SPACE TECHNOLOGY & APPLICATIONS INTERNATIONAL FORUM (STAIF -98) Conference on Next Generation Launch Vehicles E5 - Cost & Operations A NOVEL METHODOLOGY.

Slides:



Advertisements
Similar presentations
LCC YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT.
Advertisements

Financial Management F OR A S MALL B USINESS. FINANCIAL MANAGEMENT 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
MANAGERIAL ACCOUNTING
Slide 5.1 4E1 Project Management Financial and Other Evaluation Techniques - 1.
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
A Tale of Two Cities: Financial Assumptions. 1 A Tale of Two Cities: Key Assumptions and Data Points Broadway Financial Projections Revenue Projections:
Architecture Team Industry Day Briefing 17 January, 2002.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Where’s My Shuttle? (.com) By David Mora and Matt Russell.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. May 31 Capital Budgeting Decisions.
DECISION-MAKING SYSTEMS Decision Support Software.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 13 Measuring and Evaluating Financial Performance.
W. Frank Dell II, CMC DELLMART & Company. DELLMART & COMPANY2 AGENDA INTRODUCTION ACTIVITY BASED COSTING PLMA MODEL MODEL APPLICATIONS.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
Breakeven Analysis for Profit Planning
1 TRADITIONAL PRODUCT COSTING METHODS Accounting Principles II AC Fall Semester, 1999.
COMSTAC Launch Operations Support Working Group October 24, 2006 Jim Ball Spaceport Development Manager NASA Kennedy Space Center Spaceport Development.
Cost Management. learning objectives cost/volume/profit (CVP) relationships and break-even analysis break-even chart – low fixed costs, high variable.
Introduction of the City Manager’s Proposed Fiscal Year 2012 Budget January 3, 2011 Sanford Miller, City Manager Robert Rusten, Assistant City Manager.
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
Week 10 DIFD 321 Accounting & Finance. WHAT IS MARKETING? The action or business of promoting and selling products or services, including market research.
Business Validation Mark Szczerba Roll Global. Introduction Brief introduction Business Models & Definitions Capital Requirements & Reducing Risk Variety.
Chapter 5 Supply. Definition of Supply Supply – the willingness and ability of producers to offer goods and services for sale.
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Chapter 10 Adelman & Marks
On Target Group Coaching
McGraw-Hill/IrwinCopyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 13 Measuring and Evaluating Financial Performance PowerPoint.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 13 Measuring and Evaluating Financial Performance.
Real Estate Investment Chapter 11 Tools of Analysis © 2011 Cengage Learning.
Chart Your Course to Business Success On Target Business Intensive: Session 6 May 1, 2012 Advisors On Target 1.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Setting Your Fees Project Cost and Setting Your Fees.
Financial Project Metrics in Feasibility Study
Copyright  2006 Pearson Education Canada Inc
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
DECISION-MAKING SYSTEMS Decision Support Software.
Suborbital Experiment Platform Presented to National Council of Space Grant Directors Executive Committee October 30, 2007 James E. Ball Spaceport Development.
$70,142,119 Total Reductions  Reduced by $32.54 million ◦ 190 Unfilled district positions ◦ Contingency Fund eliminated ◦ Departmental.
Business management is frequently faced with making decisions about price. How will I set prices? What should pricing accomplish? What about “loss-leaders”?
Chapter 3 Financial Management Part 2 BCN 4772 Summer 2007.
Simulation Based Operational Analysis of Future Space Transportation Systems Alex J. Ruiz-Torres Information and Decision Sciences, COBA, UTEP Edgar Zapata.
The Nature of Costs Chapter Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
National Aeronautics and Space Administration Transitioning Toward the Future of Commercial Human Spaceflight COMMERCIAL CREW PROGRAM AIAA Spring Dinner.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
11 Space Transportation Policy and Market Risks Panel 5 – International Customers, Competitors and Partners The George Washington University Elliot School.
Shuttle Program1 Rockets – The Space Shuttle Ted Spitzmiller.
The Decision Maker. Managing a Profitable Company.
Business Acceleration Program Fall 2015 Session October 22, 2015.
Roadmap for Long Term Sustainable Space Exploration and Habitation Defining the Functional Requirements for Early Phase of Space Habitation AIAA 2015-????
 Explain what it means to budget, and identify reasons to maintain a budget.  Create and maintain a budget that supports personal and financial goals.
Confidential & Proprietary Internal Kaplan Use Only. CAPITAL PROJECT ANALYSIS Unit 7.
Launch Structure Challenge - Background Humans landed on the moon in 1969 – Apollo 11 space flight. In 2003, NASA started a new program (Ares) to send.
(Crash-Course in understanding the Allen Weiss Excel Pro Forma Model) J. Gunderson Dec12.
Propulsion Economic Considerations for Next Generation Space Launch by Chris Y. Taylor 40th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit.
A “Back of the Envelope” Look at Space Launch Vehicle Costs by Chris Y. Taylor Jupiter Research & Development 2004 AIAA Houston ATS NASA/JSC April 16,
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Chapter 10: Kay and Edwards
Compound Interest and the Net Operating Income
Kennedy Space Center Connecting Mid-Atlantic Space Grants with Spaceport and Range Technology and Science Thrust Areas Michael Freeman, PhD
Rockets – The Space Shuttle
UNIT 6 COSTS AND PRODUCTION: LONG AND SHORT-RUN, TOTAL, FIXED AND VARIABLE COSTS, LAW OF DIMINISHING RETURNS, INCREASING, CONSTANT AND DIMINISHING RETURNS.
Introduction First established as Federal Express, today’s FedEx Corporation is one of the most recognized brands for their express delivery system, FedEx.
Michael W. Maier Space Traffic Management Conference
NASA Hypersonic Research
Ch. 11 – Income MAnagement Budgeting.
Ch. 12 – Income MAnagement Budgeting.
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Pricing Strategies & Statement Analysis
Capacity Planning For Products and Services
Presentation transcript:

SPACE TECHNOLOGY & APPLICATIONS INTERNATIONAL FORUM (STAIF -98) Conference on Next Generation Launch Vehicles E5 - Cost & Operations A NOVEL METHODOLOGY FOR ESTIMATING UPPER LIMITS OF MAJOR COST DRIVERS FOR PROFITABLE CONCEPTUAL LAUNCH SYSTEM ARCHITECTURES January 25-29, 1998 Albuquerque, N.M. RUSSEL RHODES/NASA RAYMOND BYRD/BOEING KENNEDY SPACE CENTER, FL.

A NOVEL METHODOLOGY FOR ESTIMATING UPPER LIMITS OF MAJOR COST DRIVERS FOR PROFITABLE CONCEPTUAL LAUNCH SYSTEM ARCHITECTURES Introduction: Process enables "quick look" estimations and evaluations to effectively determine if a concept provides focus for leapfrog improvement (Relies on existing cost estimating tools for input) A back of the envelope technique for fast, timely, on-the-spot, assessment of affordability (profitability) of commercial space transportation concepts Cost Charts are provided to determine relationships and/or upper limits Process will enable user to develop "cost and price per payload unit to orbit" supplemental to basic vehicle cost estimates for determining concept's ability to achieve system-profitability goals Technique will allow architectural concept developer or user to easily determine concepts' conformance to system required objectives

A NOVEL METHODOLOGY FOR ESTIMATING UPPER LIMITS OF MAJOR COST DRIVERS FOR PROFITABLE CONCEPTUAL LAUNCH SYSTEM ARCHITECTURES Discussion on the Use of Charts and Assumptions That Apply to Each: COST Non-recurring cost –Acquisition Cost Recurring Cost –Acquisition Payback Cost –Labor Cost –Replacement Hardware Cost –Propellant Cost PRICE Recurring Factors –Debt Service –Insurance –Profit PAYLOAD CAPACITY IS ASSUMED TO BE 20,000 LB. TO LOW EARTH ORBIT, IF PAYLOAD CAPACITY IS 2X ASSUMED, COST/UNIT TO ORBIT VALUES ARE 1/2 THOSE SHOWN; OR, IF PAYLOAD CAPACITY IS 1/2 ASSUMED, THE VALUES ARE 2X THOSE SHOWN

A NOVEL METHODOLOGY FOR ESTIMATING UPPER LIMITS OF MAJOR COST DRIVERS FOR PROFITABLE CONCEPTUAL LAUNCH SYSTEM ARCHITECTURES Tutorial Exercise Using the Charts to Understand the Bounds for Major Cost Related to a Profitable Space Transportation System: ASSIGNED ASSUMPTIONS –Investment where recurring cost are controlled at $200/pound to orbit –Price controlled at $400/pound to orbit –One (1) Billion dollar vehicle investment for two (2) vehicles total –One (1) Billion dollar ground infrastructure investment –Labor cost 10% of total cost ($20/pound to orbit) –Replacement hardware cost 10% of total cost ($20/pound to orbit) –Propellant cost 10% of total cost ($20/pound to orbit) –Acquisition investment payback in 5 years –Flight 50 times per year per vehicle (100 flights/year total) –Vehicle payload delivery to orbit of 20,000 pounds each flight –Investment mony acquired at 20% simple interest for 5 years ($1 billion) –Insurance 1% vehicle investment exposed ($500 million/year)

A NOVEL METHODOLOGY FOR ESTIMATING UPPER LIMITS OF MAJOR COST DRIVERS FOR PROFITABLE CONCEPTUAL LAUNCH SYSTEM ARCHITECTURES Assessment From The Charts: –From the acquisition chart for 5 year payback, yields $100/pound to orbit and left $100/pound for other operating costs –Infrastructure investment by Spaceport and charged through fees –Labor, replacement hardware, and propellant cost = $60/pound to orbit –Debit service accounts for $1billion over 5 yrs. or $100/pound to orbit which leaves $100/pound to cover insurance –Profit was a loss of $110/pound because insurance cost of $250/pound to orbit Limit vehicle cost to 1/2 of assigned ($250 million/each) and check –Now acquisition chart for 5 years payback yields $50/pound to orbit –Debit service now is $1/2 billion over 5 years or $50/pound to orbit –Total operating cost is $110/pound to orbit –Insurance cost $125/pound to orbit plus debit service of $50/pound –Gross income would be $ = $115/pound to orbit (reasonable?) High !

0 1B 2B 3B 4B 5B 6B 7B FLIGHTS /YEAR $800/lb to orbit $400/lb to orbit $200/lb to orbit $100/lb to orbit $50/lb to orbit TOTAL ACQUISITION COST - $ BILLIONS Sum of principal + simple interest = 0.5Pr+0.5In $1600/lb to orbit FIGURE 1c. Total Acquisition 20 % & 5 year payback

FLIGHTS/YEAR FLIGHTS /DAY TOTAL ACQUISITION COST - $ BILLIONS Sum of principal + simple interest = 0.33Pr+0.67In 0 8B 16B 24B 32B 40B 48B 56B $800/lb to orbit $400/lb to orbit $200/lb to orbit $100/lb to orbit $50/lb to orbit $1600/lb to orbit FIGURE 1d. Total Acquisition 20 % 10 year payback

0 2B 4B 6B 8B 10B 12B 14B FLIGHTS /YEAR TOTAL ACQUISITION COST - $ BILLIONS Sum of principal + simple interest = 0.33Pr+0.67In $800/lb to orbit $400/lb to orbit $200/lb to orbit $100/lb to orbit $50/lb to orbit $1600/lb to orbit FIGURE 1b. Total Acquisition 20 % & 10 year payback

FLIGHTS /YEAR TOTAL ACQUISITION COST - $ BILLIONS Sum of principal + simple interest = 0.5Pr+0.5In 0 2B 4B 6B 8B 10B 12B 14B $800/lb to orbit $400/lb to orbit $200/lb to orbit $100/lb to orbit $50/lb to orbit $1600/lb to orbit FIGURE 1a. Total Acquisition 10% & 10 year payback

MANPOWER (HEADCOUNT) $5/lb to orbit $10/lb to orbit $20/lb to orbit $40/lb to orbit $80/lb to orbit K FLIGHTS/YEAR $20,000/lb to orbit (Early 1990's Shuttle curve) $5,000/lb to orbit (Early 1990's KSC ops contractor curve) ,000 12,000 24, ANNUAL LABOR COST - $ MILLIONS FIGURE 2a. Recurring Labor $ 40/hr average rate

FLIGHTS/YEAR ANNUAL PROFIT- $ MILLION(Assumed Operations $200/lb to orbit) 25% or $50/lb to orbit 20% or $40/lb to orbit 15% or $30/lb to orbit 10% or $20/lb to orbit

FLIGHTS/YEAR ANNUAL PROFIT- $ MILLION(Assumed Operations $800/lb to orbit) 25% or $200/lb to orbit 20% or $160/lb to orbit 15% or $120/lb to orbit 10% or $80/lb to orbit

A NOVEL METHODOLOGY FOR ESTIMATING UPPER LIMITS OF MAJOR COST DRIVERS FOR PROFITABLE CONCEPTUAL LAUNCH SYSTEM ARCHITECTURES Relationship of Orbiter Orbit Stay Time and Time Available for Non-scheduled 50 flights per Year per Vehicle: –For 2 days in orbit each flight, would utilize 100 days a year –Leaves only 265 days for ground turn-around operations, including payload and propellant servicing and both scheduled & un-scheduled maintenance –Assuming an operational availability factor of 0.90, leaves 26.5 days per year, or an average of 12.7 hours per flight for un-scheduled maintenance – For (airline-like) 1/4 day in orbit each flight, would utilize days a year –Leaves only days for ground turnaround operations –Assuming an airline-like operational availability factor of 0.98, leaves 5.5 days per year, or an average of 21.7 minutes per flight for un-scheduled maintenance High availability and minimum orbit stay time add synergistically to enable the promise of an operable and responsive (affordable) space transportation system

A NOVEL METHODOLOGY FOR ESTIMATING UPPER LIMITS OF MAJOR COST DRIVERS FOR PROFITABLE CONCEPTUAL LAUNCH SYSTEM ARCHITECTURES MAJOR COST DRIVER RELATIONSHIPS "1994" SHUTTLE BENCH MARKS Total Program Budget $ 4,973.4 Million –Labor Cost $ 3,445.9 Million or Headcount of 37,147 FTE's –Hardware & Materials $ 1,527.4 Million $ 14,210/# to Orbit or $ Million/Flight Shuttle Operations Only $ 3,375.7 Million –Hardware & Materials $ Million –Labor Cost $ 2,454.7 or Headcount of 28,461 FTE's Labor –Total Program $ 3,445.9 Million or Headcount of 37,147 FTE's $ 9,846/# to Orbit or $ Million/Flight Shuttle Operations only $ 2,454.7 Million or Headcount of 28,461 FTE's $ 7,014/# to Orbit or $ Million/Flight KSC Labor Cost $ 637 Million or 8,657 FTE's $ 1820/# to Orbit or $ 91 Million/Flight Launch Operations $ Million or 7,547 FTE's Orbiter Logistics $ Million or 1110 FTE's –SSME Logistics $ Million or 869 FTE's

A NOVEL METHODOLOGY FOR ESTIMATING UPPER LIMITS OF MAJOR COST DRIVERS FOR PROFITABLE CONCEPTUAL LAUNCH SYSTEM ARCHITECTURES MAJOR COST DRIVER RELATIONSHIPS "1994" SHUTTLE BENCH MARKS CON'T Replacement Parts Support Labor "Covered Above" –$ Million $ /# to Orbit or $ 15.8 Million/Flight Orbiter $ 40.5 Million $ Million or 1110 FTE's SSME $ 41.4 Million $ Million or 869 FTE's Ground Systems $ 28.8 Million $ 12.2 Million or 219 FTE's Propellants Support Labor "Covered Above" –$ 10 Million $ 6.6 Million or 60 FTE's $ 28.57/# to Orbit or $ 1.43 Million/Flight Number of Launches Completed in FY-1994 –7 Flights $ 9,645/# to Orbit or $ Million/Flight = $ 3,375.7 Million