1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ 07458 Budgetary and Cost.

Slides:



Advertisements
Similar presentations
Traditions and Innovations
Advertisements

CPS ® and CAP ® Examination Review MANAGEMENT, Fifth Edition By Haney and Mazzola ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River,
Accounting 6310 Chapter 6 – Budgeting.
Chapter9 Profit Planning.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
1 Budgeting Dr. Varadraj Bapat Module 14.. Management Accounting Dr. Varadraj Bapat, IIT Mumbai 2 Index  Introduction  Objectives  Advantages  Components.
Profit Planning 4/14/04 Chapter 9. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Planning and Control Planning -- involves developing objectives.
Standard Costing and Variance Analysis
Budgeting.
Chapter 9 BUDGETING A budget is a formal written statement of management’s plans for a specified future time period, expressed in financial terms Control.
Project Management Session 7
Master Budgeting Chapter 8
Chapter 7 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Profit Planning.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Budgeting According to hotel management consultant Kirby Payne, ‘Managing expenses is among the most important things a manager does. (I never say it.
Chapter 7 Administration of the Fire Department
Chapter 7 The Master Budget.
Profit Planning (Master Budgeting). Learning Objective 1 Understand why organizations budget and the processes they use to create budgets.
Introduction to Hospitality, 6e
Internal Auditing and Outsourcing
Reaching Goals: Plans and Controls
Chapter 20 The Budgeting Process.
Copyright © The McGraw-Hill Companies, Inc 2011 PROFIT PLANNING Chapter 8.
Quality and Quantity Control
22 Budgeting Accounting 26e C H A P T E R Warren Reeve Duchac
Budgeting - 1 BUDGETING Sales projections Business trends Inventory needs New competition ? ? ? ?
1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Office Equipment.
1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Appraising Performance.
9 - 1 ©2003 Prentice Hall Business Publishing, Essentials of Auditing 1/e, Arens/Elder/Beasley Internal Control and Control Risk Chapter 9.
©2003 Prentice Hall Business Publishing, Auditing and Assurance Services 9/e, Arens/Elder/Beasley Internal Control and Control Risk Chapter 10.
DR. J.ARUL SURESH DEPARTMENT OF COMMERCE LOYOLA COLLEGE,C HENNAI.
BUDGETING Reference – Mgmt Accounting –Reddy and Sharma.
The Managerial Process
Evaluation of Internal Control System
Chapter 7 The Budget Process. 1. What is the importance of the budgeting process? 2. How do the advantages and disadvantages of imposed budgets and participatory.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
John Wiley & Sons, Inc. © 2005 Chapter 19 Budgetary Planning Prepared by Barbara Muller Arizona State University West Principles of Accounting Kimmel Weygandt.
Chapter 22 Master Budgets
Fire and Emergency Services Company Officer — Lesson 9 Fire and Emergency Services Company Officer, 4 th Edition Chapter 9 — Administrative Functions.
1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Job Evaluation.
Budgetary Planning and Control
C h a p t e r 20 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Break-even analysis Break-even point Budget.
DEFINITION OF MANAGEMENT INTRODUCTION TO MANAGEMENT AND ORGANIZATIONS.
CPS ® and CAP ® Examination Review MANAGEMENT, Fifth Edition By Haney and Mazzola ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River,
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 7 Profit Planning.
Budgetary Planning and Control. BudgetsBudgets  The formal documents that quantify a company’s plans for achieving its goals.  For many companies, the.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Nine Profit Planning.
© 2010 The McGraw-Hill Companies, Inc. Profit Planning Chapter 9.
1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ The Organizing.
Chapter – 1 Nature and Scope of Cost Accounting
1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Job Analysis Chapter.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 (c) Ghanendra Fago (M. Phil, MBA) Master Budgeting.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 17 Budgeting.
1 Profit Planning Chapter 9. 2 The Basic Framework of Budgeting A budget is a detailed quantitative plan for acquiring and using financial and other resources.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Budgeting Unit 4 Further aspects of management accounting Mr. BarryA-level Accounting Year 13.
McGraw-Hill/Irwin Chapter 8 Profit Planning. 9-2 Learning Objective 1 Understand why organizations budget and the processes they use to create budgets.
1 Copyright © 2008 Cengage Learning South-Western. Mowen/Hansen Profit Planning Chapter Seven Fundamental Cornerstones of Managerial Accounting.
Planning Planning is considered the most important element of the administrative process. The higher the level of administration, the more the involvement.
The Budgeting Process 7. OBJECTIVE 1: Define budgeting, and explain budget basics.
CONTROLLING Welingkar’s Distance Learning Division CHAPTER-17
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Flexible Budgets & Performance Reports
COST ANALYSIS FOR CONTROL
Amity Business School Amity School of Business BBA, II SEMESTER COST AND MANAGEMENT ACCOUNTING.
Budgeting for Planning and Control
Foundations of Planning
CHAPTER 21: BUDGETARY PLANNING
Presentation transcript:

1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Budgetary and Cost Control Chapter 25

2 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Budgeting Is a planning process. Budgetary Control Is the process of regulating the operating budgets of the organization.

3 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Purposes of Budgeting Helps ensure the organization’s operations are performed more efficiently. Helps management maintain the cost- effectiveness of the organization’s operations. Helps the organization better plan for the future.

4 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Advantages of Budgeting (1 of 2) Advantages of Budgeting (1 of 2) 1. It requires adequate management consideration of the organization’s policies. 2. It requires that department-level managers develop practices that facilitate the attain- ment of budgetary goals. 3. It requires that managers identify the resources necessary for accomplishing the organization’s goals.

5 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Advantages of Budgeting (2 of 2) Advantages of Budgeting (2 of 2) 4. It helps management make accurate, timely decisions regarding various organizational operations. 5. It helps management determine which functions are not operating efficiently. 6. It helps management determine which functions are experiencing difficulty in achieving goals and objectives.

6 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Limitations of Budgeting 1. Because budgeting is based on estimates, the validity of the budget is, to a large extent, determined by the accuracy with which the estimates are made. 2. The operating effectiveness of an organization is clearly dependent upon how well management is able to motivate employees to operate within the budgeted allowances. 3. The effectiveness of the budget is, to a large extent, dependent upon the accuracy with which budget revisions are made.

7 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Prerequisites for Successful Budgeting Proper Organization Financial Data Commitment of Top Management

8 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Proper Organization Requires the presence of these characteristics: 1. The proper group of tasks within functions, definitive lines of authority, and areas of responsibility. 2. Definitive lines of authority and areas of responsibility. 3. Lines of communication.

9 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Financial Data Unless needed data are available, the basis for budget development does not exist. Types of financial data needed: 1. Number of units sold during the previous financial period. 2. The relationship between the number of units sold and the cost incurred in producing these units. 3. Emerging financial trends.

10 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Commitment of Top Management For the process to work well, management must be committed to the use of the budget as a control mechanism.

11 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Elements of Budget Preparation Determining the Budget Period Developing the Budget Revising the Budget

12 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Determining the Budget Period Involves determining the length of the period, which generally coincides with the organization’s fiscal period. Length should be sufficiently long to compensate for any seasonal fluctuations.

13 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Developing the Budget Two types of budgets: Departmental Budget Master Budget Is a unit budget. Is a composite of unit budgets.

14 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Responsibility for Budget Preparation Must Be Assigned Responsibility for Budget Preparation Must Be Assigned In larger organizations, it is often the responsibility of the controller or treasurer. In other organizations, it is often the responsibility of the vice president who is concerned with the organization’s financial areas. A budget committee is also involved in many instances.

15 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Types of Office Costs (1 of 2) Types of Office Costs (1 of 2) Fixed Costs Costs that remain constant regardless of the number of units produced. Rent, insurance, and taxes are examples. Variable Costs Costs vary proportionately in relation to the output levels. Materials and supplies are examples.

16 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Types of Office Costs (2 of 2) Types of Office Costs (2 of 2) Semivariable Costs Costs increase as production increases but not in a direct proportion to production increases. Photocopier charges are an example.

17 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Guiding Principles of Budget Preparation 1. Employee participation in budget preparation is advantageous. 2. Budget should reflect realistic estimates of operating costs. 3. Budget must provide for unforeseen circumstances. 4. Employees should feel committed to the budget.

18 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Revising the Budget Is generally required because of uncontrolled or unforeseen circumstances that require the expenditure of the organization’s financial resources. Techniques for Revising the Budget Techniques for Revising the Budget Periodic review Progressive review Moving review

19 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Periodic Review Budget is revised at predetermined times for the remainder of the year. Budget can be reviewed every month, every two months, every quarter, etc.

20 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Progressive Review Uses standard time spans, perhaps 6 months. Involves revising the budget at specified times and for a constant length of time.

21 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Moving Review Budget is revised every month. As one month is completed, the same month for the next year is included in the revision.

22 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Zero-Based Budgeting (1 of 2) Is a budgeting concept that requires the re- evaluation of every program and expenditure each time a year’s budget is prepared.

23 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Zero-Based Budgeting (2 of 2) Involves these steps: 1. Describe each discrete organizational activity in a decision package. 2. Evaluate and rank these decision packages in terms of a cost-benefit analysis. 3. Allocate resources on the basis of need.

24 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Guidelines to Follow When Preparing Budget Reports Guidelines to Follow When Preparing Budget Reports 1. Exception situations should be pointed out. 2. When presenting figures in a report, a comparison base should be given. 3. To assist the reader, information should be summarized whenever possible. 4. When appropriate, reports should include interpretative information. 5. Reports should be standardized as much as possible. Preparing the budget report is a frequent part of budgetary control.

25 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Common Sections of Budget Reports Purpose of the Report Presentation of Financial Data Summary Conclusions Recommendations

26 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Cost Control Is concerned with the expenses incurred in performing various office operations. Is also concerned with keeping expenditures as low as possible.

27 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Objectives of Cost Control 1. To develop standard costs for various office operations. 2. To develop, within the employees, a desire to be cost conscious. 3. To assist in the development of efficient operating procedures. 4. To allocate the costs of operations to the appropriate functions. 5. To identify inefficient operations.

28 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Techniques for Controlling Office Costs Standard Breakdowns Standard Costs Cost Analysis Studies Taking Corrective Action

29 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Cost Breakdowns This technique involves determining what percentage of the total cost of an operation is classified as a salary or a labor cost, for example. Includes Several Categories Salaries Supplies and/or Materials Overhead

30 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Standard Costs This technique involves determining the unit costs of various office operations. Once the unit cost is determined, it can be compared with comparable standard costs.

31 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Cost Analysis Studies This technique involves comparing the cost of a current period’s operations with those of a prior period.

32 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Taking Corrective Action When analysis indicates that corrective action is necessary, those in positions of responsibility must take corrective action.

33 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Areas for Which Office Costs Can and Should Be Controlled Areas for Which Office Costs Can and Should Be Controlled Personnel Supplies and Materials Equipment Work Processes Overhead

34 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Personnel The cost of personnel is likely to be the largest budget item; therefore, personnel costs provide greater flexibility than do other areas.

35 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Supplies and Materials Costs This involves keeping supplies and materials costs to a minimum, minimizing the number of different forms used, and using equipment that facilitates the interchange of supplies.

36 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Equipment Costs This involves purchasing reliable equipment as well as the early trade-off of equipment that has higher-than-average repair charges.

37 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Work Process Costs Special attention should be devoted to developing efficient work processes.

38 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Overhead Costs Because some overhead costs are variable, controlling them should be a conscious effort of employees.