Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.

Slides:



Advertisements
Similar presentations
Supplementary Training modules on Good Manufacturing Practices
Advertisements

World Health Organization
World Health Organization
Radiopharmaceutical Production
EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Scope  Service Department offers after sales service for products sold by EG Medical.
World Health Organization
EQUIPMENT VALIDATION.
Overview of Validation Requirements Pharmaceutical Industry
Good Manufacturing Practices Guilin, PRC Dr AJ van Zyl for Quality Assurance and Safety: Medicines Medicines Policy and Standards Health Technology and.
World Health Organization
World Health Organization
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY ASSURANCE PROCEDURES & ACCREDITATION An Overview OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY.
Supplementary Training Modules on Good Manufacturing Practice
Quality Assurance/Quality Control Policy
A seminar On Validation Of Ampoule Filling & Sealing Machine
ISO 9000 Certification ISO 9001 and ISO
Quality Control Rutendo Kuwana Technical Officer, WHO, Geneva Training workshop: Training workshop on regulatory requirements for registration of Artemisinin.
QC/QA Mary Malarkey Director, Division of Case Management Office of Compliance and Biologics Quality Center for Biologics Evaluation and Research March.
EQUIPMENT/INSTRUMENT CALIBRATION
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
World Health Organization
Module 10 | Slide 1 of 26 January 2006 Basic Principles of GMP Equipment 13.
WHO Supplementary Training Modules GMP
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Qualification of HVAC systems
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
Qualification and Validation
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
Radiopharmaceutical Production
EQUIPMENT QUALIFICATION/VALIDATION
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
World Health Organization
Module 4 | Slide 1 of 28 January 2006 Qualification and Validation Basic Principles of GMP Section 4.
World Health Organization
World Health Organization
Basic Principles of GMP
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
VALIDATION METHODOLOGY
1 Importance of Instrument Validation for Accredited Food Export Testing Labs.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
Equipment Management Audience – Local lab responsibilities.
World Health Organization
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Module 1,, Part 5: Review and summary Slide 1 of 13 © WHO – EDM Validation Part 5: Review and summary Supplementary Training Modules on Good Manufacturing.
VALIDATIONS: TOWARDS RELAIBLE QUALITY OUTCOMES DR. SHIVPRAKASH MANAGING DIRECTOR SYNCHRON RESEARCH SERVICES PVT. LTD., INDIA.
MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455)
Module 4Slide 1 of 23 WHO - EDM Validation Basic Principles of GMP.
The world leader in serving science Validation and Qualification Overview Mike Garry Software Product Manager Spectroscopy Software Platform Team.
Pharmaceutical Quality Control & current Good Manufacturing Practice
ERT 421 Good Manufacturing Practice for Bioprocess Engineering Test 1: answer scheme.
1. Our Presentation Topic: Importance Of Validation & Qualification In Pharmaceutical Industries Presented By: Md. Tanjir Islam (Group C) 2.
World Health Organization
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
World Health Organization
World Health Organization
Pharmaceutical Quality Control & current Good Manufacturing Practice
World Health Organization
Author: Nurul Azyyati Sabri
Water for Pharmaceutical Use
Computer System Validation
World Health Organization
World Health Organization
Computer System Validation
Radiopharmaceutical Production
Aerodrome Certification Workshop
Pharmaceutical Quality System in regard to Good Engineering Practice
Presentation transcript:

Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, Annex 4.

Validation | Slide 2 of 27 August 2006 Validation Part 1. General overview on qualification and validation Part 2. Qualification of HVAC and water systems Part 3. Cleaning validation Part 4. Analytical method validation Part 5. Computerized system validation Part 6. Qualification of systems and equipment Part 7. Non sterile product process validation

Validation | Slide 3 of 27 August 2006 Qualification of systems and equipment Part 6 Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, Annex 4. Appendix 6.

Validation | Slide 4 of 27 August 2006 Validation Objectives To discuss the principles of qualification of systems and equipment, with specific focus on: The different stages of qualification Requalification and Qualification of “in use” systems and equipment

Validation | Slide 5 of 27 August 2006 Validation Principle Systems and equipment: Appropriately designed, located, installed, operated and maintained Critical systems and equipment – should be qualified May include, where appropriate: –Water purification systems, air-handling systems, autoclaves, coating machines Continued suitable performance needed –Why? To ensure batch-to-batch consistency 1.1 – 1.3

Validation | Slide 6 of 27 August 2006 Validation Scope Guidelines describe the general aspects of qualification for systems and equipment Normally qualification would be applicable to critical systems and equipment whose performance may have an impact on the quality of the product 2.1 – 2.2

Validation | Slide 7 of 27 August 2006 Validation General Qualification policy for systems and equipment To include instruments used in production and quality control New systems and equipment: All stages of qualification applicable (DQ, IQ, OQ and PQ) In some cases: Not all stages of qualification may be required –e.g. electrical supply systems 3.1 – 3.4

Validation | Slide 8 of 27 August 2006 Validation General (continued) lSystems: Qualified before equipment Equipment: Qualified before routine use Systems and equipment: Periodic requalification, as well as requalification after change Certain stages done by the supplier or a third party Maintain the relevant documentation, e.g. –standard operating procedures (SOPs), specifications and acceptance criteria, certificates and manuals 3.5 – 3.9

Validation | Slide 9 of 27 August 2006 Validation General (continued) Qualification should be done in accordance with predetermined and approved qualification protocols The results of the qualification should be recorded and reflected in qualification reports The extent of the qualification should be based on the criticality of a system or equipment, e.g. –Blenders, autoclaves or computerized systems 3.10 – 3.11

Validation | Slide 10 of 27 August 2006 Validation Blender Discuss the approach of qualification of a newly installed blender

Validation | Slide 11 of 27 August 2006 Validation Stages of qualification 3.11 Design qualification Installation qualification Operational qualification Performance qualification

Validation | Slide 12 of 27 August 2006 Validation Stages of qualification Design qualification Installation qualification Operational qualification Performance qualification Change control

Validation | Slide 13 of 27 August 2006 Validation Design qualification User requirements should be considered when deciding on the specific design of a system or equipment A suitable supplier should be selected for the appropriate system or equipment (approved vendor) 4.1 – 4.2

Validation | Slide 14 of 27 August 2006 Validation Installation qualification Correct installation as per plan and protocol Normally advised to prepare requirements for calibration, maintenance and cleaning at this stage Identification and verification of all system elements, parts, services, controls, gauges and other components Calibrate the measuring, control and indicating devices –against appropriate, traceable national or international standards 5.1 – 5.4

Validation | Slide 15 of 27 August 2006 Validation Installation qualification (2) Documented records for the installation –installation qualification report Indicate satisfactory installation Include details, e.g. –The supplier and manufacturer –System or equipment name, model and serial number –Date of installation –Spare parts, relevant procedures and certificates 5.5

Validation | Slide 16 of 27 August 2006 Validation The handout shows a typical format for "An installation qualification protocol / report" It reflects the minimum information that should be included This is an example – and should be used as such Specific formats need to be designed for a specific system or piece of equipment 5.5

Validation | Slide 17 of 27 August 2006 Validation Operational qualification Systems and equipment should operate correctly – operation verified as in the qualification protocol Studies on critical variable to include conditions encompassing upper and lower operating limits and circumstances (i.e. “worst case conditions”) To include verification of operation of all system elements, parts, services, controls, gauges and other components 6.1 – 6.3

Validation | Slide 18 of 27 August 2006 Validation Operational qualification (2) Documented records (Operational qualification report) Finalize and approve SOP (operation) Training of operators provided – training records Systems and equipment released for routine use after completion of operational qualification, provided that: –All calibration, cleaning, maintenance, training and related tests and results were found to be acceptable 6.4 – 6.7

Validation | Slide 19 of 27 August 2006 Validation The handout shows a typical format for: "An operational qualification protocol / report" It reflects the minimum information that should be included This is an example – and should be used as such Specific formats need to be designed for a specific system or piece of equipment 6.7

Validation | Slide 20 of 27 August 2006 Validation Performance qualification Systems and equipment should consistently perform in accordance with design specifications – verified in accordance with a performance qualification protocol Documented records – performance qualification report Show satisfactory performance over a period of time Manufacturers to justify the selected period 7.1 – 7.2

Validation | Slide 21 of 27 August 2006 Validation The handout shows a typical format for: "A performance qualification protocol / report" It reflects the minimum information that should be included This is an example – and should be used as such Specific formats need to be designed for a specific system or piece of equipment 7.2

Validation | Slide 22 of 27 August 2006 Validation 8.1 – 8.3 Requalification Defined schedule Periodic After change

Validation | Slide 23 of 27 August 2006 Validation Requalification Defined schedule Frequency based on Factors Results of calibration maintenance, verification Periodic After change Part of Change control procedure Extent based on Risk assessment 8.1 – 8.3

Validation | Slide 24 of 27 August 2006 Validation What about "old manufacturers" who have not performed DQ, or IQ for existing, in-use systems and/or equipment?

Validation | Slide 25 of 27 August 2006 Validation Qualification of “in-use” systems and equipment Data to support and verify the suitable operation and performance of systems and equipment Should include operating parameters and limits for critical variables, calibration, maintenance and preventive maintenance, standard operating procedures (SOPs) and records 9.1 – 9.2

Validation | Slide 26 of 27 August 2006 Validation

Validation | Slide 27 of 27 August 2006 Validation Group session