SPP Presentation. Retail Open Access for ETI within SPP Implementation Considerations Stakeholder Meeting February 21, 2007 Austin, Texas.

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

Market True-Up Discussion RMS Meeting 03/13/02 Draft Only for Discussion Purposes.
Distributed Generation (DG)
Amendment 3/5 Workshop.
ERCOT: A Work In Progress Board of Directors Austin, TX July 16, 2002.
Market Operations Presentation Board of Director’s Meeting November 18, 2003.
Ent. 7, 12 Krasnopresnenskaya Embankment, Moscow, , Russia Administrator of Trading System (ATS) Russian Power Exchange.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
SPP.org 1. Status Update: Retail Open Access for ETI within SPP Stakeholder Meeting September 16 th, 2008 Austin, TX.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
Loads Acting as a Resource Relationships with QSEs and LSEs
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Billing, Settlement Disputes & Data Extracts
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Vanus J. Priestley Philip R. O’Connor. Ph.D.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
1 LSE Certification Process ERCOT August 23, 2006.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
ERCOT MARKET EDUCATION
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
Bulk Power Transmission System
Advanced Metering Implementation Team Update Christine Wright Public Utility Commission of Texas October 2008.
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
June 22 and 23,  The information and/or flow processes contained in this Power Point presentation: ◦ Were created to allow interested parties to.
June 17, Strategic Framework Business Definition and Strategic Issues Board of Director’s Meeting June 17, 2003 ERCOT Strategic Planning Task Force.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
COMMERCIAL OPERATIONS ORGANIZATION Betty Day Director, Commercial Operations (office) (cell) (fax)
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
ERCOT MARKET EDUCATION Retail 101. Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
ERS Update – DSWG Presentation September 21, 2012.
Texas Competitive Market & Governance October 4, 2015.
Distributed Generation Registration June 30, 2008.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
SPP.org 1. Status Update: Retail Open Access for ETI within SPP Stakeholder Meeting June 20 th, 2008 Austin, TX.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
1 Market Participant Default Joint Taskforce Update and Report on Recent Customer Transition Activity Report to WMS August 17, 2005.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
1 RMS Update to RMWG June 6, Market Process for Solar & Wind Devices Retail customers are purchasing and installing wind and solar equipment on.
ERCOT MARKET EDUCATION
Reflecting Losses in DR within ERCOT August 22, 2012
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Presentation transcript:

SPP Presentation

Retail Open Access for ETI within SPP Implementation Considerations Stakeholder Meeting February 21, 2007 Austin, Texas

3 The Public Utility Commission of Texas (“PUCT”)  In Docket No , the PUCT ordered Entergy Gulf States, Inc. to request that SPP study the possibility of integrating Entergy’s Texas service area into the SPP region in order to support retail open access in the area.  Web site:

4 The Electric Reliability Council of Texas, Inc. (“ERCOT”)  ERCOT’s role as registration agent:  Maintains the centralized registration database for the entire state  Serves as the transaction clearing house for all retail transactions  Compiles information on transaction performance metrics  Addresses data discrepancies and dispute resolutions  Acts as the test administrator for retail qualification and testing  ERCOT’s role for wholesale market settlement (ERCOT Region):  Data acquisition, load profiling, data aggregation, settlements and billing.  Data extracts provides market participants with information about choice of provider, usage levels, profile codes, region codes, nodal codes, loss codes, station codes, zip codes.

5 ERCOT, cont.  ERCOT’s retail market rules:  The ERCOT Protocols ( cols/current.html), particularly Sections 14 through 19, 23 and 24  The ERCOT Retail Market Guide ( s/retail/index.html)

6 Southwest Power Pool (“SPP”)  Independent System Operator and Regional Transmission Organization with a footprint spanning eight states, including a portion of Texas.  Manages the reliability and markets defined in its Open Access Transmission Tariff. The OATT provides one-stop shopping for regional transmission service with consistent rates and terms. Customers have direct accesses to generation resources residing anywhere inside SPP’s service territory.  Will be responsible for coordinating REP access to the SPP transmission system and markets  Will be responsible for defining data requirements for load data to be provided by ERCOT, utilizing this data in scheduling and settlement, and providing market participants the data needed to shadow these processes.

7 Entergy Texas Inc. (“ETI”)  ETI is the distribution service provider for its service area. It would register in ERCOT’s system as a TDSP (transmission and/or distribution provider).  ETI would also need to create an affiliated REP to serve its customers unless and until they switch to a new provider.  In order to support customer choice, ETI would need systems capable of interacting with ERCOT and REPs to support the high volume of retail transactions.  TDSPs provide services essential to effectuating customer choice, including meter reading and providing switch acknowledgments.

8 Retail Electric Providers (“REPs”)  REPs make retail sales to end-users in areas where customer choice exists. These entities cannot own generation or wires facilities (although they may be affiliated with companies that do).  Each premise served by a REP is represented by an Electric Service Identifier (ESI ID) in ERCOT’s system.  REPs must register and test with ERCOT and any new TDSP in order to serve customers in the TDSP’s area.  REPs, after certification by the PUCT and ERCOT, may compete for customers in areas open to retail electric competition (note: municipal and cooperative service areas may opt out of competition).  Non-ERCOT REPs must pay a per-ESI ID fee (Non-ERCOT Load Serving Entity fee) for use of ERCOT’s registration system – currently set at $1.15 per ESI ID per year.

9 ETI as a TDSP in ERCOT’s Registration System for Retail Transactions  ETI and all ESI IDs for its service area must be entered into ERCOT’s registration system (similar process/costs whether ETI becomes part of SPP or ERCOT).  Testing process for ETI as TDSP and all REPs (including ETI’s affiliated REP) (similar process/costs whether ETI becomes part of SPP or ERCOT).  End-to-end test of the retail commercial processes that occur in the Texas market. REPs and TDSPs must test with each other and ERCOT in order to ensure transaction capability.  Test flights are held three times per year.  Web site:

10 Data Transfer – ERCOT to SPP  Types of data available in ERCOT’s system:  Choice of provider, usage levels, profile codes, region codes, nodal codes, loss codes, station codes, zip codes, ESI ID.  UFE, Transmission Losses, Distribution Losses  Weather-Zoned Load Profiles  Data transfer process:  ERCOT and SPP will need to coordinate to establish frequency, formats, values included, etc.

11 ROA Relationships SPP QSEs ERCOT ETI as TDSP REPs (LSEs) ERCOT customer registration data transactions (no $$ change hands) SPP scheduling & settlement Generatio n Companie s Bilateral contracts ETI area load data to SPP Transmission access, data exchange and settlement ($) Wires Companie s Coordination of transmission facilities

12 SPP’s Open Access Transmission Tariff and scheduling system  Direct access to more than 200 generation resources, subject to transmission access.  Network Integration Transmission Service (NITS) provides access from all sources in the SPP region for a single MWh rate based on wholesale energy usage.  Point-to-point service offers a “pay per use” supplement or alternative to NITS.  Substantial economic purchase opportunities available via non-firm transmission service.  A REP would function as a type of Load Serving Entities (LSE) under SPP’s OATT.  All LSEs must arrange transmission service.

Transmission Service Integration in Other Markets  Other jurisdictions have integrated retail access with their wholesale markets  Examples of options to consider  Pennsylvania/PJM  Retailers within PJM can take NITS or PTP Service  Massachussettes/ISO-NE  Retailers and load aggregators allocated a pro-rata share of local utility transmission costs  Implementation implications  Potential process changes  Potential system changes if data required for different types of cost allocations  Potential changes to settlement systems

14 SPP’s Energy Imbalance Service Market  Real-time balancing energy market – ancillary services are self-provided (LSEs must procure own ancillary services)  LSEs must identify (1) capacity (bilateral contracts or committed generation) available to service load (but need not schedule the energy from that capacity) and (2) the load points to be served.  Locational imbalance pricing (nodal) aggregated from the bus level  No day-ahead market (bilateral markets used)  Physical transmission rights  Self-commitment of resources by owners allowed  Voluntary offers by resource entities may be submitted  Energy schedules are made using reservations  Settlement for imbalance energy  Uninstructed deviation charge  Hourly settlement, weekly invoicing  Dispatch is regional and is calculated using a security constrained, offer- based economic dispatch (SCED) every 5 minutes

15 SPP’s Future Market Plans  SPP Stakeholders are currently assessing the costs and benefits of future market steps.  Design elements of the market that are currently under consideration:  Nodal market design  Day ahead bid-based energy and capacity market  Ancillary service markets for contingency and regulating reserves  Congestion rights hedges (financial instruments)  Consolidation of SPP into a single regional balancing authority  An RFP for the cost-benefit study is currently in the hands of potential vendors  Later this year, SPP stakeholders, including regulators, will review the results and determine the next phase of market implementation. REPs would have the opportunity to participate in the shaping of the market design.

16 Technical issues in integrating competitive retail load data into scheduling and settlement in SPP markets  Nodal busses with multiple load entities behind them are assigned a fixed percentage of load at the bus. This percentage can only change once per month.  This factor affects all charges that could be allocated to load and ultimately affects price settlement.  It is used in real-time and in after-the-fact settlement.  SPP’s settlement system may need to accommodate an increased amount of data depending on how much ERCOT will be able to aggregate the load data before providing it to SPP.  REPs will need to obtain transmission service for a variable amount of load (possible options: use procurement process already in tariff for LSEs or have ETI procure transmission service on REP’s behalf).

17 Options for achieving competitive retail load data integration in SPP systems (integrating data from ERCOT into SPP systems)  SPP builds systems in house to accommodate additional data and allow for settlement and resettlement based upon accurate load quantities.  SPP out-sources the data aggregation and settlement for retail customer data.  SPP uses its current system with workarounds (less accuracy as to load share, the fixed percentages of load at a bus would only be updated once per month to reflect new providers selected by customers).

18 To do list  Coordinate with ERCOT to provide business requirements for the data transfer project  Goal to determine retail load data transfer process (and determine number of nodes in ETI area)  Determine high level cost estimates for potential solutions and cost allocation  Identify changes needed in SPP’s tariff to accommodate new market participants  ERCOT will need to evaluate the costs of aggregating and sending needed load data to SPP

SPP QPR Project Schedule

Project Schedule

Future Meeting Dates  Stakeholder Meetings  Wednesday, April 16 th  Thursday, June 19 th  Additional meetings anticipated for August and October time frame  Monthly project meetings held on alternative months

Contact SPP To Sign Up for SPP’s ETI Study List contact General Inquiries: