A serial powering scheme for the ATLAS pixel detector at sLHC L. Gonella, D. Arutinov, A. Eyring, M. Barbero, F. Hügging, M. Karagounis, H. Krüger, N.

Slides:



Advertisements
Similar presentations
Latch-Up and its Prevention Latch is the generation of a low- impedance path in CMOS chips between the power supply and the ground rails due to interaction.
Advertisements

Transistors (MOSFETs)
Physical structure of a n-channel device:
Module #8 Page 1 EELE 414 – Introduction to VLSI Design Module #8 – Miscellaneous & Advanced Topics Agenda 1.Latchup Announcements 1.Read Chapter 13.
Vertex 2002, Kailua-Kona Tobias Stockmanns, Universität Bonn1 Serial Powering of Pixel Modules T. Stockmanns, P. Fischer, O. Runolfsson and N.
11/5/2004EE 42 fall 2004 lecture 281 Lecture #28 PMOS LAST TIME: NMOS Electrical Model – NMOS physical structure: W and L and d ox, TODAY: PMOS –Physical.
1 Module and stave interconnect Rev. sept. 29/08.
Integrated Regulation for Energy- Efficient Digital Circuits Elad Alon 1 and Mark Horowitz 2 1 UC Berkeley 2 Stanford University.
© Digital Integrated Circuits 2nd Devices VLSI Devices  Intuitive understanding of device operation  Fundamental analytic models  Manual Models  Spice.
Chapter 16 CMOS Amplifiers
EKT214 - ANALOG ELECTRONIC CIRCUIT II
Timepix2 power pulsing and future developments X. Llopart 17 th March 2011.
ACES Workshop 3-4 March, 2009 W. Dabrowski Serial power circuitry in the ABC-Next and FE-I4 chips W. Dabrowski Faculty of Physics and Applied Computer.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Characteristics of Op-Amp &
The new E-port interface circuits Filip Tavernier CERN.
LDO characterization Laura Gonella Pjysikalisches Institut Uni Bonn.
1 Fly-back Converter fall Basic Topology of a Fly-back Converter.
Advantages & Disadvantages of DC-DC Conversion Schemes Power Task Force Summary Meeting January 30 th, 2009 Katja Klein 1. Physikalisches Institut B RWTH.
ECE 342 Electronic Circuits 2. MOS Transistors
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Switched capacitor DC-DC converter ASICs for the upgraded LHC trackers M. Bochenek 1,2, W. Dąbrowski 2, F. Faccio 1, S. Michelis 1 1. CERN, Conseil Européen.
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
Laura Gonella ATLAS-CMS Power Working Group, 08/02/2011
1 Module and stave interconnect Rev. sept. 29/08.
Nov. 10, 2005UCSC US ATLAS Upgrade meeting -- Ely, Garcia-Sciveres1 DC to DC Power Converion R. Ely and M. Garcia-Sciveres Atlas Upgrade Workshop Santa.
2. Super KEKB Meeting, DEPFET Electronics DEPFET Readout and Control Electronics Ivan Peric, Peter Fischer, Christian Kreidl Heidelberg University.
Development of DC-DC converter ASICs S.Michelis 1,3, B.Allongue 1, G.Blanchot 1, F.Faccio 1, C.Fuentes 1,2, S.Orlandi 1, S.Saggini 4 1 CERN – PH-ESE 2.
Design studies of a low power serial data link for a possible upgrade of the CMS pixel detector Beat Meier, Paul Scherrer Institut PSI TWEPP 2008.
Power Distribution Peter W Phillips STFC Rutherford Appleton Laboratory ECFA HL-LHC Workshop, Aix-les-Bains, 1-3 October 2013.
Stave Emulator and Regulator Test L. Gonella, D. Arutinov, M. Barbero, A. Eyring, F. Hügging, M. Karagounis, H. Krüger, N. Wermes Physikalisches Institut,
Laura Gonella – University of Bonn – 27/09/20111 The Shunt-LDO regulator for powering the upgraded ATLAS pixel detector Laura Gonella University of Bonn.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
1 Fundamentals of Microelectronics  CH1 Why Microelectronics?  CH2 Basic Physics of Semiconductors  CH3 Diode Circuits  CH4 Physics of Bipolar Transistors.
CLIC and ILC Power Distribution and Power Pulsing Workshop Summary Document 10/5/2011G. Blanchot1.
20 Mar 2007ACES workshop -- Switched Capacitors -- M. Garcia-Sciveres1 Switched Capacitor DC-DC converters Peter Denes, Bob Ely, Maurice Garcia-Sciveres.
1 Vertex-detector power pulsing CLIC Detector and Physics Collaboration Meeting, 02/10/2013 Cristian Alejandro Fuentes Rojas, PH-ESE-FE,
Serial Powering - Protection Purpose Protect the stave Assure supply of power to a serial powered chain of modules when one member of the chain fails Control.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
Serial Powering for the ATLAS Inner Detector for SLHC A. Affolder University of Liverpool On behalf of the ATLAS Upgrade Community SP work and most of.
Serial Powering System Architecture Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of the SP Community Acknowledgement: many figures prepared.
ASIC buck converter prototypes for LHC upgrades
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
Budapest University of Technology and Economics Department of Electron Devices Microelectronics, BSc course MOS inverters
Rutherford Appleton Laboratory Particle Physics Department G. Villani Σ Powering Prague TWEPP TWEPP-07 Topical Workshop on Electronics for Particle.
A complete DC/DC converter ASIC for LHC upgrades S. Michelis, F. Faccio, G. Blanchot, I. Troyano CERN PH-ESE S.Saggini University of Udine, Italy Twepp.
SP & DC-DC Considering the benefits of combining serial powering and DC-DC conversion technologies in powering ATLAS SCT upgrade modules & staves Richard.
Shunt-LDO testing Laura Gonella, M. Barbero, H. Krueger 21/02/2010.
Rutherford Appleton Laboratory Particle Physics Department 1 Serial Powering Scheme Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of RAL.
Rd07 Conference th June 2007 Florence, Italy 1 High frequency stepdown DC-DC converter with switched capacitors This work is part of the INFN DACEL.
M. TWEPP071 MAPS read-out electronics for Vertex Detectors (ILC) A low power and low signal 4 bit 50 MS/s double sampling pipelined ADC M.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
Serial powering for pixels F. Hügging, D. Arutinov, M. Barbero, A. Eyring, L. Gonella, M. Karagounis, H. Krüger, N. Wermes SLHC-PP Annual Meeting, CIEMAT,
Serial Power Distribution for the ATLAS SCT Upgrade John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Richard Holt (RAL),
Stave Emulator for sLHC Prototyping L. Gonella, A. Eyring, F. Hügging, H. Krüger Physikalisches Institut, Uni Bonn.
Integrated Shunt-LDO Regulator for FE-I4
Calorimeter Mu2e Development electronics Front-end Review
Serial powering protection for Inner Detector modules
DC-DC PWM Converters Lecture Note 5.
Novel Powering Schemes
Compilation of Dis-/Advantages of DC-DC Conversion Schemes
Presentation transcript:

A serial powering scheme for the ATLAS pixel detector at sLHC L. Gonella, D. Arutinov, A. Eyring, M. Barbero, F. Hügging, M. Karagounis, H. Krüger, N. Wermes TWEPP 2010, Aachen, 21/09/2010

Outlook  ATLAS pixels powering needs  Serial powering  Serial powering scheme for ATLAS sLHC  Scheme architecture  Shunt-LDO  AC-coupling  Stave protection  Prototyping status  Material budget calculations  Conclusions 2L. Gonella - TWEPP /09/2010

ATLAS pixels powering LHC  sLHC FE channels:~80M  ~455M Total FE power:6.7kW  12.3kW Total FE current:3.8kA  6kA independent powering  20% efficiency  Very massive services  High x/X0%, saturated cable channels  Independent powering is unfeasible!  Need to transmit power at low currents  lower V drop  Higher power efficiency  Reduced cables cross section  Serial powering or DC-DC conversion x5-6 granularity x2 power x3 current  ATLAS inner det. material distribution (incl. IBL) 3L. Gonella - TWEPP /09/2010

Serial powering  Allows transmitting power at low currents and high voltages  A chain of n modules is powered in series by a constant current I  Current to voltage conversion is performed locally (on chip/module) by regulators  Key facts  I scales of a factor n, with respect to parallel powering  V drop is limited only by the power density and the I source output voltage capability  Allows optimal trade off between efficiency and material parallel powering serial powering 4L. Gonella - TWEPP /09/2010

Regulators: on or off chip? Ratio of converter/detector Figure Of Merits (FOM)  radiation thickness penalty for using converters in active areas  FOM for silicon detectors: (load resistance) x (active area)  Pixels = 10 Ω ·cm 2  Strips = 100 Ω ·cm 2  FOM for converters: ε /(1- ε ) x (output resistance) x (x/X0) x (area)  External converters =1-5% x/X0· Ω ·cm 80% efficiency  Penalty for pixels = 0.5% x/X0 per layer  Penalty for strips = 0.05% x/X0 per layer  Strips can use external converters  Pixels must use internal/on chip converters  Penalty >0.2% x/X0 per layer too severe  Target for ATLAS sLHC < 2% x/X0 per layer 5L. Gonella - TWEPP /09/2010

On-chip regulators for SP  FE needs analog and digital voltage  2 regulators/FE  Redundancy  Connect all regulators on module that take I in in parallel  In case of failure of one regulator, the current can still flow through the other regulators on the module and the power chain is not interrupted REGULATOR REQUIREMENTS Very robust against mismatch and process variation Able to cope with increased input current  6L. Gonella - TWEPP /09/2010

System aspects AC-coupled module readout Stave protection  Modules in a chain are on different gnd  Assure supply of power to the SP chain in case of failures  Allow power to arbitrary selection of modules  Requirements  Slow Control  Fast Response  Low power density  Minimal x/X0  Radiation hardness Protection Module AC-coupled readout 7L. Gonella - TWEPP /09/2010

SP for ATLAS  Starting point for development of a SP scheme: pixel outer layers  Technology to build them is available  Planar sensors on 6” wafer  FE-I4 with minor differences wrt. IBL  GBT system for data  A stave concept is being developed  Entering the prototyping phase Current pixel detector layout 4 barrel layers (5 th one considered) 5 disks/side 8L. Gonella - TWEPP /09/2010

sLHC outer layers  32 modules/stave  16 top, 16 bottom  2x2 FE-I4 modules  Electrical unit = ¼ stave (i.e. 8 modules)  1 stave cable/el. unit  1 EOS card/el. unit Active 33.9 x Flex pigtail (connector plugs into page) ‏ Pixel orientation Flex down to chip w-bonds Module top view glue FE sensor flex connector Compressed scale 1.0 mm stiffener passives FE Module side view 9L. Gonella - TWEPP /09/2010

Current (i.e. power) to the modules  Current delivered to the modules via stave cable and module flex  Power unit = electrical unit = 8 modules  I tot = I mod = ~2.4 A  FE-I4 nominal current = ~600 mA  Current to voltage conversion on-chip  Shunt-LDO  2 Shunt-LDO/FE to generate VDDA = 1.5 V and VDDD = 1.2 V  8 Shunt-LDO on the module operate in parallel IinIout Shunt-LDO 1.5V1.2V FE-I4 Shunt-LDO 1.5V1.2V FE-I4 Shunt-LDO 1.5V1.2V FE-I4 Shunt-LDO 1.5V1.2V FE-I4 I in I out 10L. Gonella - TWEPP /09/2010

Shunt-LDO working principle Combination of an LDO and a shunt transistor Shunt regulation circuitry  const I load LDO regulation loop  constant V out Shunt-LDO: simplified schematic LDO compensates V out difference 2 Shunt-LDOs in parallel: equivalent circuit  Shunt-LDO can be placed in parallel without problems due to mismatch  Shunt-LDO with different V out can be placed in parallel  Shunt-LDO can cope with increased I in  Normal LDO operation when shunt circuitry is off 11L. Gonella - TWEPP /09/2010

Shunt-LDO characterization Working principle and good performance demonstrated by 2 prototypes 2 Shunt-LDO in parallel generating different V out Load regulation  V in and V out stable until (I load1 + I load2 ) = I supply (= 0.8 A)  Effective R out = 60 m Ω (incl. wire bonds and PCB traces) V out generation  After saturation  V out different potentials  R in ≈ 2 Ω 12L. Gonella - TWEPP /09/2010

Shunt-LDO in a serial powering chain Shunt-LDO 0Shunt-LDO 2 Shunt-LDO 1Shunt-LDO 3 4 Shunt-LDOs in series generating V out = 1.5V 13L. Gonella - TWEPP /09/2010 Shunt-LDO 0 Shunt-LDO 1 Shunt-LDO 2 Shunt-LDO 3 I source

Shunt-LDO efficiency  Shunt-LDO sources of inefficiency  LDO dropout voltage V drop  I shunt  Δ V between the 2 V out needed by the FE  Calculation for ATLAS Pixels nominalworst casebest V out1 [V]1.4 V out2 [V]1.2 I out1 [A] I out2 [A] V drop [V] I shunt [A] Δ U [V] I TOT [A] P_eff, %77.78%90.81% P_eff, %59.56%76.80% P_eff, %76.14%90.32% ΔP_eff, %6.57%5.16% P_eff,1-2g75.00%69.56%85.16% 14L. Gonella - TWEPP /09/2010

AC-coupling Widely used termination technique in telecommunications  Optimal V CM at RX input  Level shifting  Guard against differences in ground potential  Needed for module readout in a serial powering scheme  Independently of the powering scheme might be needed for the ATLAS pixels upgrade  Concerns about long data transmission lines  Discussion already started about possible need for AC- coupling  Possible compatibility issues between FE-I4 and GBT standards  LVDS vs. JESD8-13: SLVS m 15L. Gonella - TWEPP /09/2010

Possible AC-coupling implementations Favorite option: direct AC-coupling at RX input Simple, low material Requires self biased RX input & DC-balanced data Downlink: clk & cmd  FE-I4 RX input self biased  clk inherently DC-balanced  cmd are not DC balanced but  Slow data (40MHz)  Rail-to-rail receiver, i.e. can accommodate some V CM shift arising from non-DC balanced data Uplink: data  FE-I4 data are 8b10b encoded  GBT accepts any encoding  RX inputs do not have integrated self biasing circuitry, but this could eventually be done externally Alternative option: link with feedback Successfully used for the SP proof of principle Higher complexity, more material 16L. Gonella - TWEPP /09/2010

Stave protection Proposed protection scheme  1 Module Protection Chip/module  Could be placed on pigtail  1 AC-coupled slow ctrl line/MPC from the DCS  8 lines/stave cables  One capacitor/line on the DCS side MPC flex sensor FE connector stiffener module MPC module DCS MPC Working principle  DCS can switch on/off selected modules via slow ctrl line  In case of overvoltage  Fast response circuitry in MPC reacts  DCS switches off the module  MPC can be used also for power on sequence 17L. Gonella - TWEPP /09/2010

Module protection chip C1 M bp local VDD DCS GND ADC C2 D1 D2 local GND OV D3 module Iin Iout  130nm IBM  Bypass transistor  Independent slow ctrl line & OV protection  OV protection = Silicon controlled rectifier  Preliminary simulations: V gs bp AC-signal V mod I mod I bp Slow ctrl I bp V mod V gs bp ~850mV Fast response C1 = 100nf C2 = Cgs = 33pf D1, D2 = PMOS Bypass DGNMOS W = 48mm L = 0.24µm 18L. Gonella - TWEPP /09/2010 V (V) I (A) time (ms) r ( Ω ) time (ms)

Prototyping Goal: prototyping an sLHC pixels outer layer with serial powering to try the concept extensively  Outer pixel layers prototyping started in the pixel collaboration  4-chip sensor design in production, FE-I4 submitted  stave cable and type1 cables already prototyped  In progress: stave mechanics and cooling studies, EOS cards design, …  Serial powering related activities in Bonn  Design of LV lines on stave cables  Design of module flex: 1 st prototype in production  Allows testing SP, direct powering, direct powering with DC-DC Stave cable Module flex 19L. Gonella - TWEPP /09/2010

x/X0: SP vs. DC-DC – active area x/X0% SP x/X0% DC-DC (%) Direct powering with DC-DC conv  fixed V drop between V source and voltage regulator on PP1, x2 charge pump DC-DC converter in FE-I4  0.2V on stave, 0.8V on Type 1 services DC-DC conv: Vdrop = 0.2V  P cable = 5.56% P tot  LV cables: 0.093% x/X0 P cable = 5.88% P tot  LV cables = 0.014% x/X0  ~85% less material Serial powering LV lines (Al + kapton):0.056% x/X0 AC-coupling C:0.018% x/X0 Protection: 0.010% x/X0 Total:0.084% x/X0 Direct powering w/ DC-DC conversion LV cable (Al + kapton):0.139% x/X0 External C: 0.015% x/X0 Total:0.154% x/X0 x/X0% LV lines (Al only) 20L. Gonella - TWEPP /09/2010

x/X0: SP vs. DC-DC – large η  Services dominate the material budget  Cable channels are saturated ATLAS inner det. material distribution (incl. IBL) DC-DC conv: V drop = 0.8V  LV cables: mm 2 Al x-section V drop = 0.8V  LV cables: 684mm 2 Al x-section x/X0 SP ≤ 0.25 x/X0 DC-DC 21L. Gonella - TWEPP /09/2010

Conclusions  Scheme architecture definition, power efficiency and material budget calculations ongoing  A custom developed new regulator concept targeting serial powering has been developed: Shunt-LDO  2 prototypes confirmed working principle and good performance  2 Shunt-LDOs/FE-I4  AC-coupling and protection schemes have been proposed  FE-I4 LVDS RX designed with self-biased inputs for direct AC-coupling with DC-balanced data  Simulation of a Module Protection Chip started  Prototyping of an ATLAS pixel detector outer layer featuring serial powering for sLHC has started A serial powering scheme for the ATLAS pixel detector at sLHC is being developed at Bonn University 22L. Gonella - TWEPP /09/2010

On-chip voltage generation: basic  2 regulators/FE to generate analog and digital V  For redundancy, connect all regulators on a module that take I in in parallel  Example  1 shunt + 1 LDO / FE  The shunt regulator takes I in and generates V dd  The LDO takes V dd as input and generates V dda  Connect all shunt regulators on a module in parallel  Enhance the stability of the output voltage → the internal resistances are also in parallel → lower total resistance → steeper I-V characteristic  Steep I-V characteristic + Different V out due to mismatch & process variation → At turn on most of the shunt current will flow to the regulator with lowest V out → Potential risk of device break down at turn on → Use an input series resistor to reduce the slope of the I- V characteristic and help distributing the shunt current between the parallel placed regulators  R does not contribute to the regulation and consumes additional power  Requirements for the regulator  Very robust against mismatch and process variation  Able to cope with increased input current I in V dd V dda LDO Shunt without resistor Iin[mA] with resistor Vout[V] L. Gonella - TWEPP /09/2010

Shunt-LDO: working principle  Combination of a LDO and a shunt transistor  R slope of the shunt is replaced by the LDO power transistor  Shunt transistor is part of the LDO load  Shunt regulation circuitry ensures constant I load  I ref set by R3, depends on V in (  I in )  I M1 mirrored and drained in M5  I M1 and I ref compared in A3  M4 shunts the current not drawn by the load  LDO regulation loop sets constant output voltage V out  LDO compensates output potential difference simplified schematics 24L. Gonella - TWEPP /09/2010

Shunt-LDO: features  Also, Shunt-LDO regulators having different output voltages can be placed in parallel  Extra V at the input of the regulator with lower output voltage drops across its LDO  Shunt-LDO can cope with an increased supply current if one FE-I4 does not contribute to the regulation e.g. disconnected wire bond  I shunt will increase  Shunt-LDO can be used as an ordinary LDO when shunt is disabled Parallel placed regulators with different output voltages - simulation results - slope = R3/mirror ratio Current splits equally between the 2 regulators V out = 1.5V V out = 1.2V  Shunt-LDO regulators can be placed in parallel without any problem regarding mismatch & shunt current distribution  Resistor R3 mismatch will lead to some variation of shunt current (10-20%) but will not destroy the regulator 25L. Gonella - TWEPP /09/2010

Shunt-LDO: prototypes and test system  Test setup  Two Shunt-LDO regulators connected in parallel on the PCB  Biasing & reference voltage is provided externally  Input & load current is provided by programmable Keithley sourcemeter  Input & output voltages are measured automatically using a Labview based system  Shunt current is measured by 10m Ω series resistors and instrumentation opamp  2 prototypes submitted and tested  September 2008, March 2009  V out = V, V dropout MIN = 200 mV, I shunt MAX = 0.5 A, R in = 4 Ω, R out = 30 m Ω 26L. Gonella - TWEPP /09/2010

2 Shunt-LDO in parallel  Load regulation measurement  1.5(1.2) V output sees fix I load = 0.4 A  1.2(1.5) V output has variable I load  V in and V out collapse when the overall I load reaches I supply (= 0.8 A)  Effective output impedance R = 60 m Ω (incl. wire bonds and PCB traces)  Generation of different V out  V out settles at different potentials  V out1 and V out2 slightly decrease with rising input current (V drop on ground rails leads to smaller effective reference voltages)  Non constant slope of V in  R in ≈ 2 Ω (after saturation) 27L. Gonella - TWEPP /09/2010

Shunt current distribution at start-up  Unbalanced I shunt distribution at start-up  More I shunt flows to the regulator which saturates first (i.e. to the regulator with lower V out )  However I shunt MAX is not exceed  Improvement of shunt distribution as soon as both transistors are saturated  Non - constant slope of V in closely related to I shunt distribution 1 st prototype 2 nd prototype 2 SHULDOs in parallel with different V out  Bad mirroring accuracy for non saturated transistors due to offset at the input of A2  Wrong current is compared to the reference  Hypothesis confirmed by simulations and second prototype  Scaling of input transistor of A2 by factor 4 halves the unbalance 28L. Gonella - TWEPP /09/2010

Shunt current distribution  No problem at start-up if the 2 SHULDOs generate the same V out  They saturate at the same time  If V out is changed with both regulators being saturated the shunt current changes of about 1.4%  Unbalanced I shunt at start-up can be avoided completely by choosing the same V out at start-up and setting different V out afterwards Vout1 fixed at 1.2 V Vout2 varies ( 1.2 – 1.5 V ) 2 SHULDOs in parallel with same V out at start-up 29L. Gonella - TWEPP /09/2010

SHULDO: Load Transient Behavior  I load pulse of 150mA (15mV measured across 100m Ω )  10mV output voltage change load pulse V out 30L. Gonella - TWEPP /09/2010

SHULDO Efficiency 31L. Gonella - TWEPP /09/2010

SHULDO Efficiency 32L. Gonella - TWEPP /09/2010

Self-biased RX input: Simulation Results 33L. Gonella - TWEPP /09/2010

Self-biased RX input: Start-Up 34L. Gonella - TWEPP /09/2010

Self-biased RX input: Almost Steady State 35L. Gonella - TWEPP /09/2010

Module Protection Chip  130nm CMOS technology  Bypass transistor  AC-coupled slow control line  can be used to monitor V mod when idle  Independent over voltage protection circuitry  Specs for 4-chip FE-I4 module (*)  I nom = 2.4A, I MAX = 3.5A  AC-signal frequency = 100k – 1MHz  AC-signal amplitude = V gs bypass  OV protection threshold: V thMIN = 2V – V thMAX = 2.5V  OV protection time response = 100ns C1 M bp local VDD DCS GND ADC C2 D1 D2 local GND OV D3 module Iin Iout (*) preliminary 36L. Gonella - TWEPP /09/2010

Bypass Transistor  I = 3.5A, V ≥ 1.6V (max 2.5V)  DG NMOS  Radiation hardness  ELT to cut leakage current path  Positive V th shift at TID ≥ 1Mrad  Account for Δ V th = 200mV in simulations  Operational temperature  Not yet defined, will depend on the sensor  Simulations with T = (-27 ÷ +27) o C  Low power consumption when on  Process Corners  W = 48mm, L = 0.24µm M bp local GND local VDD Shunt-LDO I in I out 1.4/1.2V V drop (min) = 200mV  Power consumption (worst case)  Bypass on  335.1mW  Bypass off  25µW 37L. Gonella - TWEPP /09/2010

Control Line  Rectifier  In a diode connected MOSFET V ds = V gs ≈ V th  To increase the power conversion efficiency  V sb < 0 when diode is forward biased  V th smaller  V ds smaller  V sb > 0 when diode is reversed biased  V th higher  smaller leakage current  use PMOS or triple well NMOS (allow to connect bulk in the “forward direction”)  Thin oxide transistor  W = 10µm for radiation hardness  2 PMOS in series to avoid gate oxide breakdown (AC-signal amplitude > 2.5V) 38L. Gonella - TWEPP /09/2010

Control Line: Simulation Results  AC-signal: 2.6V, f = 100k – 1MHz  V gs bypass: 2.5V  V mod : 1.6V  ~60mV  I mod : 3.5A  ~100mA  Control from DCS works fine V gs bp AC-signal V mod I mod I bp 39L. Gonella - TWEPP /09/2010

Over-Voltage Protection  Silicon Controlled Rectifier  Parasitic elements (BJTs) in CMOS technologies (inverter in IO pads)  Latch-up condition: I/O voltage (U E Q1 ) > VDD  Q1 begins to conduct  Q2 switches on  Q1 draws even more current  Shorts the supply rails when triggered  That is exactly what we want! R1 M2 M1 R1 R2 M bp Local VDD Local GND module  Use MOSFETS instead of parasitic BJTs for better control of operation parameters  Trigger threshold defined by R2/R1  Want to draw high currents  R1 small  or use additional ‘power’ NMOS  bypass 40L. Gonella - TWEPP /09/2010

SCR: Simulation Results  Sweep of R mod  V mod increases, I mod constant  The voltage across the module is effectively clamped down when the SCR activates, however  V ds bp = V gs bp  impossible to get V mod = 100mV and V gs bp = 2.5V  V mod = 850mV & I bp ≈ 3A  too high power density  The DCS should sense the OV on the module and switch on the module I bp V mod V gs bp ~850mV 41L. Gonella - TWEPP /09/2010

HV Distribution  Use one floating HV supply per module  no problem  Use 1 HV supply per power group  several schemes possible, e.g. using the serial power line as HV return 42L. Gonella - TWEPP /09/2010