1 Intermittency Analysis Project: 2010 Accelerated and 2020 Scenarios Dora Yen-Nakafuji, Commission Project Manager Kevin Porter, IAP Team Lead CEC PIER.

Slides:



Advertisements
Similar presentations
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Advertisements

Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Renewable Resources Development Report California Energy Commission Business Meeting November 19, 2003 Ann Peterson Project Manager Technology Systems.
1 March 2, 2009 FERC Conference on Integrating Renewables Washington, DC Hamid Elahi Integrating Renewables into Power Systems GE Energy.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
Center for Law, Energy & the Environment (CLEE) California Public Utilities Commission March 9, 2011 San Francisco, CA Energy Storage: Policy Overview.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
Update on the 2015 Special Study June 29, 2015 Arne Olson, Partner Nick Schlag, Managing Consultant Gabe Kwok, Senior Consultant.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Debra Lew NREL WestConnect Planning Meeting Western Wind and Solar Integration Study Update.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
1 Smart Grid ‐‐ What is it and how will it help California? Michael Gravely Manager Energy Systems Research Office California Energy Commission
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
Transmission Planning at the California ISO September 10, 2015.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
NWTC Wind Integration: What Have We Learned? Michael Milligan Consultant National Renewable Energy Laboratory Planning for Wind Workshop NW Power & Conservation.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
SPSC Low Carbon Tool: Interim Status Report CREPC/SPSC meeting San Diego, CA October 5, 2012 Arne Olson.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Republic of Kenya 1 ST DBA- AFRICA MANAGEMENT REVIEW INTERNATIONAL CONFERENCE RESEARCH AND INNOVATION FOR SOCIO-ECONOMIC DEVELOPMENT IN AFRICA Eng.
Overview and Status of Distributed Energy Resources Policy Docket Jay Griffin, Chief of Policy and Research Hawaii Public Utilities Commission August 4,
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
Western Wind Integration Study May 23, Agenda 10:00am - Introductions 10:15 –Overview of study - NREL –Analysis to be conducted and examples of.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
Large-Scale Renewable Energy: The Top Challenges Dick Kelly Chairman, President and CEO EPRI 2008 Summer Session August 4, 2008 Dick Kelly Chairman, President.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
CALIFORNIA ENERGY COMMISSION Renewable Energy Transmission Initiative (RETI)
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
RETI Workshop March 16, 2015 Arne Olson, Partner Lakshmi Alagappan, Sr. Managing Consultant Identifying High Value Renewable Resources.
1 R Workshop on 2016 RA proposals Energy Division Staff Procurement Oversight and Resource Adequacy California Public Utilities Commission Thursday,
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
Strategic Value Analysis (SVA) Strategic Location of Renewable Technology Based on Grid Reliability George Simons, CEC Ron Davis, DPC Presentation to the.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
JU September Stakeholder Engagement Conference Webinar #1
LNBA Subgroup: Avoided Transmission Value
Opportunities in the Changing Energy System
Scenario Scoping Process
Reliability Assessment Committee Reliability Workshop Priorities
Introduction to Growth Scenario Working Group
Reliability Assessment Committee Reliability Workshop Priorities
Scenario Scoping Process
California Transportation Electrification Activities
Presentation transcript:

1 Intermittency Analysis Project: 2010 Accelerated and 2020 Scenarios Dora Yen-Nakafuji, Commission Project Manager Kevin Porter, IAP Team Lead CEC PIER Staff Workshop February 13, 2007 Sacramento, CA

2 Agenda 9:00-9:15 am Welcome & Introductions – Yen/Porter 9:15-9:45 am Transmission Planning: CaISO Perspective – Gary DeShazo 9:45-10:15 amWind Turbine Technologies – BEW Engineering 10:15-12:00 Transmission Simulation – DPC Team 12:00-1:15 pm Lunch 1:30-4:30 pm Projected 2010 Accelerated and 2020 Impacts – GE Team 4:30-5:15 pm Discussions, Q&A – All 5:15-5:30 pm Next Steps & Feedback – Yen/Porter

3 IAP Objectives Focus on statewide transmission planning options to meet policy Focus on providing quantitative impacts (pros & cons) of various options on transmission reliability, congestions and mix of renewable technologies Develop tools and analysis methods to evaluate renewables along with conventional generation Provide a common perspective for evaluating different technologies competing for limited system resources Provide a common forum for Commissions, utilities and developers to examine the location and timing of new generation/transmission projects and public benefits of these resources Integrated Plan

4 IAP Scenarios T2010X2020 Peak California Load, MW 58,90062,600 74,300 Peak CaISO Load, MW 48,90051,900 61,200 Total Geothermal, MW 2,4004,1003,7005,100 Total Biomass, MW 7601,2001,0002,000 Total Solar, MW 3301,9002,6006,000 Total Wind, MW 2,1007,50012,50012,700

5 Project Core Analysis Team Analysis TeamCompanyActivity Kevin PorterExeter AssociatesTeam Lead; World- wide Experience Bill Erdman; Kevin Jackson BEW Engineering; Dynamic Designs Wind Turbine Technology DPC TeamDavis Power Consultants; PowerWorld Corporation; Anthony Engineering Transmission Planning, Power Flow Analysis GE TeamGE Energy; AWS Truewind; Rumla Inc. Production Cost Analysis, Statistical Analysis, Wind Forecast and Data Henry Shiu, Case van Dam, Michael Milligan, Brendan Kirby California Wind Energy Collaborative (UC Davis); NREL; Oak Ridge National Lab Data Support, Technology Characteristics, Integration Costs

6 Acknowledgments Utilities CPUC Renewable energy companies and trade associations Tehachapi and Imperial Study Groups CA ISO

7 Status of IAP Project Impact of Past, Present & Future Wind Technologies on Transmission & Operation Report - completed and posted on Commission website Workshop today - present preliminary results of 2010 Accelerated Case and 2020 Case Report on Lessons Learned from Europe and Asia in review Final reports on project in preparation

8 IAP Report Schedule Draft GE and DPC reports in early March for internal review Final reports will be made available on Commission website

9 Agenda 9:00-9:15 amWelcome & Introductions – Yen/Porter 9:15-9:45 amTransmission Planning: CaISO Perspective – Gary DeShazo 9:45-10:15 amWind Turbine Technologies – BEW Engineering 10:15-12:00Transmission Simulation – DPC Team 12:00-1:15 pm Lunch 1:30-4:30 pm Projected 2010 Accelerated and 2020 Impacts – GE Team 4:30-5:15 pmDiscussions, Q&A – All 5:15-5:30 pmNext Steps & Feedback – Yen/Porter

10 February 13 th IAP Workshop Closing Slides

11 Follow-on Efforts Continue supporting CaISO’s Strategic Transmission Planning (beyond 10yr perspective) Help prioritize transmission investments for sustaining growth and integration of renewables Refine wind integration analysis methodologies and forecasting capabilities Kick-off of Northern California Renewable Integration Effort Leverages IAP findings and focuses on sub-regional issues Focus on local requirements, generation mix specific to sub- region, transmission needs & operational flexibility, service area Scenario based approach fostering collaboration among utility stakeholders Support WECC’s wind turbine code validation effort Coordinated with PIER TRP effort Link CA resources to grid code development Investigate closer coupling of renewables and hydro- resources

12 Thank you Please provide questions & comments by February 28th, 2007 Send to Peter Spaulding and include “IAP Comments Feb 13” in header All workshop materials will be posted on Commission website For more information: Commission contact: Dora Yen-Nakafuji Project lead: Kevin Porter