1 RHIC Run-15 p-p Head-on beam-beam compensation Wolfram Fischer, Xiaofeng Gu (liaison physicist), S.M. White, Z. Altinbas, D. Bruno, M. Costanzo, J. Hock,

Slides:



Advertisements
Similar presentations
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Advertisements

1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Beam-beam studies for eRHIC Y. Hao, V.N.Litvinenko, C.Montag, E.Pozdeyev, V.Ptitsyn.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
30 min DCI Hall, LAL Orsay October 2010
AAC 2006V.Shiltsev 1 Electron beam generation and control in Tevatron Electron Lenses Vladimir Shiltsev, R.Hively, V.Kamerdzhiev, G.Kuznetsov, H.Pfeffer,
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
1 BeamBeam3D: Code Improvements and Applications Ji Qiang Center of Beam Physics Lawrence Berkeley National Laboratory SciDAC II, COMPASS collaboration.
Wolfram Fischer1 2 superconducting 3.8 km rings 2 large, 1 small experiments 100 GeV/nucleon Au 250 GeV polarized protons Performance defined by 1. Luminosity.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Beam-Beam Simulations for RHIC and LHC J. Qiang, LBNL Mini-Workshop on Beam-Beam Compensation July 2-4, 2007, SLAC, Menlo Park, California.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
RHIC Status Time Meeting 2/3/2015 He is fixed into the ice at the center to which flow all the rivers of guilt; and as he beats his great wings as if to.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Long-range and head-on beam-beam compensation studies at RHIC with lessons for the LHC W. Fischer, N. Abreu, R. Calaga, Y. Luo, C. Montag, G. Robert-Demolaize.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Luminosity expectations for the first years of CLIC operation CTC MJ.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
Scattered electrons as possible probes for beam halo diagnostics. P. Thieberger, C. Chasman, W. Fischer, D. Gassner, X. Gu, M. Minty, A. Pikin Speculations.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
BROOKHAVEN SCIENCE ASSOCIATES Electron Cooling at RHIC Enhancement of Average Luminosity for Heavy Ion Collisions at RHIC R&D Plans and Simulation Studies.
Vladimir Shiltsev Considerations on Beam-Beam Compensation with Electron Lenses in LHC April 27, 2006.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
Beam-Beam effects in MeRHIC and eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory Jan 10, 2009 EIC Meeting at Stony Brook.
Beam-Beam Interactions Tatiana Pieloni (BE-ABP-ICE) Thanks to W. Herr.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Six-dimensional weak-strong simulations of head-on compensation in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
RHIC head-on beam-beam compensation with e-lens N. Abreu, W. Fischer, Y. Luo, C. Montag, G. Robert-Demolaize J. Alessi, E. Beebe, A. Pikin 1. Introduction.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
ApEx needs for CeC PoP Experiment December 11, 2015.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
Electron lens studies in support of RHIC / LHC Wolfram Fischer 28 July 2010 Fermilab Accelerator Advisory Committee Meeting.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Beam-beam effects in eRHIC and MeRHIC
Test of Optical Stochastic Cooling in CESR
09:00, 45 min total => 45 slides (~5 slides are only titles)
Beam-beam R&D for eRHIC Linac-Ring Option
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Presentation transcript:

1 RHIC Run-15 p-p Head-on beam-beam compensation Wolfram Fischer, Xiaofeng Gu (liaison physicist), S.M. White, Z. Altinbas, D. Bruno, M. Costanzo, J. Hock, A. Jain, Y. Luo, C. Mi, R. Michnoff, T.A. Miller, A.I. Pikin, T. Samms, Y. Tan, R. Than, P. Thieberger,... Brookhaven National Laboratory 23 February 2015

2 Wolfram Fischer Head-on beam-beam compensation Phase space Compensation of: 1.Tune spread => e-p has same amplitude dependent force as p-p => e-lens 2.Resonance driving terms => phase advance between p-p and e-p is  = k  => lattice e-beam lens focuses p-beam lens defocuses

3 Wolfram Fischer RHIC electron lenses Motivation Bunch intensity in 2012 polarized proton physics store bunches with 1 collision bunches with 2 collisions Goal: Compensate for 1 of 2 beam-beam interactions with electron lenses Then increase bunch intensity  up to 2× luminosity beam-beam parameter

4 Wolfram Fischer Status e-lenses Blue: Gun baking completed (cathode replace after found short) [new cathodes with 7.5 mm radius vs. 4.1 mm radius; suppress potential beam-beam instability] Yellow: DC beam demonstrated up to 700 mA (almost sufficient for Run-15) Aligned e- and p-beam with backscattered electrons (equivalent luminosity monitor) yesterday morning Store 18706, beginning 2pm yesterday, was first physics store with lensing

5 Transverse alignment Backscattered electrons 2 BPMs in both lenses to bring e- and A- beam in proximity BPMs see 3 beams: 2 hadron and 1 electron beam (rise/fall time 10x longer) Use detection of backscattered electrons to maximize overlap P. Thieberger, BIW12, IBIC2014 Signal with large dynamic range (~10 6 ) Used for automatic position and angle alignment, same as luminosity maximization

6 Wolfram Fischer E-lens off E-lens on (200 mA)  ~ 4%/h After alignment

7 s  ~ 2%/h (100 mA) 18706

8 Wolfram Fischer Next steps e-lenses Yellow: Gradual increase in current, allows for increase in Blue bunch intensity Angle alignment (APEX) Blue: Cathode conditioning (heater) Increase duty cycle from 0 to 100% Increase current to ~700 mA (needs some dedicated time) Operation in parallel to physics stores (100 mA, non-colliding) Alignment Colliding operation Gradual increase in current, increase in Blue bunch intensity Angle alignment (APEX)

9 100 GeV p  +p  projection for Run-15 Wolfram Fischer 9 Run-15 Improvements compared to Run-11: OPPIS performance, e-lenses => increase in N b from 1.6 to 2.0x10 11 abort kicker, dump, protection masks (replace bumps) We are here Reach max slope here

GeV p  +p  performance to date for Run-15