ATC / ABOC Days 23 Jan. 2008 LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
MTTR, spare parts and stand- by policy for ATB equipments R. Losito AB/ATB 23th Jan ATC/ABOC Days 1.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Vacuum System of the LHC Injectors and Beam Transfer Lines by J.M. Jimenez Accelerator Technical & Operation Review (ATC/ABOC Days) - Session 4 22 January.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp.
MTTR and spare parts policy for BT equipment 23/1/2008 ATC/ABOC days MTTR and spare parts policy for BT equipment BT equipment with long MTTR PSB ISOLDE.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
FFAG-Workshop Dec Kumatori Japan Diagnostics for FFAG- accelerator Takahisa ITAHASHI Department of Physics, Osaka Univ. Toyonaka, Osaka, ,Japan.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Next Steps, Priorities, Strategy for Spares Ray Veness.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
October, 2009 Internal Review Beam Instrumentation David Gassner.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Controls Issues Through the Backbone R. Steerenberg with help of many colleagues ATC – ABOC Days 23 January 2007 ATC – ABOC Days 23 January 2007.
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
28/01/2013 Gerrit Jan Focker, BE/BI/PM 1 Isolde SGIU Beam Instrumentation Remarks on status and possible development.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Summary of Session 6 ATC/ABOC days
ELENA installation and commissioning status
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Installations up to Start of Commissioning
AD consolidation activities in LS2
The LHC - Status Is COLD Is almost fully commissioned
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Instrumentation for SPS 2006 restart
BE-BI Software for LINAC4
Status of the BI Work Package in the LIU-PSB frame
Renovation of the 45-year old PS magnets
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Alexander Herlert, CERN (PH-SME-IS)
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Interlocking of CNGS (and other high intensity beams) at the SPS
Proton Beam Diagnostics
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI Group

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Outline LHC injector Chain LHC injector Chain –Critical Elements : beam stop risk –Unavailability of Measurements Facilities & Experimental Areas Facilities & Experimental Areas Standby Policy Standby Policy Conclusions Conclusions

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Critical Elements : BCT (1) Transformer types Transformer types –Fast : Transfer Lines, 13 units –Slow : Linacs, LEIR, PSB injection, 31 units –DCCT : PSB, PS, LEIR, SPS : 9 units –Specials : PS 6-turn transformer, LEIR injection... Linac2 transformer

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Critical Elements : BCT (2) Ceramics beam pipe BCTs Ceramics beam pipe BCTs –Problem : Vacuum leaks –Beam stop risk : YES –MTTR : 1-2 days if ceramics is available –Risk in the past : ONLY During handling/installation Cables and connectors Cables and connectors –Problem : Radiation damage  Linac 2 watchdog –Beam stop risk : YES Ceramics : Few spare parts. Ceramics : Few spare parts. Electronics : Electronics : –Problem : Machine protection / Watchdog –Beam stop risk : YES –Linacs + Rings OK, –Transfer lines about to be consolidated towards LHC standards Special transformer have no spare parts : no toroids, no ceramics Special transformer have no spare parts : no toroids, no ceramics LEIR DDCT (internal)

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Critical Elements : BLMs Problem : Machine Protection Problem : Machine Protection Beam stop risk : YES Beam stop risk : YES 200 ionisation chambers for SPS 200 ionisation chambers for SPS 200 photo-multipliers (ACEM) for CPS 200 photo-multipliers (ACEM) for CPS MTTR : 2h MTTR : 2h Electronics : 2h Electronics : 2h Cables : Shutdown Cables : Shutdown 5 to 10% in storage for SPS 5 to 10% in storage for SPS 5 to 10% in storage of ACEMs for CPS (electronics needs repair, consolidation program is waiting for approval) 5 to 10% in storage of ACEMs for CPS (electronics needs repair, consolidation program is waiting for approval)

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Critical Elements : Phase PUs Problem : No acceleration Problem : No acceleration Beam stop risk : YES Beam stop risk : YES PSB : all under AB/RF responsibility PSB : all under AB/RF responsibility –5 PUs per ring (dated 80’s) PS protons : PS protons : –1 WCM in section 95, good shape, no spare –Electronics and spares boards OK PS ions : PS ions : –2 units, section 83 and 93 –Low failure risk –Electronics : tubes amplifiers, spares OK PS WCM section 95

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Critical Elements : Intercepting Devices Problem : vacuum leaks (bellows) + Mechanical in/out problems Problem : vacuum leaks (bellows) + Mechanical in/out problems Beam stop risk : YES Beam stop risk : YES TV screens : 100 units, electronics & spare parts OK TV screens : 100 units, electronics & spare parts OK FWS : 24 units FWS : 24 units –Broken wire : 1 day –Cables : shutdown –Electronics, MTTR : 2 h –Consolidation on the way : mechanics + electronics –Some parts in storage SEM Grids : 241 units SEM Grids : 241 units –Broken wire : 1 week –Cables : shutdown –Electronics : OK, MTTR : 2 h

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Critical Elements : LEIR e-cooler Problem : No phase space cooling Problem : No phase space cooling Ion beam stop risk : YES Ion beam stop risk : YES Gun, cathode and collector : 1 spare of each Gun, cathode and collector : 1 spare of each –Intervention duration on each element : up to 2 weeks down-time Four Magnetic elements : 1 spare of each Four Magnetic elements : 1 spare of each –Intervention duration on each element : up to 2 months down-time

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Unavailability of Measurements for LHC injector Chain Orbit / Trajectory Systems Orbit / Trajectory Systems Ionisation Profile Monitors Ionisation Profile Monitors Tune Monitors Tune Monitors Wall Current Monitors Wall Current Monitors

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Orbit / Trajectory (1) Types of Beam Position Monitors : Types of Beam Position Monitors : –Magnetic : 20, with ceramics insertion, 1 spare –PSB : electrostatics 16x4, 1 stack spare –Transfer lines : 18 electrostatics, 3 spare ceramics –PS : 40 electrostatics, 2 spares –LEIR : electrostatics 8 circular, 1 spare, MTTR : 1 day + baking 8 circular, 1 spare, MTTR : 1 day + baking 8 rectangular in bendings, No spare 8 rectangular in bendings, No spare –LEIR to PS : 14 electrostatics, 3 diameters, 1 spare of each –TT2/TT10 : 20 stripline couplers –SPS : 240 (216 single plane shoebox BPMs + a few others - striplines & large aperture BPMs) PSB : BPM stack

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Orbit / Trajectory (2) No failure of sensor No failure of sensor CPS electronics : spares OK, MTTR : 1h CPS electronics : spares OK, MTTR : 1h TT2 / TT10 TT2 / TT10 –prototype system for CNGS plagued by many known bugs : –no auto-trigger, acq. not optimal for single pass, complicated software –Consolidation request approved : awaiting final go-ahead SPS SPS –Problem : interlock linked to orbit extraction bump –Beam stop risk : YES –Most components date from the early 1980’s (amplifiers, RF comp., DAC systems) –Ageing system requires a lot of intervention (shutdown) –MTTR still low : spare parts available but obsolete components hard to find –Consolidation will be requested for MOPOS electronics in medium term future. PS Pick-up

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Other Diagnostics Tools Ionisation Profile Monitors Ionisation Profile Monitors –SPS : 2 units If failure, then replacement during shutdown If failure, then replacement during shutdown Cables : shutdown work Cables : shutdown work Electronics : MTTR 2h Electronics : MTTR 2h –LEIR : 2 new units : spare chambers OK, MTTR : one week due to baking Tune Tune –BBQ based system + FESA server : 2007 : standard system for PSB, PS SPS, LEIR 2007 : standard system for PSB, PS SPS, LEIR 2008 : all BBQ systems will be operational for machine start-up : all BBQ systems will be operational for machine start-up. PS : Some remaining issues, BBQ will run in // with the old system PS : Some remaining issues, BBQ will run in // with the old system MTTR very short due to standardisation : spare parts are readily available MTTR very short due to standardisation : spare parts are readily available –Schottky : LEIR 4 sensors, no spares, electronics OK, MTTR 1h Wall Current Monitor Wall Current Monitor –PSB : 4 sensors, 1 spare vac tank, no ceramic spare –PS : 1 sensor in section3 Radiation damages : oxydised surface, and cable Radiation damages : oxydised surface, and cable Consolidation : study foreseen for 2008 Consolidation : study foreseen for 2008

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Facilities & Experimental Areas ISOLDE ISOLDE AD AD East Hall / SPS North East Hall / SPS North CTF3 / CNGS CTF3 / CNGS

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan ISOLDE (1) Half a day for radiation cool down must be added to MTTRs quoted below Half a day for radiation cool down must be added to MTTRs quoted below TV screens TV screens –standardisation of boards and cameras. MTTR = 2h Scanners Scanners –MTTR = Half a day –Few spare parts SEM Grids SEM Grids –6 units, no spare for mechanics –Electronics OK, MTTR = Half a day Faraday Cup Faraday Cup –Spares OK, MTTR = One day

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan ISOLDE (2) Half a day for radiation cool down must be added to MTTRs quoted below Half a day for radiation cool down must be added to MTTRs quoted below Fixed Needle Beam Scanner Fixed Needle Beam Scanner –Unique monitor used by an expert. No spare. MTTR = UNKNOWN Tape station Tape station –Few mechanical parts. MTTR = one day –Electronics : dated 1974 !! REX intrumentation REX intrumentation –Few spare parts. MTTR = Two days –Electronics : bad shape. Regular technical hitches expected –Consolitation scheduled for 2009

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan AD (1) Deceleration Deceleration –Longitudinal Schottky monitors : 1 low freq unit + 1 high freq unit, no spares if sensor USY4105 is damaged, AD STOPS for one week if sensor USY4105 is damaged, AD STOPS for one week –Electronics : Head amplifier : spare OK, MTTR = 8h Electron cooling Electron cooling –gun, collector and cathode : one spare of each, AD STOPS for 2 weeks –magnetic elements : unique spare for the drift solenoid. –other magnetic elements : no spare. if damage = AD STOPS UNTIL REPAIR Intensity measurements Intensity measurements –Longitudinal Schottky monitors : TFA7049, no spare –Electronics : Head amplifier : spare OK, MTTR = 8h Tune measurements Tune measurements –BTF with Transverse Schottky monitors : no spare –Electronics : Head amplifier : no spare –Orphan system

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan AD (2) Orbit Orbit –59 sensors +2 in e-cooler, ceramics + vac tank, –Electronics spares OK, MTTR 1 h Profile measurements Profile measurements –TV screens : standardisation of boards and cameras. MTTR = 2h –SEM Grids : 2 unit, few parts, Electronics OK, MTTR = 2h –Scrapers + Scintillators : spare tubes OK. –Multi-Wires Prop. Chambers : 16 MWPC + 1 Gas Electron Multiplier Problem : not possible to setup the extraction Problem : not possible to setup the extraction Spare : Dectectors OK Spare : Dectectors OK Electronics : few boards, obsolete and orphan. MTTR ?? Electronics : few boards, obsolete and orphan. MTTR ?? Consolidation : possible for startup 2010 Consolidation : possible for startup 2010 (profit from new North Area standard) (profit from new North Area standard)

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Experimental Areas (1) Detectors for instrumentation: Detectors for instrumentation: –Consolidation of SPS North Area achieved (CAMAC -> VME) –Sufficient redundant instrumentation –Spectrometres and CEDAR : crucial for COMPASS and NA61 –MTTR for CEDAR : 1 day + 2 days commissioning –East Hall should profit from the newly renovation of the North Areas (Scintillators and Delay Wire Chambers identical)

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Experimental Areas (2) Motorization of collimators, dumps, target absorbers... Motorization of collimators, dumps, target absorbers... –Problem : faulty motorized equipment –Beam stop risk : YES –MTTR : Might be long depending on location and radiation issues –Mechanics is under ATB’s responsibility –Software & hardware controls : obsolete (80’s), no specialists –Renovation initiated 5 years ago –ATB has proposed a standardized controls system (1.5 MCHF !) –BI will transfer responsibility of these "none detectors" to ATB ( 2009 ?) Two-Block Collimator

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan CTF3 and CNGS CTF3 : CTF3 : –108 BPMs (3 types : ceramics, button, magnetic), No spare –Electronics : OK, MTTR 1h –5 Wall current monitors, 1 spare, MTTR : 1 day –electronics OK, MTTR 1h –TV screens renovation in 2007 of all controls boards and cameras –MTTR is short due to standardisation CNGS : CNGS : –Beam stop risk : YES –Problem : target BPM watchdog on proton beam position on target. Beam stopped if this BPM does not work. –5 striplines and 18 buttons PUs –Electronics : Autotriggered Log Amp electronics. New system with enough spares New system with enough spares MTTR : a few hours MTTR : a few hours CTF3 Delay loop: BPI

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Standby Policy BI group provides CCC a complete list of specialists on call for each equipment BI group provides CCC a complete list of specialists on call for each equipment Until 2005, BI-EA had a Piquet Service for the SPS Experimental Area. After the renovation program this service is no longer needed Until 2005, BI-EA had a Piquet Service for the SPS Experimental Area. After the renovation program this service is no longer needed

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Conclusions Low probability of sensor failure Low probability of sensor failure Sensors fail less than electronics Sensors fail less than electronics Real concerns about the lack of spare ceramic chambers for BCTs Real concerns about the lack of spare ceramic chambers for BCTs Strong consolidation effort still needed Strong consolidation effort still needed BI group provides CCC a list of specialists on call. BI group provides CCC a list of specialists on call.

Jocelyn TAN AB/BI ATC / ABOC Days23 Jan Acknowledgements My warmest gratitude to all my BI- colleagues for their active help and colleagues for their active help and support in the preparation of this talk