Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Status of the pilot project: noise reduction.

Slides:



Advertisements
Similar presentations
Transport RAIL Isabelle Vandoorne Brussels, 29 November 2012 TEN-T 2012 calls info day.
Advertisements

Corridors Herald Ruijters, Head of Unit for Trans European Network, DG Mobility and Transport Brussels, 29 November 2012.
European Commission - DG Environment Clean Air for Europe Jacques Delsalle European Commission European Commission DG Environment, Unit C1 Update on TREMOVE.
Developments in the Netherlands The Dutch Whispering Train programme
1 Noise differentiated track access charging Joint position of railway representative bodies Workshop on Noise differentiated track access charges And.
Shaping the railway of the 21st century Implementation of Retrofitting freight fleet Analysis of the EU funding possibilities Rail Freight Noise Abatement.
UIC/CER - MB/RT - 11/2002 ___________________________ Noise Policy - European perspective Mads Bergendorff Environmental advisor UIC ___________________________.
European Rail Agency Workshop 29 th September 2011 (Lille) Dr Björn Paulsson (UIC) Dr Stephen Ingleton (Newcastle University) REDUCING THE OCCURRENCES.
Shaping the railway of the 21st century 25 October 2005, Paris Rail Freight Noise Abatement in Europe UIC/UIP/CER Action Programme Noise Reduction.
SILENT RAIL FREIGHT IN THE NETHERLANDS Pieter Dronkert Dep of Transport, Rail Freight Divison 25 okt 2005.
YEKATERINBURG, 4 SEPTEMBER STATUS QUO - COOPERATION BETWEEN CCTT AND MÁV Ilona Dávid President – Director General MÁV, Hungarian State Railways.
Nedim Begovic, Regional Railway Expert Railway Infrastructure th April 2015, Belgrade SEETO Comprehensive Network Development Plan 2015.
Specialists I projects I management © Brunel Railmotive, 2005, EURNEX Pole 4 Meeting, Prague, specialists I projects I management Brunel GmbH.
Shaping the railway of the 21st century Rail Freight Noise Abatement in Europe J. Gräber, DB AG, 25 October 2005, Paris UIC/UIP/CER Action Programme Noise.
Republic of Serbia Road Traffic Safety Agency RTSA – Belgrade.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
EP Transport Committee Fourth Railway Package - public hearing Brussels, 7 May 2013 Better governance of the railways – a freight perspective Tony Berkeley.
Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders Conclusions and next steps Luc Aliadière, UIC UIC, Paris.
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
1 Silencing freight trains A small country’s perspective Martine Serbruyns BeWag 27 april Brussels.
| 1 Guido de Wilt DG TREN D4 EUROPEAN POLICY REGARDING MICRO-CHP EUROPEAN COMMISSION.
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
1 Noise and rail What about Belgium ? Martine Serbruyns Federal Public Service Mobility and Transport Brussels - 28 april 2014.
11 Satellite-based solutions for Train Control Systems European Parliament, Brussels Tuesday, 11 February 2014 Francesco Rispoli, Manager Satellite Technology.
The INTENSE project: Improving Energy Efficiency in the Building Sector Workshop: Sustainable Energy Action Plans in Latvia: Regional Cooperation,
(Dr. Peter Heil, ALTUS – Hungary)
András Siegler - ERTRAC National Platforms Workshop, Budapest, 5/9/2008 The role of Technology Platforms in European Research ERTRAC National Platforms.
Rahandusministeerium Project Preparation Fund for Structural Funds Peter Gornischeff Ministry of Finance of Estonia.
EUROPEAN REGIONAL DEVELOPMENT FUND RECOMMEND Final Event, 11 September 2014, Varna EU Interregional Cooperation State of play and perspectives Jason Martinez.
Improving Aid Coordination in Tajikistan Aid Coordination in Tajikistan Improving and Challenges Aid Coordination in Tajikistan Improving and Challenges.
HEMISPHERIC PROJECT “MANAGEMENT AND EDUCATIVE CERTIFICATION FOR TRAINING AND ACREDITATION OF LABOR AND KEY COMPETENCIES IN SECONDARY EDUCATION” Brazil.
1 Workshop of the Ministry of Finance of the Czech Republic How to use European funds within a PPP project? Jana Maláčová Ministry for Regional Development/
1 Cohesion Policy Brussels, 9 June 2009 “ Cohesion policy: response to the economic crisis” European Commission seminar for managing and certifying.
PHARE TWINNING CONTRACT BG/2004/IB/TR/02/UE Strengthening the capacity of the Ministry of Transport to manage the Sectoral Operational Programme on Transport.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
Rail Baltica Growth Corridor – First Transnational Roundtable Vilnius, Lithuania 24 November crucial year for Rail Baltica -2? Dr.Roberts Zile.
Transport ERTMS on the EU core network by 2015, 2020, 2030 strategic (pragmatic) approach UIC conference 2014 I. Vandoorne.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
“South East Europe Alliance for Railway Innovation” (SEESARI)
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia Review and Future Plan of.
Hearing in the European Parliament,
JASPERS for CEF Stéphane OUAKI Head Of Unit
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
Platform for the implementation of NAIADES State of Play of RIS in Europe RIS Workshop of the Danube Commission Budapest, 11th of April 2011 Andreas Bäck.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
EUROPEAN REGIONAL DEVELOPMENT FUND Stakeholder Workshop Brussels – 5 February 2014 INTERREG EUROPE Nicolas Singer | Senior Project Officer INTERREG IVC.
Seite 1 Page GTZ Activities in the field of Resource-efficient and Low Carbon Cities in Asia 10 August 2010 Bangkok Torsten Fritsche.
Summary of the State of the Art of Programme Implementation CENTRAL EUROPE PROGRAMME Project development seminar Prague, 1-2 February 2010 Monika.
First call – May-September 2013 Technical Assistance Facility for Danube Region Projects.
BEWAG General Assembly 10 May, 2015 Brussels UIP News Maria Price, DPhil. Manager, European Affairs.
Abfallbewertung Bundesabfallwirtschaftsplan Andreas Moser t Tel: Establishment of inspection plans: The role of.
Norwegian Cooperation Programme – Roles, responsibilities and procedures 15 November 2007, Radisson SAS Grand Hotel Sofia, Bulgaria Anne Lise Rognlidalen,
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy Regional Workshop.
09/02/2018 6th ERA TAF TSI Regional Workshop (EE, LT, LV, PL) The Content of TAF TSI   ERA Telematics Team Warsaw September 2017.
A Single European Railway Area :
PRESENTATION OF MONTENEGRO
Promoting Motorways of the Sea
Workshop on freight train derailments - Introduction -
Europe’s railways – where are you?
THE EIB’s ACTIVITIES IN POLAND
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
Meeting of the WG on Rail Transport Statistics 2-3 April 2009
ERTMS: specifications, deployment, financing
Temporary Capacity Restrictions: TCR WG & TCR tool
Bernhard Berger, Marco Paviotti DG Environment, European Commission
State aid and EU funding - Are they compatible
Redesign of the International Timetabling Process (TTR)
EVALUATION ARRANGEMENTS FOR
EC-­activities and strategy to reduce rail freight noise
Noise – an operational and economical challenge for wagon keepers BeWag & UIP Workshop, April 28, 2014, Brussels Markus Vaerst Chairman UIP Topical.
Presentation transcript:

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Status of the pilot project: noise reduction by retrofitting freight traffic Dipl.-Ing. Thomas Quernheim Die Ingenieurwerkstatt GmbH Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine"1

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Noise map LNIGHT – Rhine valley at Boppard data origin: © Eisenbahn-Bundesamt Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 2

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Rhine corridor Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 3

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) !Retrofitting of up to freight wagons with K- and LL-blocks !Definition of practical approach for application of LL-blocks !Definition and pre-evaluation of NDTAC models with focus on financing and cost Main project modules Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 4

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Organization Interministerial working group BMVBS, BMU, BMWI, BMF, UBA, EBA Project Manager Working Group 2 Engineering / Homologation / Improvement K- & LL-blocks Working Group 3 noise differentiated track access charges / wagon identification Working Group 1 Terms of subsidies / EU-notification / Retrofitting priorities Industry, RU, IM, Wagon owner, Organizations (VDV, VPI, UIP, UIC) Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 5

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Retrofitting of up to freight wagons !Request for notification of directive for subsidies submitted to Brussels in May 2009 !Approval of notification received in November 2009 !Evaluation of technical options for vehicle detection and verification in the pilot project is completed:  RFID system  Operational data Project status (1) Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 6

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Homologation of composite brake blocks !Intensive coordination with EBA concerning approval of retrofitted wagons and with UIC-experts concerning restrictions in application guideline V-BKS (LL) "Limit value for equivalent conicity "Inspection intervals therefore "Measurement procedure therefore Project status (2) Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 7

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Project status (3) Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 8 Status with reference to NDTAC

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Status with reference to NDTAC (2) !Subjects to be analysed in NDTAC study "Cost for public authority "Cost for private sector "Efficiency "Effectivity "Inter modal effects "Compatibility to Europe "Time line for implementation Project status (4) Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 9

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Status with reference to NDTAC (3) !Study to verify cost for setting-up and maintaining NDTAC system in Germany will start soon !Results of study within 4 month until August / September !Preparation of governmental decision based on study and findings of the project !Possible implementation of NDTAC system until December 2012 Project status (5) Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 10

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Preconditions for this time-line are !Cooperation of stakeholders !Financial feasibility (public & private sector) !Legal permissibility (state aid issues) !Practicability !Compatibility with European approach Summary Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 11

Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Thank you for your attention! Die Ingenieurwerkstatt Gesellschaft für Lifecycle-Engineering mbH Biebricher Allee 23 D Wiesbaden Dipl.-Ing. Thomas Quernheim Tel.:+49 (611) – 12 Fax:+49 (611) – 10 Internet: Workshop NDTAC – – Pilot project and innovation programme “Silent Rhine" 12