-driven. New equipment can be added, parameters modified for different super cycles without touching the software. Separate application provided by BI oriented for equipment specialists.

8/12/2000Guy Crockford BI days 20007

8/12/2000Guy Crockford BI days New software features Predefined optical filter control. Filter selection dependant on which HW selected and acquisition mode (fast or slow). Both Potentiometer and Ruler data returned with each scan (in practice the optical ruler is limited to slow wire velocity and therefore very low intensity beams). Chi squared fitting routine to calculate fit beam size and position. Visualization of several profiles from a single scan in the case of fast measurements. Jitter on wire start time measurement improved by a factor 10. Now less than 1ms jitter. Improved normalized emittance calculation. Scanner address (family,member), filters, configuration parameters and twiss parameters all stored in TZ database.

8/12/2000Guy Crockford BI days Measurement parameters Acquisition mode (fast or slow). –For fast measurement, BSG file option (1-7). –If user option 7 selected. Gate delay (micro seconds). Gate size (micro seconds). Acquisition time for IN scan. Delay between IN and OUT scan. HT of photo multiplier (volts). Fitting routine (rms or chi squared). Fit threshold. Momentum spread (DP/P).

8/12/2000Guy Crockford BI days Hardware plans for 2001 BA2 wire scanners to be moved to BA5. –Rotational scanner at moves to –Linear scanner at moves to BA4 installation. –High dispersion region scanner at –Non dispersive region scanner at –Linear scanner at moves to Calculation of the delay between start of wire movement and beam crossing (wire fly time). Modification of photo multiplier electronics. –Single PM in the tunnel, slow/fast mode switching at surface.

8/12/2000Guy Crockford BI days Acknowledgments J.KoopmanHardware installation. G.FerioliHardware installation. H.HillerServer and BI application. J.J.GrasConsultations.