ITS Maintenance Experience in Michigan Gregory D. Krueger, P.E. Metro Region Traffic and Safety Engineer Michigan Department of Transportation.

Slides:



Advertisements
Similar presentations
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Advertisements

Construction Project Coordination Presented by: Philip H
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
TRAFFIC MANAGEMENT Tender and Construction Phase
Top 10 Ways Of Reducing Your Data Center Infrastructure Operating Costs.
Introduction Leasing and hire purchase are financial facilities which allow a business to use an asset over a fixed period, in return for regular payments.
FDOT District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Time for a new standard - AS General Conditions of Contract
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Transfer Pricing Management Control Systems Chapter 6 July 2014Iwan Pudjanegara SE., MM.1.
I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim.
Real Estate Principles and Practices Chapter 15 Property Management © 2014 OnCourse Learning.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
State Auditor’s Office Change Order Pricing Practices Performance Audit of Eight Local Governments Puyallup City Council February 7, 2012 Chris Cortines,
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Bridge Engineering Section Bridge Rehabilitation.
ITS Software A TxDOT Statewide Perspective Charlie Farnham ITS Configuration Manager ITS America June 6, 2007.
The Private Finance Initiative n Advantages * Benefits of the PFI The major appeal of the PFI for the government is that the cost of the hospital does.
JOB ORDER CONTRACTING CONSTRUCTION SERVICES FOR FACILITIES MAINTENANCE AND OPERATIONS April 26, 2014 Presentation for Presented by Troy Alexander Project.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Contract Administration Stacy Sassman Purchasing Agent Iowa State University Cory Harms Associate Director of Purchasing Iowa State University.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
Information System Design IT60105 Lecture 21 Staff Organization, Risk Management and Software Configuration Management.
Payment Mechanisms for PPP Development off PPP and Implementation Possibilities in Latvia Conference, September 2008.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
How RISKY Is This??. How RISKY is This?? Buy a lottery ticket Only 3 will be sold Cost for a ticket $80 million Jackpot $2,000,000,000 Where is the
Pwc NDIA Annual Educational Seminar Contracting for Services March 31, 2008.
King Fahd University of Petroleum & Minerals
Toll Road Asset Management and the Linkage to Finance Transportation Innovations, Inc. 10/22/
TransXML Survey and Scoping Study NCHRP Project Task 295 (2011) Frances Harrison Spy Pond Partners, LLC.
TYPES OF CONTRACTS.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
1 Transportation Systems Management & Operations A New Paradigm for the 21 st Century Transportation Department Group 3 3 Notches Above the Rest.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Chapter 11: Alternative Approach - Purchasing Systems.
Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
ARCHITECTURE ENGINEERING COMMUNICATIONS TECHNOLOGY AVIATION | CIVIL | CONSTRUCTION SERVICES | DATA SYSTEMS | ENVIRONMENTAL FACILITIES ENGINEERING | GEOSPATIAL.
Briefing to the Portfolio Committee on the Comparison on Procurement Methodologies 6 June 2006.
IQE.
Measurement and Payment
© 2015 Universal Service Administrative Company. All rights reserved E-rate Program Applicant Trainings I Fiber Options1 Fiber Options Deep Dive:
Keith Roberts, P.E. Project Implementation Engineer IDOT – District 9.
Project Budget Review _ Control Developed by: Daniel J. Renna 3/16/20161.
Not for Distribution Outside of MBP1 April 11, 2012.
MOASBO Presentation Outsourcing Substitutes October
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Green Line Extension Project
MnDOT Budget Overview House Transportation Finance Committee Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer February.
Light Rail Transit Project
Enterprise Content Management Owners Representative Contract Approval
Cost Containment Working Group Board Update
DESIGN-BUILD PROGRAM OVERVIEW
Session 11: Finance Function
Presentation transcript:

ITS Maintenance Experience in Michigan Gregory D. Krueger, P.E. Metro Region Traffic and Safety Engineer Michigan Department of Transportation

Background Michigan ITS originally deployed in the 1970’sMichigan ITS originally deployed in the 1970’s Significant expansion in Significant expansion in Continued modernization over timeContinued modernization over time

Current Operations Freeway Operations CenterFreeway Operations Center 180 cameras180 cameras 65 DMS65 DMS detectors2000+ detectors Mixed-media communicationsMixed-media communications Links to partnersLinks to partners No major upgrades in past 10 yearsNo major upgrades in past 10 years

Why Contract? MDOT’s overall program increased approximately 100% in the past 13 years ($1.6B to $3.1B)MDOT’s overall program increased approximately 100% in the past 13 years ($1.6B to $3.1B) MDOT’s staffing levels have fallen 27% in the past 13 years (3,868 to 2,826)MDOT’s staffing levels have fallen 27% in the past 13 years (3,868 to 2,826) MDOT is currently limited in the ability to hire new staffMDOT is currently limited in the ability to hire new staff MDOT currently has 2 staff members doing maintenance of ITS facilitiesMDOT currently has 2 staff members doing maintenance of ITS facilities

Contract History Original system was maintained by in-house staffOriginal system was maintained by in-house staff Expansion maintenance was part of original construction contractExpansion maintenance was part of original construction contract RFP in 2000 for maintenance of hardware and softwareRFP in 2000 for maintenance of hardware and software Contract expired on March 26, 2004Contract expired on March 26, 2004 Currently using an interim maintenance providerCurrently using an interim maintenance provider Developing a new RFP for a long-term maintenance contract (3-5 years)Developing a new RFP for a long-term maintenance contract (3-5 years)

Contract Mechanisms Purchase Orders (small activities)Purchase Orders (small activities) Statewide, task order based general contractsStatewide, task order based general contracts Construction-type contracts (pay items)Construction-type contracts (pay items) Service-type contracts (time and materials)Service-type contracts (time and materials)

Payment Options Pay for level of effort/number of staff (assume X full-time people and pay 100% of their time)Pay for level of effort/number of staff (assume X full-time people and pay 100% of their time) Pay for equipment-days of service (the CCTV must be operational 350 days per year – OR – pay $X per day the CCTV is operational)Pay for equipment-days of service (the CCTV must be operational 350 days per year – OR – pay $X per day the CCTV is operational) Pay for work orderPay for work order

Pay for Level of Effort No incentive to use staff efficientlyNo incentive to use staff efficiently Easy to administerEasy to administer

Pay for Equipment Days of Service Simple to defineSimple to define Incentive for effective use of staff hoursIncentive for effective use of staff hours Moderate complexity to administerModerate complexity to administer

Pay for Work Order Moderate complexity to define (due to overlapping pay items)Moderate complexity to define (due to overlapping pay items) Low to moderate incentive for effective use of staffLow to moderate incentive for effective use of staff Difficult and time consuming to administerDifficult and time consuming to administer

Performance Requirements OptionsOptions –System availability –Response Time –Penalties Issues –Potential for increased bid prices with penalties –Administration effort increases need for inspection, monitoring –Partnership between MDOT and maintenance provider

Performance Requirements Recommendations in MDOT ScopeRecommendations in MDOT Scope –Defined performance requirements –Permit penalties at discretion of engineer –Grace period for system availability –Penalty notification/warning period –Reasonable penalties

Equipment Purchase Include in contractor pay itemsInclude in contractor pay items –Higher risk –How does contractor estimate? Estimated quantity by DOT with contractor bidsEstimated quantity by DOT with contractor bids –Complex to define –Non-specified parts? –Establishes prices for entire contract –Low incentive for doing cost-effective repairs

Equipment Purchase (cont.) MDOT owns inventoryMDOT owns inventory –Difficult to administer –Potential for delay in repairs to unavailable hardware Lump sum equipment “bank”Lump sum equipment “bank” –Industry standard –Allows for material markup (in Michigan) –Takes time to administer

Third Party Damage Separate category in contract since it is impossible to plan forSeparate category in contract since it is impossible to plan for OptionsOptions –Exclude from scope and use other purchasing methods to do work Delay in repairs (have to issue a new work order)Delay in repairs (have to issue a new work order) How do you differentiate claims of damage by others from normal damage or contractor negligence?How do you differentiate claims of damage by others from normal damage or contractor negligence?

Third Party Damage (cont.) Include budget and provision for “as- authorized” work with estimateInclude budget and provision for “as- authorized” work with estimate –Requires an estimate for each third party damage –What if damage is more extensive than originally thought? If authorized with budgetary estimateIf authorized with budgetary estimate –Quick to authorize –Moderately complex to administer –Requires trust between DOT and contractor

Conclusions Need to answer each question to determine contract typeNeed to answer each question to determine contract type DOT resources are valuable – need to determine where those resources are most appropriately usedDOT resources are valuable – need to determine where those resources are most appropriately used Need a method to measure performance of maintenance activitiesNeed a method to measure performance of maintenance activities Use shorter term contracts with pre-approved extensions to avoid being locked inUse shorter term contracts with pre-approved extensions to avoid being locked in Take the time to develop a contract that you are comfortable withTake the time to develop a contract that you are comfortable with