Consultant: CMDC Joint Venture Public Participation.

Slides:



Advertisements
Similar presentations
European Environmental Bureau Bureau Européen de lEnvironnement EU Presidencies Currently: Spain until end June 2010 July-December : Belgium 2011: January.
Advertisements

Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
The Industrial Emissions Directive (IED) 2010/75/EU
First Nation Student Success Program (FNSSP) Update.
Scoping in the EIA process Proposal Identification Screening
HEADQUARTERS Strategic Environmental Assessment ”SEA is a systematic process for evaluating the environmental consequences of proposed policy, plan or.
Review of EIA Quality A formal step in the EIA process Purpose is to establish if the information in the EIA report is sufficient for decision –making.
Public consultation in EIA procedures Geert P.J. Draaijers Netherlands Commission for Environmental Impact Assessment (
ENVIRONMENTAL MANAGEMENT PLAN
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Consultant: CMDC Joint Venture How to take into account economy and local conditions in implementation of BAT?
USE OF NEW PUBLIC PARTICIPATION MECHANISM ESTABLISHED BY THE PARLIAMENT OF MOLDOVA AS A TOOL FOR PPSD Ilya TROMBITSKY & Tatiana SINIAEVA, ‘Eco-TIRAS’ NGO,
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
The SEA Directive – Implications, Obligations, Strengths and Weaknesses Workshop SEA in Practice Malta, 11 November 2011 Louis Meuleman Unit Cohesion Policy.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
1 Public Outreach October 2008 By Adelina Murtezaj – Public Relation Officer For Inaugural Partnership Activity between ICC and ERO.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Implementing the Second Pillar of the Aarhus Convention: Problems Identified in the National Implementation Reports Magda Tóth Nagy, Senior Expert Geneva,
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
NIST Special Publication Revision 1
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
ETCF-II is co-funded by the European Union and Turkey TOBB CENTRAL FINANCE AND CONTRACTS UNIT Civil Society Dialogue - EU-Turkish Chambers Forum-II: EU-TURKEY.
Session 13 CPIP Formulation Process Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC 2)
Consultant: CMDC Joint Venture Key principles and effectiveness of EIA.
What is Necessary to Ensure Natural Justice in EIA Decision-making? Angus Morrison-Saunders Senior Lecturer in Environmental Assessment School of Environmental.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
The Ohio Local Government Leadership Academy Prepared by: Joe Lucente OSU Extension- Community Development/ Ohio Sea Grant College Program.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Consultant: CMDC Joint Venture Reflections on draft Recommendations for Revision to Administrative Regulations: By Norman Sheridan, Legal & Institutional.
UNEP Training Resource Manual Topic 10 Slide 1. UNEP Training Resource Manual Topic 10 Slide 2 EIA is a process to: F gather information necessary for.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Gf A few points of the Hungarian Dissemination Strategy A few points of the Hungarian Dissemination Strategy Erzsébet Schmuck Hungary, Country Manager.
Consumer Education and Information (Session Ib: Tools to empower consumers) Edin Zametica Advisor to SERC, Bosnia and Herzegovina Chair of the ECRB Customers.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
1 Public Involvement, Access, and Petitions DJ Law EPA Region 8.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Consultant: CMDC Joint Venture EIA, IPPC and SEVESO Links.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Tier 1 Module 4 CERCLA 128(a) Tribal Response Program Element 3: Public Participation.
Anglophone West School District Education Council Sustainability Study – Bath Elementary and Middle Schools Executive Summary April 23, 2015.
FEAD ANNUAL CONFERENCE 2008 Future Challenges for the Waste Management Industry Paris, 19 September 2008.
POLICY MAKING IN SWEDEN. A brief overview Policy making in Sweden Political policies are developed in different ways; By the Government By the Opposition.
SEA in the Czech Republic Prague, 24 September 2008.
Public Participation and Consultation: The Experiences of Europe Ralf Aschemann Austrian Institute for the Development of Environmental Assessment (An.
Delivering the Message Public Notification vs. Public Involvement Strategic Communication Public Involvement Training Class – Presented by the Office of.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
Group EIA 1: Screening for Annex 2 Both:- case-by-case - thresholds < 10% goes to EIA All Countries have problems with “Salami Slicing” Little Information.
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
The current legal situation
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Standards Certification Education & Training Publishing Conferences & Exhibits ISA Standards for Automation An Overview.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
UNEP Training Resource ManualTopic 9 Slide 1 No EIA EIA Required *Public involvement Scoping Mitigation and impact management EIA Report Proposal Identification.
Introduction to the philosophy
EIA approval process, Management plan and Monitoring
Conducting Council Elections
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
Marine Strategy Framework Directive (MSFD)
REPUBLIC OF CROATIA MINISTRY OF ENVIRONMANTAL AND NATURE PROTECTION
Presentation transcript:

Consultant: CMDC Joint Venture Public Participation

Consultant: CMDC Joint Venture Public Participation - benefits Improving decision making by participation Decisions last longer Decision making integrates economic, social and environmental factors Reduces cases of lengthy post-decision arguments (complaints and litigation) Opens peoples eyes to the different compromises that inevitably must be made

Consultant: CMDC Joint Venture Strategies for Public Participation What is the purpose of Public Participation? Who should participate? When should they participate? How do you involve the public? What information is necessary? How long should time should be allocated to participation? What resources are available? How are comments handled? What needs to be done when decision is taken?

Consultant: CMDC Joint Venture Who should participate? local authorities community groups local residents business and industry NGO's

Consultant: CMDC Joint Venture When should the public participate? EIA Public involvement typically at these points

Consultant: CMDC Joint Venture When should the public participate? IPPC Application Permit Monitoring Public participation in all 3 phases

Consultant: CMDC Joint Venture Danish IPPC case Vejle County issues a revised IPPC permit for a scrap-treating enterprise, Uniscrap, ; Uniscrap complaints the conditions (ELV and monitoring of the air emissions) to the Danish EPA claiming, that they imply 5 million DKK in investment and 250,000 DKK in annual costs; The EPA decides to remove conditions to TOC, benzene and dioxin and to suspend conditions to PCB until a new guidance is issued; Vejle County and the ngo NOAH appeal this decision to the Environmental Complaints Commission (ECC); the ECC essentially confirms the permit of

Consultant: CMDC Joint Venture How to involve the public: Levels of participation Informing Consulting Participating Negotiating

Consultant: CMDC Joint Venture How to involve the public: Media printed materials (brochures, displays and exhibits, direct mail); use of the media (newspapers, news conferences, newspapers, radio and TV); public information sessions (open houses, site visits, field offices); use of the Internet (web site).

Consultant: CMDC Joint Venture What information is necessary? Generally EIA is more political Screening: To determine the need for and level of EIA Scoping:To identify key issues and alternatives Impact analysis:To identify significant impacts and mitigating measures Review:Commenting/responding to the EIA report Implementation and monitoring:Checking EIA follow-up

Consultant: CMDC Joint Venture What information is necessary? Generally IPPC is more technical. In most cases the IPPC communication can be one-way communication of The application The decision (permit) Monitoring results However in controversial cases e.g. involving considerable extension of operations in densely populated areas a more involving communication strategy is advisable.

Consultant: CMDC Joint Venture How long time should be allocated? May differ relevant to the nature of project/development; Consider involving the public on a continuous basis; At least: Settle for a minimum time to involve public

Consultant: CMDC Joint Venture Comments/decision Summary of public comments; Be explicit about handling comments ; Announce any delays or other relevant info on the status of the decision making process. Inform the public of the final decision ASAP; Explain how plan/project is implemented; Consider communicating a formal review of implementation.

Consultant: CMDC Joint Venture Example: Danish IPPC case A newly established electroplating enterprise in Farum, DK applies for an IPPC permit; The application is announced in a local advertising newspaper; A neighbouring enterprise asks to see the proposed permit and it is sent to the enterprise; The neighbouring enterprise comments the proposed permit; The permitting authority rejects the comments in a letter to the neighbouring enterprise, but does not communicate the final permit or possibilities of complaint;

Consultant: CMDC Joint Venture Danish IPPC case, continued The permit is issued and the decision is published in a local advertising newspaper. Complaints to be submitted within 4 weeks; the neighbouring enterprise complaints the decision to the Danish EPA; The EPA rejects the complaint because the time limit for complaints is exceeded; This decision is appealed to the Environmental Complaints Commission (ECC); The ECC decides that the EPA must handle the complaint because the permitting authority did not send the promised information

Consultant: CMDC Joint Venture General observations Participation well known Public authorities skilled in managing participation Participation considered a key element in securing an efficient and legitimate decision making procedure Formal appeal system handling complaints institutionalised for many years Courts may review the public authority decision-making Experiences from DK, UK, NL