3 rd June 2007Report on Beijing Tracking Review Chris Damerell 1 ILC Detector R&D Tracking Review 5-8 February 2007 Chris Damerell RAL On behalf of the.

Slides:



Advertisements
Similar presentations
Project Monitoring Evaluation and Assessment
Advertisements

Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
9 January 2006RDB Meeting – Chris Damerell 1 ILC Detector R&D Chris Damerell Rutherford Appleton Lab  ILC Detector R&D Panel and charge  Addendum to.
H.Weerts March 10, 2006LCWS06--Bangalore 1 WWS Detector R&D H.Weerts Argonne National Lab Report from the WWS R&D panel For the WWS R&D panel: J-C. Brient,
5Feb07 Beijing GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Closing remark Weiguo Li, IHEP 9 th ACFA workshop and GDE Meeting Feb. 7, 2007 IHEP, Beijing.
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
7 th February 2007ILC ACFA workshop - Beijing 1 ILC Detector R&D Tracking Review – Progress Report Chris Damerell RAL On behalf of the ILC Detector R&D.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
6-7 April 06 MAC Review Global Design Effort 1 The Global R&D Board Bill Willis GDE Columbia University.
How we’re organizing ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Advisory Meeting December 11, 2006 Tracking Review at Beijing.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
7th November 2006ILC Regional meeting - Valencia 1 ILC detector R&D – new organisation Chris Damerell RAL On behalf of the ILC Detector R&D Panel (a Panel.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
14 April 2006RDB Meeting – Chris Damerell 1 ILC Detector R&D US Funding Needs Chris Damerell  Established funds in FY05 and required funds from FY06 for.
Discussion session José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
22 September 2006 Global Design Effort 1 The Global R&D Board Status Bill Willis GDE Columbia University.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
4th Concept Detector G P Yeh TILC08, Sendai, Japan Mar. 3-6, 2008.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
How to organize ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Tracking Meeting December 8, 2006 Tracking Review at Beijing.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
ILC Detector R&D Tracking Review 5-8 February 2007
The DBD: Outline and Scope
ILC Global Design Effort
Barry Barish GDE Caltech
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
J. Seeman SLAC Paris Super-B 5th Workshop May 9-11, 2007
Preliminary Project Execution Plan
Presentation transcript:

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 1 ILC Detector R&D Tracking Review 5-8 February 2007 Chris Damerell RAL On behalf of the ILC Detector R&D Panel (a Panel of the World-Wide Study Organising Committee) (Jean-Claude Brient, Chris Damerell, Ray Frey, Dean Karlen, Wolfgang Lohmann, Hwanbae Park, Yasuhiro Sugimoto, Tohru Takeshita, Harry Weerts)

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 2 To be included in every regional workshop from now on: –Beijing (Feb ’07) Tracking (Ch D) –DESY (LCWS June ’07) Calorimetry (Wolfgang Lohmann) –Fermilab (Oct ’07) Vertexing (Hwanbae Park) –Asia (Feb ‘08) PID, muon trkg, solenoid, beam diagnostics, DAQ Our responsibility is to work with the R&D collaborations to ensure that the feasibility of their critical goals can be demonstrated by This means (for tracking) that the community can be confident that the option they choose will satisfy the challenging physics needs We reviewed the LCTPC, CLUCOU, SiLC and SiD tracking R&D collaborations We were extremely impressed by the great progress made by all these groups, in some cases with very limited resources However, we concluded that we are currently far from the goals, for all tracking options Overview of these reviews

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 3 What is at stake It could be that both detector tracking systems will work well, or one well and one badly, or both badly. How to achieve the first outcome? (maybe not by following the easy compromise of ‘one of each technology’) Tracking technology Detector ADetector B Gaseous + Silicon ?? All Silicon??

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 4 Structure of this review Collaboration reports provided an overview of the projects through to ‘completion’ of R&D, meaning ‘ready for engineering design and construction’ Open session presentations provided summaries of status and plans Closed session was used to clarify technical and organisational issues, and to discuss their needs for additional resources Closeout session: Committee informed collaborations of our draft recommendations, and tried (with partial success) to obtain their verbal agreement Report was released by the WWS-OC chairs on 22 nd May, along with appendices from 2 of the 4 the R&D collaborations, in which they discuss areas of disagreement. See the Detector R&D Panel Wiki page

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 5 Building a tracking system with excellent performance for  p >7 degrees will be challenging. Feasibility is not yet demonstrated Why not simply move on to the ‘engineering designs’ of these tracking systems and study their performance with Geant 4? There is a risk that such designs would be too optimistic. Forward tracking has generally performed badly. We all know the solution (drastic reduction in material budget) but can this be achieved in practice? The committee concluded that this crucial question, on which a great deal of ILC physics depends, could not be answered only by adventurous designs We became convinced of the need to construct large prototypes (~1 m diameter), and operate them under ILC-like beam conditions in a 3-5 T field, to establish what performance will be achievable at ILC, both for central and forward tracking Until such tests are completed successfully, we do not consider that any of the three options proposed (all-silicon, TPC-plus-silicon, or drift-chamber-plus-silicon) could be considered ready for selection as an ILC tracking system [a unanimous recommendation of the committee, but not every collaboration agrees with this; maybe we are wrong] As well, our experts made numerous detailed suggestions (see the report) which we hope are proving useful to the groups in optimising their R&D programmes Main technical recommendations

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 6 A possible split-coil solenoid Estimated cost ~$800k (Elwyn Baynham industrial contacts)

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 7 We were encouraged by the success of the task-forces that provide world-wide coordination of the ILC accelerator R&D, to wonder about the utility of a Tracking Coordination Group (TCG) NOT some external body (like the Review Committee) but one or two ‘insiders’ from each R&D group, plus perhaps cross-members from the Vertexing CG and the Test-beam CG They would be free to work out their own charge, within some very general guidelines, possibly as follows: Negotiate for suitable funding for infrastructure (comprising a custom-designed test beam, solenoid, etc,), coordinate the use of these facilities, and ensure objective evaluation and presentation of the test results An important by-product would be that these individuals would rapidly become THE experts on every aspect of the world-wide tracking R&D, and hence become a valuable source of wisdom for the community The choice of technologies will as usual be made by experiment collaborations in conjunction with the IDAG, but the TCG would aim to inform those decisions in the most objective way possible Organisational considerations

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 8 Lessons from the ILC accelerator task forces 7 of them formed by the RDB January-May 2006 for all R&D areas of the machine They have functioned ‘better than any of us could have expected’ (Bill Willis) To learn about their achievements, look at the slides from the MAC review of ILC R&D, held in Fermilab April, Judging from their example, the TCG should not be given a detailed charge – that is something for them to work out. The TFs have (not surprisingly) contrasting styles of working What matters is not the charge, but the motivation and dedication of the members of the TF/Coordination Group However, it isn’t only a question of their motivation. These TFs could not have flourished without being embedded in a supportive structure (GDE management) The suggested Research Director for Detectors (and directorate) provides an opportunity to consider how best to achieve equivalent functionality for our R&D community

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 9 Spend on ILC detector R&D is considered by the community to be seriously inadequate (see R&D Panel Report of January 2006). Are these real needs or ‘unrestrained desires’? The first of the R&D reviews (on tracking) confirmed the urgent need for some increase in resources Our committee echoed the comment of one of the collaborations: ‘Ultimately, the greatest R&D risk is that insufficient resources will be directed towards achieving the goals of this plan’ We hope that the proposed ILC Detector Directorate, working with the funding agencies and lab directors, will help to secure the needed resources, just as the GDE is doing for the machine We should be very careful not to weaken the R&D groups (in order to support the Engineering Designs) just when they are most in need of support. The ILC physics programme depends on R&D which cannot be completed before about 2012, in the case of tracking and several other arreas Resources

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 10 Some worrying comments, during the past couple of weeks –‘We have a perfectly adequate tracker design. We don’t need any more R&D’ –We want to make the final choice of tracking systems in 2008 –‘We don’t want to do much more R&D. We want to build it, and if it doesn’t work, we’ll fix it’ –‘We cannot be doing R&D forever. Let’s form collaborations and get on with the Engineering Design’ Remember Richard Feynman’s words of good advice – ‘Reality has to take precedence over Public Relations, for Nature cannot be fooled’

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 11 Additional material

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 12 ILCSC MAC GDE-EC RD** IDAG RDB Det R&D Panel Task forces S0-S7 Coordination groups One possible structure for coordination of detector R&D, for consideration Accelerator R&D collaborations Detector R&D collaborations XXX not yet formed **The recently- suggested Research Directorate for ILC Detectors, including the WWS-OC NO INTERNAL CHANGES

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 13 S0/1 RF cavities Lutz Lilje S2 Cryomodules/string tests Tom Himel, Hasan Padamsee S3 Damping rings Andy Wolski S4 Beam delivery system Andreij Seryi S5 Positron source John Sheppard S6 Controls S7 Main linac RF Chris Adolphsen These TFs typically organise the R&D into WPs, hold phone meetings at 1-2 week intervals, hold occasional workshops, review progress on baseline and alternatives, aim to ensure that all important R&D is adequately covered, encourage groups to avoid unnecessary duplication, alert RDB and GDE to major technical and funding problems … Through participation in national reviews (so far in USA, UK, Japan) they have some influence over funding, but don’t have direct control. Their role will be strengthened by MoUs in the ED phase If the TCG is formed, I would suggest that they consider talking to any or all of the above, as well as reading the recent slides for the MAC review of R&D. We can learn some things from our accelerator colleagues Accelerator TF responsibilities

3 rd June 2007Report on Beijing Tracking Review Chris Damerell 14 S0/S1: Gradient Task Force Charge The RDB is asked to set up a Task Force to carry out a closely coordinated global execution of the work leading to the achievement of the accelerating gradient specified in the ILC Baseline. A definition of the goals for the cavity performance in terms of gradient and yield and a plan for achieving them should be proposed by this group, which should take account of the global resources available and how they may be used most rapidly and efficiently. The accelerating gradient performance and yield should be specified both for an individual 9-cell cavity and for an individual cryomodule, and the plan should cover the demonstration of this performance in both cases. The GDE will facilitate the coordination at the global level to achieve this vital goal as soon as possible.