DZero Run IIb PMG February 25, 2003 1 Run IIb DZero PMG  Status overview, issues (Kotcher)  Schedule, project status (Freeman)  AOB Jon Kotcher Fermilab.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
DZero RunIIb Director’s Review February 3, Run IIb Project Status Vivian O’Dell.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
H. EvansRun IIb Trigger Meeting: 26-Feb-04 1 Ensuring Success for L1Cal in Run IIb H. EvansColumbia U. Outline 1.Pre-Installation (extensive use of Test.
September 16, 2002 ID Groups Physics Coordinator B. Klima Software and Computing A. Boehnlein, J. Qian Physics Groups Spokesmen G. Blazey J. Womersley.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
H. EvansRun IIb L1Cal Meeting: 1-May-031 Goals of the Summer Integration Test Summer Integration Schedule –16-Jul-03 – 8-Oct-03 Test Infrastructure –what.
DØ L1Cal Trigger 10-th INTERNATIONAL CONFERENCE ON INSTRUMENTATION FOR COLLIDING BEAM PHYSICS Budker Institute of Nuclear Physics Siberian Branch of Russian.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Mapping for Silicon Run IIb L. Bagby, A. Nomerotski, E. von Toerne December 2002
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
DZero RunIIb PMG June 7, Run IIb Project Status Vivian O’Dell.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
DZero Run IIb PMG January 28, Agenda Run IIb D-Zero PMG January 28, 2003  Overview, issues (Kotcher)  Project status (O’Dell)  Trigger technical.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
FNAL PMG Feb 5, DØ RunIIb Trigger Upgrade WBS 1.2 Paul Padley, Rice University for the DØ Trigger Upgrade Group.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
V. O’Dell, D0 RunIIb PMG 4-Feb Dzero Run IIb PMG  Agenda u Overview & Management News: V. O’Dell u Trigger Upgrade Status:P. Padley u Silicon closeout.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
1 DØ RunIIb Trigger Upgrade: Status Darien Wood for the DØ Trigger Upgrade Group.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
DOE Rev of Run IIb Sep 24-26, Run IIb Silicon Mechanical Design  Run IIa and IIb geometries  Sensor dimensions, numbers, and drawings  Hybrids,
February 3, 2005DZero Run IIb Director's Review1 Standing Committee on Upgrade Installation to Physics Commissioning  Charge: u Convened by spokespersons.
SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
DZero Run IIb PMG December 10, Agenda Run IIb D-Zero PMG December 10, 2002  ESAAB news (Lab, Project, DOE)  Project status, overview (Kotcher)
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Director’s Review July 15, Installation and Technical Commissioning of D0 RunIIb L0 Silicon and Trigger Upgrades Schedule & Costs R.P. Smith for.
D0 PMG, 07Jun05 1 D. Wood, Trigger Upgrade Status Trigger Upgrade Status  The DØ Trigger Upgrade consists of u Complete replacement of Level 1 calorimeter.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Dzero Collaboration Meeting, Sept. 14, M. DemarteauEric Flattum - Fermilab 1 Slide 1 Alice Bean Fermilab/University of Kansas for the D0 Run2b silicon.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
FCAL R&D towards a prototype of very compact calorimeter
Project definition and organization milestones & work-plan
Presentation transcript:

DZero Run IIb PMG February 25, Run IIb DZero PMG  Status overview, issues (Kotcher)  Schedule, project status (Freeman)  AOB Jon Kotcher Fermilab PMG February 25, 2003

DZero Run IIb PMG February 25, Run IIb Project Organization D0 Run IIb Project J. Kotcher, Project Manager R. Partridge, Deputy; V. O’Dell, Associate; W. Freeman, Assistant M. Johnson, Technical Coordinator A. Amorn-Vichet, Budget Officer; T. Erickson, Administration WBS 1.1 Silicon M. Demarteau G. Ginther Sensors R. Demina, F. Lehner Readout System A. Nomerotski, E. von Toerne QA, Testing, & Burn-in C. Gerber 1.1.3, Mechanics & Assembly W. Cooper, K. Krempetz Monitoring M. Corcoran, S. de Jong Production J. Fast Software & Simulation F. Rizatdinova, L Shabalina WBS 1.2 Trigger H. Evans D. Wood L1 Track Trigger M. Narain L1 Cal Upgrade M. Abolins, (H. Evans), P. LeDu L2  Upgrade R. Hirosky Silicon Track Trigger U. Heintz WBS 1.3 DAQ/Online S. Fuess P. Slattery L1 Cal/Track Match K. Johns Simulation M. Hildreth, E. Perez WBS 1.5 Installation R. Smith Silicon Installation Mechanical: H. Lubatti Electronics: L. Bagby, R. Sidwell Trigger Installation D. Edmunds WBS 1.4 Project Administration Administration (D. Wood) Administration (M. Demarteau) Control Systems F. Bartlett, G. Savage, V. Sirotenko Level 3 Systems D. Chapin, G. Watts DAQ/Online Management (P. Slattery) Network & Host Systems J. Fitzmaurice, S. Krzywdzinski George Ginther is new silicon co-leader Eckhard von Toerne is new silicon readout co-leader (replaces Bill Reay) Arisara Amorn-Vichet, new Budget Officer Kurt Krempetz, K. Hanagaki plenary speakers

DZero Run IIb PMG February 25, WBS 1.1: Basic Silicon Design Choices  Six layer silicon tracker, divided into two radial regions u Inner layers: Layers 0 and 1 s Axial readout only s Mounted on integrated support s Assembled into one unit s Designed for V bias up to 700 V u Outer layers: Layers 2-5 s Axial and stereo readout s Stave support structure s Designed for V bias up to 300 V  Employ single sided silicon only, 3 sensor types u 2-chip wide for Layer 0 u 3-chip wide for Layer 1 u 5-chip wide for Layers 2-5  No element supported from beampipe

DZero Run IIb PMG February 25, Silicon Detector Elements  168 silicon staves: basic building block of outer layers  Supported in positioning bulkheads at z=0, z=610 mm Silicon Analogue cables Hybrid  Layer 0 Support structure: University of Washington Silicon Hybrid Digital cable  Layer 0/Layer 1 mated

DZero Run IIb PMG February 25, Silicon Layer 0 Support Structure University of Washington  First Layer 0 prototype carbon fiber support structure delivered to Fermilab for tests in January  Integrated grounding – kapton/copper mesh  Performs very well under deflection tests – major technical achievement Silicon Analogue cables Hybrid CMM head Mounted L0 structure Mounted L0 structure, ground mesh Clamps to inner carbon shell Balls for deflection measurements

DZero Run IIb PMG February 25, Prototype Mechanical Stave Prototype mechanical stave being thermally tested at SiDet Dec 18 ’02 integration milestone met Al-ceramic hybrid (dummy) Stereo silicon, axial mounted underneath Input cooling channel 10/10 (upper) 20/20 (lower) mechanical modules, concatenated

DZero Run IIb PMG February 25, Outer Layer Silicon Module Prototypes 20/20 axial module Silicon sensors 20/20 stereo hybrid SVX4 readout chip 20/20 axial hybrid  First outer layer electrical- grade (“20/20”) prototypes fabricated  Two types: axial & stereo readout  Each are 12 sensors long, ~100 mm in length  Stereo angle obtained by rotating sensors  Testing underway Digital cable

DZero Run IIb PMG February 25, Module Test Results Electrical tests of 20/20 axial module (10 chips) Charge injection Pedestal Unbonded chip Total/ random noise Bonded to single (dual) sensors

DZero Run IIb PMG February 25, Silicon Status

DZero Run IIb PMG February 25, WBS 1.2: Trigger Upgrades Level 1 projects underway  Level 1 Calorimeter  Level 1 Cal-track matching  Level 1 Tracking  Trigger simulations Level 2 projects (not discussed here)  L2 Beta upgrade & STT upgrade  Later start in schedule  VTM’s procured for STT (part of larger order) WBS 1.2: Trigger Upgrade H. Evans (Columbia), D. Wood (Northeastern) WBS 1.2.1: Level 1 Calorimeter M.Abolins(MSU), H.Evans(Columbia), P.LeDu (Saclay) WBS 1.2.2: Level 1 Cal-track match K. Johns (Arizona) WBS 1.2.3: Level 1 Tracking M. Narain (Boston) WBS 1.2.4: Level 2 Beta upgrade R. Hirosky (Virginia) WBS 1.2.5: Level 2 STT upgrade U. Heintz (Boston) WBS 1.2.6: Trigger Simulation M. Hildreth (ND), E. Perez (Saclay)

DZero Run IIb PMG February 25, WBS 1.2.1: Calorimeter Trigger Upgrade  Saclay u ADC+Digital Filter (ADF) u ADF timing distribution board u Analog splitter (for in- situ tests) u ADF Crate/backplane  Nevis u Trigger algorithm board (TAB) u Global Algorithm Board (GAB) u Crates for TAB/GAB u Test system for ADF-to-GAB cables  Michigan State u Interfacing to existing system, framework u Infrastructure L1 Cal/Track Match: University of Arizona

DZero Run IIb PMG February 25, Level 1 Trigger Highlights  Prototype design phase concluded for three major boards in Level 1 trigger upgrade: u Level 1 Calorimeter Trigger s ADC-Digital Filter Board (ADF) - Saclay s Trigger Algorithm Board (TAB) – Columbia University s 2/3 of the PCBs required for L1 Cal –Remaining Global Algorithm Boards (GAB) being completed u Level 1 Calorimeter/Track Match s Flavor Board (MTFB) u Layouts begun  Analog splitter installed during January shutdown in Level 1 Cal rack at DZero Assembly Building, Movable Counting House u Picks off in-situ signals from four trigger towers u Data will be taken, analyzed during next few months u Preparation for tests of full L1 Cal prototype chain (ADF, TAB, GAB), beginning this summer

DZero Run IIb PMG February 25, Analog Splitter: Saclay & MSU  Analog splitter: allows in-situ test of digital filtering with real signals u Designed and tested at Saclay u Shipped to MSU Dec 20 th : tested there u Installed in DØ L1Cal trigger (Run IIa) during current shutdown u Noise tests in progress u Tests with beam (w/ splitter vs. w/o splitter) to follow

DZero Run IIb PMG February 25, WBS 1.2.2: Cal-Trk Match: Arizona  Uses “L1mu” electronics, apart from specialized “flavor board”  Flavor board (MTFB) prototype design >90% complete  Some procurements anticipated for next month  Approval was essential for keeping this on track Run IIa MTFB (scint flavor)

DZero Run IIb PMG February 25, L1 CTT: Boston Univ.  Firmware design for target algorithm began in Nov  “front end” and “back end” code from Run IIa rewritten – latency reduced  Ongoing work on maps of single fibers

DZero Run IIb PMG February 25, Trigger Simulation Progress  Studies of effects of trigger tower thresholds on L1 Cal global sums (missing E T )  L1 Cal tau algorithm included in trigger simulation  Output of Run IIb L1 Cal interfaced to standard DZero framework simulation package  Simulation of Cal-Track matching progressing  Central Track Trigger (CTT) as-built geometry and beam offsets incorporated into simulation u Beam offsets up to ~1 mm do not effect efficiency of Run IIb equations

DZero Run IIb PMG February 25, Production Readiness Reviews (PRR)  First review: “Purple Card” - sequencer/hybrid interface PC card – held 1/30/03. Committee: u C. Gerber (UIC), J. Green (Fermilab), K. Hanagaki (Fermilab), S. Lager (Stockholm), R. Lipton (Fermilab, Chair), R. Sidwell (KSU) u Report submitted – ready to go  Next review: Outer layer silicon sensors, 3/6/03. Committee: u N. Bacchetta (PISA), B. Gobbi (NWestern), J. Ellison (UCR, Chair), R. Lipton (Fermilab), H. Sadrozinski (UCSC), S. Worm (Rutgers) u $1.5M order with Hamamatsu – procurement ready to move upon receiving nod from Committee. Costed in four lots. u Placement of order was second Run IIb DOE milestone (March 24) s Project target date: Feb 18 u PRR report due March 14, procurement immediately thereafter u Project is learning from such experiences

DZero Run IIb PMG February 25, Labor Cost Extracted from Schedule vs. Actuals (R&D) Dec + Jan (predicted) ~ Dec + Jan (observed) Actuals in FY02 k$ Scheduled labor in FY02 k$

DZero Run IIb PMG February 25, Current Conclusions on Labor from 1 st Quarter  We are using very different flavors of people than the schedule predicted  Rates for given flavor consistent with average rates used as input to project cost u actual pay ~ as used in schedule  Using more labor than we thought u 10% high in hours and cost  Actual cost within 1% of predicted  Above all very good…but even though we are using more labor, we are not keeping up with aggressive schedule in all cases u Comments to follow…

DZero Run IIb PMG February 25, Costs Loaded Into COBRA COBRA ready to go (see monthly report) Thanks to Rissa, Dale, Colleen, Dean

DZero Run IIb PMG February 25, Adhering to Schedule  Creating, maintaining a schedule and using it to monitoring progress is only initial step  Essential that next step be taken: extract lessons learned from slippages, implement corrective actions where possible. Anticipate project needs well in advance.  Project has begun to turn this corner  Schedule being taken with increasing seriousness, attentiveness by all principals  This is a major step, will continue until we’ve finished

DZero Run IIb PMG February 25, Miscellany, Conclusions  MoU/SoWs being generated project-wide u Overhead-free MoUs for silicon MRI in place for some time u First formal agreement just completed, Run IIb PO being generated (Louisiana Tech)  COBRA loaded, ready to use u Report on equipment costs only  Technical progress continues to be excellent  Beginning to truly manage to aggressive schedule – positive and important step  No change controls on horizon

DZero Run IIb PMG February 25, Keeping Run II(b) on the Map: Next Six Months  Experiments now directly participating in BD planning. Comes with a price: u Reviews (both sides of table), associated preparation quite extensive  Above demonstrates impact of current climate, + compressed schedule u Heavy emphasis on project management at all levels FebMarAprMayJunJulAug Accelerator Advisory Committee BD Long- Range Plan for Run II due to DOE Director’s Review of BD Long- Range Plan P5 Review of Run IIb Director’s Review of Run IIb DOE (Lehman) Review of Run IIb (CD-3b) DOE Review of Accelerator All information required by DOE for long-term assessment in hand at this point DOE Review of FNAL Program Monthly PMGs: Long-Range BD, Run IIb Green = Beams Div (BD) Brick = Run IIb Detector Projects Dates shown are latest est PAC