Update on STAR AGS/RHIC Time Mtg February 18, 2014 Bill Christie Summary: We started looking for collisions Thursday morning (2/13/14). Determined the.

Slides:



Advertisements
Similar presentations
FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
Advertisements

4th July Two physics fill during the day Smooth data taking LHC plans changed: 90m run postponed to tomorrow (24h) OT FE still excluded, to be looked at.
Ain't It A Shame 1-4 Aint it a shame to work on Sunday, Aint it a shame, (a working shame,) Aint it a shame to work on Sunday, Aint it a shame, (a working.
STAR 62 GeV CuCu Event totals (as of 3/16/05, noon ) Total: Mevts of BBC Narrow Goal > 20 Mevts. BBC Narrow Trigger has been operational for 6 full.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to efficiently identify photons and electrons.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Measuring Time.
/t/ / I d/ /d/ Try Again Go on /t/ / I d/ /d/
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
STAR Ready to move on to 7.7 GeV Bill Christie For The STAR Collaboration April 13, Please N.B. All data plots shown in this presentation are online.
1 MTD Calibration for Cosmic Ray Triggered Data in RUN 10 at STAR Lijuan Ruan (BNL), Liang Li (UT Austin) 04/01/ Workshop on STAR MTD Production.
Objectives Monday, 8/22: –Describe at least 3 different people using the correct sequence of description in ASL –Explain at least 2 ways that a Deaf perspective.
Machine - Experiments January 12, 2005 Machine status.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Take part in the 2015 Annual Travel Survey Keep a note of how you travel to work between Saturday 10 th October and Friday 16 th October 2015 How did you.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
Click the button to begin. 12:25 What time does this clock show? 5:00 4:00.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
SDHCAL I.Laktineh TB strategy The PS TB was indented to validate the whole system (including the DAQ) and to select the right thresholds values.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
David Adams ATLAS DIAL: Distributed Interactive Analysis of Large datasets David Adams BNL August 5, 2002 BNL OMEGA talk.
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Teaching Time. This evening we will be… showing how maths strategies develop across the year groups show you the school’s calculations policy and how.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
Measurement of the Charge Ratio of Cosmic Muons using CMS Data M. Aldaya, P. García-Abia (CIEMAT-Madrid) On behalf of the CMS Collaboration Sector 10 Sector.
Good morning. Presented by Roksana Khanum Rimu Assistant Teacher Vagobanpur Government Primary School Sadullapur,Gaibandddha.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
TO PAST am - morning time (all times between midnight and midday). pm – afternoon and evening time (all times between midday and midnight).
RHIC Polarimetery A.Bazilevsky for RHIC Polarimetry group RHIC Spin Collaboration Metting April 10 (Friday), 2009.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
First collisions in LHC
The Standard Analysis chain
Calice Collaboration Meeting Sep. 2009
LHC Morning Meeting - G. Arduini
Friday morning 10:30 Optics measurements and corrections.
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Friday 25 bunch fill dumped just before (BLM in 5)
Presentation transcript:

Update on STAR AGS/RHIC Time Mtg February 18, 2014 Bill Christie Summary: We started looking for collisions Thursday morning (2/13/14). Determined the Global timing shift we had to make to get trigger signals into digitizer gates about 4 that afternoon. Got a start on calibrating trigger counters Thursday night. Tried continuing work on Trigger setup Friday night, but turned out that beams were mis steered at STAR, so no progress. Beams steered into collision at STAR again about 2 pm Saturday. Found that beams were barely hitting each other with the Thursday settings. Got second primary trigger detector calibrated by about 9 pm Sunday evening. Started running close to a full suite of Triggers on first Fill Monday morning (after PS failure in RHIC). Tweaking triggers today, but close to finished, and should be stable for remainder of the run. Continuing concern about un wanted beams ending up in STAR.

Some output plots from the High Level Trigger (online tracking trigger).

Believe that we indications the injection into Blue Beam has issues. Fill TOF VPD-West VPD-East

PXL residual from cosmic rays Use detector half survey. Project tracks from one half to other and look at residual Align one half relative to first, looks at deviation in x,y and z. First attempts for global alignment Schematic 2 PXL halves

Guess-estimate of how many “good” events we’re collecting per Fill Very crude estimate at this point: From a Fill this morning (17721) I estimate that there are 180, 000 “Good” events If I assume that each fill takes 1.5 hours, and only one is missed per day, we’d get 15 Fills per day. This gives (15 Fills/day)(180 kevts/Fill) = 2.7 Mevts/day If this is correct, and we start counting as of Midnight Sunday night, in 21 days we’d get (21 days)(2.7 Mevts/day) = ~57 Mevts. STAR Goal for this run is 150 Mevts of “Good” collisions. I’d estimate the uncertainty in this estimate to be at least +- 50%.