2 nd Workshop, 3 - 5 April 2006 Session 4: Integrating ASAS in an evolving ATM system.

Slides:



Advertisements
Similar presentations
DIRECTION TECHNIQUE CERTIFICATION Ce document est la propriété intellectuelle de Dasssault Aviation.Il ne peut être utilisé, reproduit, modifié ou communiqué
Advertisements

ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
1 Managed Airspace or Free Flight by Steve Zerkowitz Assistant Director Infrastructure Europe IATA.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
2005 International Federation of Air Traffic Controllers’ Associations Anthony Smoker IFATCA ASAS-TN2 Second Workshop Roma, 3rd-5th April 2006.
Information Management – where next? Ken Reid Head of International Technical Relations EUROCONTROL.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation sous-direction Etudes et Recherche appliquée direction des services.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
North Atlantic Systems Planning Group (NAT SPG)
SESAR Single European Sky Air traffic management Research
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Team Date: October 11, 2006 Federal Aviation.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
4 th Workshop, Amsterdam, April 2007 ASAS-TN2 Fourth Workshop Sponsored by European Commission DG:RES “ASAS, a Reality Check”
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Airbus Status on ADS-B In / Out Update
ASAS Thematic Network 2.5 Towards an ASAS-Global Network.
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
Discussions Summary ASSTAR - Crossing & Passing session.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
ASAS TN Third Workshop, April 2004, Toulouse 1 Session 2 Functional and Technical issues and Solutions Chairperson : JC Richard Secretary : G Matrella.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
ASAS-TN 3rd Workshop - Airbus ASAS Status ASAS-TN 3 rd Workshop AIRBUS ASAS Status ASAS-TN 3 rd Workshop - Airbus ASAS Status Presented by : Patrick LELIEVRE.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS TN Third Workshop, April 2004, Toulouse Session 1 Use of the System by pilots and controllers Tony Henley.
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
4 th Workshop, Amsterdam, April 2007 Progress since 2003 First workshop in 2003 (Rome) Large number of successful R&D projects in US and Europe.
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
ASAS Thematic Network II First Workshop Savoy Hotel, Malmö.
3 rd Workshop, Glasgow, September 2006 ASAS–TN2 Workshop Sponsored by European Commission DG:RES ASAS: Civil and Uncivil Practices.
ASAS TN2 Final Seminar Paris, April 2008 LEGAL ASPECTS OF ASAS Dr. Francis SCHUBERT Head Corporate Development / skyguide.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
ASAS Thematic Network ASAS Now!.
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Chris Shaw, EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
Karim Zeghal EUROCONTROL Experimental Centre
Session – 4: Existing ICAO Standards relating to Air Traffic Control
English Language in ATC
Presentation transcript:

2 nd Workshop, April 2006 Session 4: Integrating ASAS in an evolving ATM system

2 nd Workshop, April 2006 Reminder of day 1 Progress, Plans and Challenges Phil Hogge

2 nd Workshop, April 2006 European and US progress and plans In Europe CASCADE reported concrete progress towards ADS-B implementation –Currently more than 40% of aircraft in Europe are ADS-B out equipped …but not certified! –Pre-operational ADS-B ground surveillance from and onwards JPDO in US presented: –Next Generation Air Transportation System (NGATS) vision –FAA ADS-B program status Final investment decision July 2006 Implementation from 2006 to 2025

2 nd Workshop, April 2006 High-level issues and challenges IAPA –Interrelations between ACAS and ASAS have been analysed –Potential constraints on ASAS highly dependent on applications and separations (No more RAs with a minimum separation of 5 NM) ICAO –ICAO is distancing itself from technical details –Unfortunately if not in ICAO Annexes lose legal status –Focus on Ground surveillance applications of ADS-B but little enthusiasm for Airborne surveillance applications

2 nd Workshop, April 2006 Pilot and controller perspectives IFALPA: Package I not an issue (no transfer of responsibility) If transfer of responsibility, need for new and strict regulation Move to live onboard trials with all normal safeguards IFATCA The provision of “Information” to the flight deck will have an affect upon the control process for controllers and pilots Responsibility for separation must be unambiguous Do not underestimate the amount of training that will be required

2 nd Workshop, April 2006 Key points from debate Try to avoid word ASAS and include each application naturally with other ATM changes. RFG is the right path to ICAO. EUROCAE/RTCA in touch with ICAO For adopting ASAS do controllers and pilots need marriage counselling? Important time now in next couple of months to get ASAS in SESAR