11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Update on IDNO/DNO working group DCMF 12 November 2009.
Generation Dominated Areas Oliver Day 5 April | Energy Networks Association - DCMF.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Energynetworks.org 1 PRESENTED BY MARÍA ISABEL LIENDO, SCOTTISH POWER, ON BEHALF OF WORKSTREAM 2 Cost and Benefit allocation to DG under the CDCM 11 December.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
Generation Use of System Charges Nigel Turvey. Background Regulatory incentive allows: Recovery of a percentage of any reinforcement costs A value per.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 05 April | Energy Networks Association - DCMF.
11 December 2008 energynetworks.org 1 PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 3 Fixed Time Period DUoS Charging 11 December.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 3 December | Energy Networks.
EDCM update Mo Sukumaran (on behalf of CMG)
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
Structure of Distribution Charges A User’s perspective David Tolley Innogy & Npower.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
School Funding Formula (Agenda item 7). Overview Provide an overview of the formula headlines Final schools funding formula 2015/16 Base Formula.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 14 June | Energy Networks.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
10 September 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY Common Distribution Charging Methodology Impact Analysis.
ElectraLink Update on DCUSA Activities. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation10 (DCP 133, 159, 160, 161, 165,
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
DCUSA Update ElectraLink. The following Change Report are due to be presented to the DCUSA Panel at its meeting on Wednesday 16 January 2013: DCP 143.
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Structure of Charges Year-end review for DCMF 22 November 2007.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
Customer Charge On behalf of all DNs 25 October 2010.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Transmission arrangements for distributed generation DCMF 9 April 2008 Pre consultation document.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 02 February | Energy Networks Association - DCMF.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Demand Side Management Andy Pace 6 October | Energy Networks Association - DCMF.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
CMG and Workstream Update
Code Governance Review UNC Modification Proposals
CSS Update for CoMC 19th September 2018
Generation Dominated Areas(GDA)
Charging For Active Network Management / Flexible Connections
Presentation transcript:

11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation from Workstream 2 Development of the distribution reinforcement model 11 December 2008

December 11, 2008 energynetworks.org 2 Scope Workstream 2 have the responsibility for: Producing an overall timetable for the development of a charging model that can be adopted by the DNO’s; Supporting and advising the consultants that have to deliver the suite of charging models that cover the full spectrum of charges for all voltage levels, by the end of January 2009; Ensuring that the model is cognisant of decisions coming out of workstream 3 (tariff structures); and Identifying any issues with the proposed implementation and to provide alternative solutions. ToR from:

December 11, 2008 energynetworks.org 3 Deliverables Workstream 2 have the responsibility for: Identifying the main differences between DNO’s existing charging models to assist with the development of a common DRM model; Producing a process map detailing an overview of the model functionality; Developing spreadsheets which capture the requirements of the common methodology set out in Ofgem’s October decision document; and Documentation of the methodology.

December 11, 2008 energynetworks.org 4 Areas under consideration DRM Network Costs (500MW model) DRM strawman Operational Costs (Opex) IDNO’s Revenue Reconciliation Scaling (Fixed Adder) Allocation of costs for availability charges Tariff structures Reactive power charges EHV Modelling Time of day and time of year cost signals Generation charges Load & coincidence factor template Split of allowed revenue EHV sole use asset template Connection boundary Cost matrices

December 11, 2008 energynetworks.org 5 Progress DRM strawman A strawman based on the most recently updated DRM model has been chosen as the basis for illustrating the concepts and principles for the modelling. The model has then been updated to better reflect different aspects of Ofgem’s decision letter. The consultant will interact with DNOs to select the most desirable charging principles. Reactive power charges A sheet calculating reactive charges based on the ENW approach has been included in the strawman, although how the weighting factors (or “step 7 in ENW’s methodology) are to be applied is still to be resolved.

December 11, 2008 energynetworks.org 6 Progress DG yardsticks DG yardsticks have been added to the strawman, based on the DNO’s current interpretation of the decision document and the use of F-factors rather than coincidence factors (see presentation on Cost and Benefit to DG). Areas still to be resolved include whether benefits at the level of connection should be counted; the choice of F-factors per technology type and the final tariff structure. Coincidence factor template A template (separate from the strawman) has been prepared to allow companies to calculate the coincidence factor per yardstick group at time of system peak and the associated load factor. An alternative method to use the coincidence factors and load factors based on the use of DECs and peaking probabilities is being developed as a possible alternative or as a possible complimentary approach for STOD costing.

December 11, 2008 energynetworks.org 7 Progress Time of day and time of year cost signals The group has compiled the current approached used by all companies. A template has been presented to allocate costs on a day/night split basis and an alternative proposal has been offered that could include an allocation based on the time of year. Further work is being is been undertaken to understand if the use of the G3 DECs as another potential solution in this area. 500MW model One DNO has presented its 500MW model, for others to use it as a template for presenting their own. Discussions are still ongoing as to whether the charging model should include the replacement of services as well as reinforcement. It should be noted that this model excludes that part of the network whose costs are recovered normally through the connection charge.

December 11, 2008 energynetworks.org 8 Progress Allocation of costs for availability charges The group has compiled the current approaches used by all companies and looked at previous (academic and industry) reports on how to allocate the costs for availability charges. A decision is still to be reached. Split of allowed revenue The group received two worked examples on how the EHV/HV-LV split of the allowed revenue should be done (on the basis of MEAV) and will look at alternatives. This is still to be incorporated in the model.

December 11, 2008 energynetworks.org 9 Future areas of work Calculation of forecast O&M costs IDNO charges EHV sole use asset charges Representation of the network and tariff yardsticks as “cost- matrices” Allocation of scaling, as £/kVA or £/kW, into the customer/tariff yardsticks Incorporation of the tariff and tariff components, as specified by WS3 Minimum cost connection/Service models - discuss the possibility of having a generic network model representing HV and LV service assets. This will assist in the calculation of some cost elements of the fixed charge