1 Status of the V0 electronics  Tests of photomultipliers  Signal treatment  Electronics  Milestones V0A V0C.

Slides:



Advertisements
Similar presentations
22/09/20041 PM and shoebox tests  Hamamatsu 19 and 16 dynodes compared to FEU dynodes  Jyväskylä’s shoebox (T0) V0A V0C.
Advertisements

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
Status of the LHCb RPC detector Giovanni Carboni - Roma 2 Introduction Detector requirements Ageing tests Oil vs. No-Oil Conclusions Report to LHCC - March.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
ALICE-V0A design, construction & proto beam-test Arturo Menchaca-Rocha for UNAM: Instituto de Fisica & Instituto de Ciencias Nucleares CINVESTAV: Mexico.
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
Time over Threshold Electronics for Neutrino Telescopy George Bourlis + multiplicity.
Requirements to RICH FEE Serguei Sadovsky IHEP, Protvino CBM meeting GSI, 10 March 2005.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
Evaluation of Silicon Photomultiplier Arrays for the GlueX Barrel Calorimeter Carl Zorn Radiation Detector & Medical Imaging Group Jefferson Laboratory,
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
29/ Jens Jørgen Gaardhøje, NBI, Forward Detectors TDR FMD, T0, V0 Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI)
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
V0, jyg, ALICE week, March Preparing for the V0 TDR (Lyon-Mexico project)  The V0 detector in 3 chapters  1 - Tests and simulations of detection.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
PMT Readout and Floor Triggering Charge estimation using the times over the thresholds Event Building and Triggering + multiplicity George Bourlis.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, Goal: Build a Test Stand that can test and characterize 10 PMTs. Assumptions about MINERvA Electronics:
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Production PMT Testing and Work on Site with Prototype Tank University of California, Los Angles Department of Physics and Astronomy
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
CDMS II Shielding To Installation To Construction From Design.
V0 present status of the V0 project at CERN A. Sandoval, R. Alfaro.
The photomultiplier tubes selection for KM2A electromagnetic particle detectors (EDs) hou chao IHEP The 2nd workshop of air shower detection at high altitudes.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
"North American" Electronics
PreShower Characterisations
WBS 1.03 Readout Systems Specifications, Design and Acceptance
Why we need an improved LASER calibration system
SiPM calibration Tagir Aushev (ITEP).
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Brief Status SPS Prototype PSB Prototype Installed in LS1
Jean-Sebastien Graulich, Geneva
The KLOE calorimeter front end electronics
Alternative FEE electronics for FIT.
Focusing Aerogel RICH with SiPM Photodetectors
Hellenic Open University
Rafael Ballabriga Suñé Xavier Xirgu Aleixandre
Front-end electronic system for large area photomultipliers readout
Conceptual design of TOF and beam test results
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
Department of Physics and Astronomy,
Development of hybrid photomultiplier for Hyper-Kamiokande
MEG II実験 液体キセノン検出器の建設状況
Scintillator HCal Prototype
R.TIEULENT - ALICE Offline Week
Presentation transcript:

1 Status of the V0 electronics  Tests of photomultipliers  Signal treatment  Electronics  Milestones V0A V0C

2 Photo-multiplier from T0R5505R5946R7761 Tube/cathode Ø/length32/20/6525/17.5/4038/27/5039/27/50 Number of stages HV max Gain 2000 V at 0 T/0.5 T2/ / / / Rise/transit (ns)1.5/61.5/5.61.9/7.22.6/7.5 Dark current (typ/max) (nA)5/205/30 15/100 Pulse linearity (2%) (mA)?

3 Charge, gain, time resolution Signal x m cable

4 Pulse treatment

5 FEE

6 Timing for BB and BG C C C A A A

7 Minimum-bias triggers  Starting from the discriminator or the NINO signal  BB signal detected in time windows centered at +11 ns (V0A) and +3 ns (V0C)  BGA signal detected in time windows centered at -11 ns (V0A) and +3 ns (V0C)  BGC signal detected in time windows centered at +11 ns (V0A) and -3 ns (V0C) bbc bba

8 V0 mechanics milestones Fall 2004: End 2004: March 2005: sector ‘0’ of V0A (Mexico) and V0C (Lyon) PRR submission Fall 2005: V0C ready for commissioning,… PMT characterization (Lyon) (MIP from each channel,… noise, gain of each PMT) End 2005: V0A ready for commissioning,… PMT characterization (Mexico) (MIP from each channel,… noise, gain of each PMT) Spring 2006: June 2006: V0C ready for installation in ALICE (array + fibre bundles + PMT mechanics) End 2006: V0A ready for installation in ALICE (array + fibre bundles + PMT mechanics)  Responsibles: Mechanics: J.Y. Grossiord (Lyon), XXXX (Mexico)

9 V0 electronics milestones Fall 2004: electronics concept finalization End 2004: CIU design prototype test (charge, time, pre-process of triggers) March 2005: Fall 2005: (final trigger signal, collection of the data, …interface TTC/FEE) CCIU and TTCIU design prototype test PRR submission End 2005: CIU, CCIU, TTCIU electronic design, setting Spring 2006: electronics design ready for realization June 2006: electronics construction End 2006: electronics test, calibration electronics ready for installation in ALICE  Responsibles: Electronics: Y. Zoccarato

10 V0 milestones Fall 2004: electronics concept finalization End 2004: CIU design prototype test March 2005: sector ‘0’ of V0A (Mexico) and V0C (Lyon) PRR submission Fall 2005: V0C ready for commissioning, PMT characterisation (Lyon) CCIU and TTCIU design prototype test PRR submission End 2005: V0A ready for commissioning (Mexico) CIU, CCIU, TTCIU electronical scheme Spring 2006: electronics design ready for realization June 2006: V0C ready for installation in ALICE electronics construction End 2006: V0A ready for installation in ALICE electronics test, calibration electronics ready for installation in ALICE  Responsibles: Electronics: Y. Zoccarato Mechanics: J.Y. Grossiord (Lyon), XXXX (Mexico)

11 V0 cost for 64 channels (R5946) labelunitspareunit pricetotal price PM R HV SY2527/A1733P1/6-8812/ VME Electronics Mechanics PM + boxes Scint. V0A/V0C (m 2 )2 x WLS F. V0A/V0C (m)2 x Clear F. V0A/V0C (m)2 x Total in € Total in SF HV cab. V0A/V0C (m) HV con. V0A/V0C(448)-4756 Sig. cab. V0A/V0C (m)2 x Sig. con. V0A/V0C(2 x 576) Total in SF365333