Laboratory Operations Board Enhancements Mark Gordy & Gayle Smith March 25, 2014 Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN.

Slides:



Advertisements
Similar presentations
Presentation for: Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN Prepared by: Gayle Smith Facilities Information Management System.
Advertisements

Computer Generated Reports WHERE TO BEGIN AIMS Challenge Your Current Reporting Process Improve Your Understanding of Computer Generated Reports Identify.
STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Acquisition and.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Which server is right for you? Get in Contact with us
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Stakeholder Workshop July 27, Present updated information on the Central Groundwater Storage Plan Receive additional stakeholder input Discuss next.
Appraisal, Acquisition & Relocation System (AARS) REAL ESTATE SECTION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT.
Overview Scheduler 1.Tx Plan – Special Considerations – Copy when copying to a new Tx Plan 2.Patient comments extended to 7000 characters 3.Alerting change.
2011 FIMS /Real Estate Workshop Las Vegas, NV June 14, 2011 Presented by: Michael Kohut, DOE Headquarters (EES) Gayle Smith, DOE Headquarters (EES)
I-Suite Update Version 13 I-Suite General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
TRANSPORTATION POLICY COMMITTEE FINAL REPORT AND RECOMMENDATIONS PROFESSIONAL AND TECHNICAL STAFF COUNCIL ALUMNI CENTER APRIL 2, 2003.
Lytec Medical XE New Feature List. 2 What’s new with Lytec Medical XE? Features: –HIPAA features –Timesaving features –Miscellaneous features New product.
Server Virtualization: Navy Network Operations Centers
Reserve Study A Short and Long Term Budgetary Planning Vehicle
NESD General Changes Academic Changes  K – 8 Changes  9 – 12 Changes  Reminders Personal Social Development  Changes  Reminders General.
ZOM Major Amendment to Arbor Greens PD. Overview Arbor Greens PD site +/- 152 ac Amendment request summary –Extension of buildout date from 2014.
Information Technology Report Dave Pagliai Manager, IT Support Services February 2015 ERCOT Public.
High School Task Force DECATUR PUBLIC SCHOOLS 02/03/2009.
Work-Specific Hazard Checklist (WSHC) May 20, 2013 Mark Berkheimer, CHMM ORAU EH&S Specialist 3/Chemical Hygiene Officer 1.
FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual.
1 FIMS Population Queries FIMS/Real Estate Workshop Memphis, TN June 3, 2009 Gayle Smith Mike Kohut Energy Enterprise Solutions.
ANNUAL FIMS COMPREHENSIVE TRAINING Y- 12 NEW HOPE CENTER OAK RIDGE, TN MARCH 25, 2014 GAYLE SMITH Accomplishing FRPP Reporting and Improving Data Quality.
How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.
National Laboratory Operations Board Infrastructure Assessment Subgroup Real Property Background Carmelo Melendez.
Facilities Information Management System (FIMS) Data Validation Inbrief program Facilities site name date.
Facilities Information Management System (FIMS) Data Validation Outbrief [Program] [Site] date.
2014 FIMS Annual Training Oak Ridge, TN March , 2014 Presented by: Michael Kohut, DOE Headquarters (GCI)
Managed by UT-Battelle for the Department of Energy Weatherization Assistant: Ramp Up Support Mark Ternes Mike Gettings Oak Ridge National Laboratory 2009.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Proposed FIMS Data Elements for Removal FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy Energy Enterprise Solutions.
1 FIMS Lease Management and More 2009 FIMS/Real Estate Workshop Memphis, TN June 3, 2009 Prepared by: Gayle Smith, Energy Enterprise Solutions.
FRPP Data Issues FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy & Gayle Smith Energy Enterprise Solutions.
Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
FIMS Standard Report Enhancements FIMS/Real Estate Workshop Palm Springs, CA June 2 – 6, 2008 Mike Kohut Gayle Smith FIMS Technical Support Presented.
STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Asset Management.
Smart Schools Bond Act Investment Plan Submission Information and Review Process Presentation to Regional Partners Hosted By: Capital Region BOCES October.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and.
Mark Gordy Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
ANNUAL FIMS COMPREHENSIVE TRAINING ARGONNE NATIONAL LABORATORY MAY 6, 2015 GAYLE SMITH Federal Real Property Profile Reporting.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure.
FIMS Workshop June 2-6, 2008 Jolie Macier. A subcommittee of individuals comprised of Field Office users, including DOE contractor personnel, that recommend.
Environmental Protection Agency 1 The High Production Volume Information System (HPVIS) Demonstration and Status National Environmental Partnership Summit.
APRIL 2, 2012 EDUCATOR PREPARATION POLICY & PRACTICE UPDATE.
Mark Gordy, PMP Energy Enterprise Solutions, LLC 2013 Property Management Workshop May 22, 2013.
Laboratory Operations Board
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Mark Gordy, Headquarters (EES) Facilities Information Management System Data Quality and.
Mark Gordy Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Betterment Adam Pugh 2015 FIMS & RE Annual Training May,
Freeze the Footprint Update March 25, 2014 Presented for Monja Vadnais Facilities & Infrastructure Division (MA-652) Office of Acquisition and Project.
February 23, 2006 MTAC Workgroup #87 Improving the Drop Shipment Process Update.
SMART SCHOOLS BOND ACT– MARCH 2016 Michelle Okal-Frink (716) Contact Michelle or your CSR for more information.
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Gayle Smith, Headquarters (EES) Facilities Information Management System Upcoming FIMS Enhancements.
FIMS Data Quality FIMS Annual Training May 10-12, 2016 Prepared by: Mark Gordy and Gayle Smith.
FIMS FY16 Year-End Schedule FIMS Annual Training May 10-12, 2016 PREPARED BY: GAYLE SMITH.
University of Arizona Health Sciences College of Medicine Space Dashboards Presenters: Angela Souza, Senior Director, UAHS Planning and Facilities Mary.
Strategic Planning and High Performance Design to Reduce Energy and Environmental Impacts at Brown University EPA Brownfields 2006 Kurt Teichert Resource.
1 of 32 Performance Measures and the State of Our Facilities Eric Haukdal MA-50 Office of Asset Management.
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
Real Property Policy Update Planning and Development Committee August 4, 2015.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Prepared by: Adam Pugh May 10-12, 2016 FIMS/RE Annual Training.
Low-Level Radioactive Waste (LLW) Disposition at the
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Presentation transcript:

Laboratory Operations Board Enhancements Mark Gordy & Gayle Smith March 25, 2014 Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN

Facilities Information Management System Currently in FIMS New Mission Window Expanded Hazard Category Security Data Element Future Release New Condition Window New Utilization Window

Facilities Information Management System Mission Window (Buildings, Trailers, OSF’s) Mission Unique Facility (New) Mission Unique Facilities are defined as one-of-a kind, physically unique, large-scale, technically complex, long-lived operations that are critical resources to the mission of the DOE and to the nation. They are essential in order for DOE to deliver on its core mission. They are not easily reconfigurable for alternate use. Defaults to ‘Not Mission Unique’ Pick list data element that will include options that are HQ Program Office approved Mission Unique Facilities Contains three existing FIMS fields Mission Dependency, Mission Dependent Program, and Core Capabilities (formerly called Capabilities) Deployed on March 13, 2014

Facilities Information Management System Hazard Category & Security Hazard Category Hazard Category has been expanded to include the options of Nanoparticle, Biosafety Levels 1-4, and Beryllium The option to select multiple categories will be provided in a future release Deployed on March 13, 2014 Security (New) Addresses (Yes/No) if the asset or element thereof is subject to security measures beyond property protection and/or the asset is included in an area subject to protection beyond property protection. Property protection and beyond property protection are defined in DOE O Defaults to ‘No’ for all assets. Required for buildings, trailers, and OSF’s (all ownerships) Deployed on March 19, 2014

Facilities Information Management System Upcoming FIMS Enhancements Condition Window

Facilities Information Management System Condition Window (Buildings, Trailers, OSF’s) Overall Asset Condition (New) Pick list field with options of: Adequate, Substandard, and Inadequate. Replaces the current Summary Condition in FIMS. Condition Notes (New) High level overview of how the condition of the asset is impeding the mission. Required for Substandard and Inadequate Overall Asset Condition selections. Modernization Cost (New) Optional data element that represents improvements to an asset that result in better quality of work, increased capacity, and extended useful life

Facilities Information Management System Condition Window (Buildings, Trailers, OSF’s) Optional Uniformat Table Rating (New) – Pick list that will provide options of Adequate, Substandard, Inadequate, and N/A Repair Needs (New) – Cost associated with the Uniformat II category Other Data Element Impacts Year Built and Year Acquired will be moved to the Property Detail window Model Building and Seismic Comments for building and trailers will be moved to the Building/Trailer Info window

Facilities Information Management System

Upcoming FIMS Enhancements Utilization Window

Facilities Information Management System Utilization Window (Buildings & Trailers) Gross Square Feet and Usable Sqft Existing FIMS data elements. Net Usable Sqft will be renamed to Usable Sqft. Asset Utilization % % Utilized – Current FIMS Utilization data element Utilization Level (New) – Will be system generated using one of the following categories: Over Utilized, Fully Utilized, Under Utilized, and Not Utilized Space Type Utilization % % Utilized (New) – Will be system generated Utilization Level (New) – Will be system generated using one of the following categories: Over Utilized, Fully Utilized, Under Utilized, and Not Utilized

Facilities Information Management System Utilization Window (Buildings & Trailers) Utilization Notes (New) Optional data element that provides for justification of entries or to capture rationale. Space Types (New) Optional section to capture information on High Bay, Ventilation Intensive, Power Intensive, General – Wet, General – Dry, Office and Storage space For each space type, the following will be available for entry Space Type Usable Sqft (New) Space Type Utilization % (New) Space Alternatively Used (New)

Facilities Information Management System

Condition Window Version 2.17 Scheduled for deployment on April 25, 2014 Utilization Window Version 2.18 Deployment date pending final requirements

Facilities Information Management System Questions/Comments