Doc.: IEEE 802.11-06/1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 1 TGn Closing Report – September ‘06 Date: 2006-09-21 Authors: Notice:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Advertisements

Doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 1 WNG SC Closing Report Notice: This document has been prepared to assist IEEE
Doc.: IEEE /1588r0 Submission October 2006 Bruce Kraemer, MarvellSlide 1 TGn ad hoc Opening Report – October 17 ‘06 Notice: This document has.
Doc.: IEEE /1807r2 Submission November 2006 Matthew Fischer (Broadcom)Slide 1 TGN adhoc MAC subgroup report for November 2006 Notice: This document.
Doc.: IEEE /1936r0 Submission December 2006 Bruce Kraemer, Marvell Adrian Stephens, IntelSlide 1 TGn Proposed Draft Revision Notice Notice: This.
Doc.: IEEE /1528r0 Submission 22 September 2006 Naveen Kakani, Nokia, IncSlide 1 TGn PSMP adhoc Group September Closing Report Notice: This document.
Doc.: IEEE /2112r1 Submission Peter Loc, MarvellSlide 1 TGn LB97 Frame Format Ad Hoc San Francisco, July 2007 Notice: This document.
TGn ad hoc Opening Report – July 31 ‘06
Coexistence Motions for LB84 Comment Resolution
LB84 General AdHoc Group Sept. Closing TGn Motions
TGn ad hoc Opening Report - January ‘07
TGn ad hoc Opening Report – July 31 ‘06
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
TGn ad hoc Opening Report – July 31 ‘06
TGn Sync Atlanta Presentation on Confirmation
IEEE WG Status Report – July 2005
TGn ad hoc Opening Report - January ‘07
IEEE White Space Radio Contribution Title
TGn ad hoc Opening Report - January ‘07
Waveform Generator Source Code
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
TGp Closing Report Date: Authors: March 2006 Month Year
TGn PSMP ad hoc Agenda – September 14 ‘06
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
TGn Frame Format Ad Hoc Status and Motions
JTC1 Ad Hoc Mid-week Report
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGn ad hoc Opening Report – July 31 ‘06
TGn ad hoc Opening Report – July 31 ‘06
TGs San Diego Closing Report
IEEE WG Opening Report – July 2008
TGn Closing Report – November 05
TGn PSMP Adhoc Group Dallas Opening report
TGu-changes-from-d0-01-to-d0-02
IEEE White Space Radio Intended timeline
TGn MAC ad-hoc November Agenda
TGn PSMP Adhoc Group Dallas Opening report
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGp Closing Report Date: Authors: March 2007 Month Year
TGn LB97 Frame Format Ad Hoc San Francisco, July 2007
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
Liaison Report From Date: Authors: Month Year
TGn Draft Redline Notice
Beamforming and Link Adaptation Motions
TGn Proposed Draft Revision Notice
TGn Closing Report Montreal, Quebec, CA 802 Interim – 18 May ‘07
November 2012 Opening Report
September 2012 Opening Report
TGn Draft Comparison Notice
TGn Closing Report – July ‘06
TGn Closing Report Orlando, FL, US 802 Plenary – March ‘07
TGn Draft Comparison Notice
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGw Chair’s Report Date: Authors: July 2006 Month Year
PSMP Adhoc Oct TGn Adhoc
Beamforming and Link Adaptation Motions for LB 84 Comment Resolutions
TGn Closing Report - July 19 ‘07
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGn MAC ad-hoc November Agenda
TGr Proposed Draft Revision Notice
Presentation transcript:

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 1 TGn Closing Report – September ‘06 Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Name Company Address Phone Bruce Kraemer Marvell Garth Hillman AMD 5402 East Ben White, Austin TX (512) Sheung Li Atheros 529 Almanor Ave, Sunnyvale, CA (408) Adrian STEPHENS Intel Corporation 15 JJ Thompson Avenue, Cambridge, CB3 0FD, UK +1 (503) om 5488 Marvell Lane, Santa Clara, CA, 95054

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 2 Letter Ballot #1 Comments EditorialTechnical Editorial & Technical UniqueDuplicate

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 3 Comment Allocation Technical Approved in July Approved in September -will appear in D1.05 Pending 3124 ~

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 4 Ad Hoc Reports Ad Hoc Topic.xls resolution file #Revision as of Sep 21 8 pm Beamforming & Adaptation67538 PSMP68732 General68836 MAC69036 PHY69346 Editorial70617 Frame Format71736 Coexistence72426 CA Doc73104

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 5 Comment Resolution Events Weekly teleconferences Ad hoc – Melbourne, AU Sep ‘06 Interim – Melbourne Sep ‘06 Ad hoc – West coast Oct 17 – 19 ’06 –Move to Portland approved unanimously –Intel Cornell Oaks venue details and hotel options on following slides Ad hoc – Dallas Nov 9-11 ’06 Location is guaranteed (OK to book flights) –Guest room space is available in the Hyatt – IEEE rooms only start Sat 11/11 –Meeting location in Hyatt not secured, may be nearby Plenary – Dallas Nov ‘06 Ad hoc – London Jan ’07 –Working to secure Metropole – will know within 2 weeks Interim – London Jan ‘07 Blue – Some uncertainty

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 6 Travel Directions to Intel Cornell Oaks Campus in Beaverton Oregon Map and directions from PDX to Cornell Oaks Campus for Oct 17 th – 19 th IEEE Ad Hoc Meetings Cornell Oaks Campus Map Local Hotels

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 7 Intel Cornell Oaks Campus NW Greenbrier Pkwy Beaverton, Oregon Portland Airport to Intel CO1 Building From terminal, take Airport Way to I-205 South (exit right on I-205). Proceed 2-3 miles to I-84 West (follow signs to Portland city center). Follow signs to Beaverton, Hwy 26 West & I-405 (left two lanes). You will be crossing the Marquam Bridge. As you come off the bridge, stay in the second left lane, and then take the 3 rd exit right Hwy 26 West & 12 th Ave (right). Continue on Hwy 26 West approx 8 miles to the CORNELL RD. EXIT 65- toward BETHANY BLVD. Turn LEFT onto NW CORNELL, and turn LEFT onto NW 158TH AVE, and then Turn LEFT onto NW GREENBRIER PKWY, ending at NW Greenbrier Pkwy RETURN TO PORTLAND AIRPORT Exiting campus on NW 158 th Ave, turn left to Hwy 26 exit east towards Portland. Approaching Portland, stay in right lane through 1 st and 2 nd tunnel. Follow signs to I-405 and I-84 East towards “The Dalles”. After crossing the Marquam Bridge, follow I-84 East and signs to airport. Exit at I-205 North/ Portland airport. Airport is approximately 20 miles from Jones Farm Campus. Please allow a minimum of 45 Minutes travel time during rush traffic.

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 8 Intel Cornell Oaks Site NW Greenbrier Pkwy Suite C Beaverton, OR Attendance Confirmation (503) Enter via the CO1 Entrance Security badges will be ready for registered AdHoc participants Continental Breakfast & Lunch will be provided Wireless Internet Connectivity will be available to all participants at the Intel Facility

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 9 October ad hoc Local Hotels These are some of the hotels available The Benson Hotel 309 SW Broadway Portland, OR Reservations: (503) Estimate Rate: $ Homewood Suites Gateway Court NW Beaverton, OR Reservations: (503) Estimate Rate: $N/A Hilton Garden Inn Gateway Court NW Beaverton, OR Reservations: (503) Estimate Rate: $N/A The Four Points by Sheraton 50 SW Morrison Portland, OR Reservations: (503) Estimate Rate: $ Downtown PortlandClosest to Meeting Site Fairfield Inn and Suites NW Gateway Court NW Beaverton, OR Reservations: (503) Estimate Rate: $65

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 10 Basic October ad hoc Plan 1. Book your own flights and hotels 2. Register via (503) 3. Meeting pattern –0745: Breakfast set up – breakfast & group business –0830 : Begin ad hoc meetings –1000: morning tea –1230: Lunch –1500: afternoon tea –1800: recess for the day 4. 4 rooms available for concurrent meetings

doc.: IEEE /1500r0 Submission September 2006 Bruce Kraemer, MarvellSlide 11 Teleconferences Wednesday 11:00 – 13:00 ET Blocking events Ad hoc groupNotes Sept 20Interim Sept 27None Oct 04General Oct 11Coex Oct 18Ad hocNone Oct 25(WiFi)Coex Nov 01PHY Nov 08Ad hocNone Nov 15PlenaryNone