Www.floodrisk.org.uk EPSRC Grant: EP/FP202511/1 WP4.4 A Rapid Embankment Breach Assessment (AREBA) Myron van Damme Sept 2011.

Slides:



Advertisements
Similar presentations
Flood Profile Modeling with Split Flows and Weirs
Advertisements

May 2002 LTV & VNK Managing the Safety of Flood Defences in the Netherlands Fola Ogunyoye Presented on Friday 17th May 2002 at the IMPACT Project Workshop,
IMPACT ~ Breach Formation (WP2) Overview of Breach Work Programme.
Assessing Uncertainty when Predicting Extreme Flood Processes.
IMPACT ~ Breach Physical Modelling Review of Modelling Work Undertaken So Far...
Closing breaches in earthen flood defences Technical feasibility of emergency closure concept.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
EPSRC Grant: EP/FP202511/1 Predicting Breach Formation Mark Morris HR Wallingford The Science of Asset Management London – 9 th December.
Measuring Erodibility of Cohesive Soils By Gregory J. Hanson USDA-ARS Hydraulic Engineering Research Unit.
PHYSICAL MODELING OF BREACH FORMATION Large scale field tests Kjetil Arne Vaskinn, Sweco Gröner Norway.
EPSRC Grant: EP/FP202511/1 Session 2 - Improving the management of flood infrastructure Chair Paul Sayers, Leader Infrastructure Management.
Interlinked Modelling of Large Floods by combining one and two-dimensional diffusive wave-approaches P. Kamrath, N.P. Huber, M. Kufeld, H. Schüttrumpf.
Funders: EPSRC Grant: EP/FP202511/1 ENGAGING STAKEHOLDERS WITH UNCERTAINTY ENGAGING STAKEHOLDERS WITH UNCERTAINTY Hazel Faulkner &
A Preliminary Evaluation of the Potential Downstream Sediment Deposition Following the Removal of Four Dams on the Klamath River Yantao Cui 1, Christian.
2014 National RAC and TRB State Representatives Meeting
WINDAM Technology Workshop Sept 1-3, 2009 WINDAMb-e (Windows Dam Analysis Modules)
RIVER FORMATION EARTH’S GRAVITATIONAL FORCE PULLS OBJECTS TOWARD IT’S CENTER OF MASS. WATER FALLING DOWN A SLOPE IS EVIDENCE OF GRAVITY. AS OBJECTS DROP.
Ecosystems – Joining things up in floodplains Cranfield University: Joe Morris, Tim Hess, Peter Leeds-Harrison, Paul Trawick, Helena Posthumus, Quentin.
The case of flooding … waiting for Godot? Stuart N. Lane Institute for Hazard and Risk Research Durham University Acknowledgements:
EPSRC Grant: EP/FP202511/1 Probabilistic Forecasting for Local Flooding David Leedal, Paul Smith, Keith Beven and Peter Young Lancaster.
“Research in dam breaching" Sílvia Amaral PhD Student (1 st year) December, 14 th 2009.
Texas A&M University Department of Civil Engineering Cven689 – CE Applications of GIS Instructor: Dr. Francisco Olivera Logan Burton April 29, 2003 Application.
Project Scope Hire Consulting Firm to perform following:
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation 1-Dimensional Modeling CWPPRA Technical Committee and.
EPSRC Grant: EP/FP202511/1 International workshop to discuss the science of asset management 9 th December 2011, Brunei Gallery, School.
Toronto, May 6-8, 2008Flood Defence1 Risk assessment in trans-boundary cooperation between the Netherlands and Germany Jan Stijnen.
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
EPSRC Grant: EP/FP202511/1 From offshore wave to coastal erosion and overtopping Nicolas Chini 1, Lucy Bricheno 2, Chris Wilson 2,
SPECIFICATION TARGET: to be able to explain the impact of weathering, erosion and mass movement on river landscapes.
Discussion and Future Work With an explicit representation of river network, CHARMS is capable of capturing the seasonal variability of streamflow, although.
BREACH FORMATION A Review of State-of-the-Art Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 16/17 May 2002.
Methods A predictive method will be developed from NBSS measurements and vegetation/channel properties from the flume data. The predictive method will.
A JOINT PROJECT OF MISSISSIPPI STATE UNIVERSITY AND the Lower Mississippi River Forecast Center PROJECT FUNDED BY NOAA/OAR THROUGH THE NORTHERN GULF INSTITUTE.
EPSRC Grant: EP/FP202511/1 Improved Methods for Predicting Trash Loading at Culverts with Trash Screens Nick Wallerstein & Scott Arthur.
Industry & Research: Issues, needs and conclusions from the US IMPACT Investigation of Extreme Flood Processes & Uncertainty Workshop at HR Wallingford,
2.2 What are the major fluvial processes?
Formulation of a New Breach Model for Embankments IMPACT Project Workshop, Wallingford 2002 Breach Formation Theme.
Scenarios 1.Tidal influence 2.Extreme storm surge (wave overtopping, max. limit 200 l/s/m, period 2 h) Outlook calibration and validation of 3D model transfer.
InVEST Analysis Lafarge Ecosystem Services Project Avoided Reservoir Sedimentation Results Lafarge Presque Isle Quarry.
Reducing the Risk of Embankment Failure Under Extreme Conditions Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 17 May 2002.
Assessment of Runoff, Sediment Yield and Nutrient Load on Watershed Using Watershed Modeling Mohammad Sholichin Mohammad Sholichin 1) Faridah Othman 2)
Funders: EPSRC Grant: EP/FP202511/1 Communicating flood risk science at the academic- practitioner interface Meghan Alexander * Hazel.
National-scale quantified analysis of future flood risk in the UK Paul Sayers Head of Floods and Water Management HR Wallingford, UK Jim Hall Professor.
EPSRC Grant: EP/FP202511/1 WP4.2 – Performance based inspection of flood defence infrastructure: Integrating visual inspection and.
Feeling tired and wrinkly? Need some rejuvenation?
DAM BREAK RISK IN COLOMBIA A Geospatial Assessment of Population Vulnerability from Flood Inundation Eugene Derner, GEOG 594a Spring 2014.
A New Flood Inundation Model Yang Liu and Garry Pender School of Built Environment Heriot Watt University.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
IMPACT 5 November 20044th IMPACT Workshop - Zaragoza1 Investigation of extreme flood Processes and uncertainty UniBwM Breach Modelling Dr.-Ing. Karl Broich.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation Integration of Results 6 Month Progress ERDC West Bay.
ATU Decision Support System. Overview Decision Support System – what is it? Definition Main components Illustrative Scenario Ontology / Knowledge Base.
This training was prepared by the U.S. Department of Agriculture (USDA) team of Otto Gonzalez-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
IMPACT 13 May Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme Flood Processes and Uncertainty.
IMPACT 4 November 20044th IMPACT Workshop - Zaragoza1 Investigation of extreme flood Processes and uncertainty Model uncertainty How uncertain are your.
Models of the Earth Section 3 Section 3: Types of Maps Preview Key Ideas Topographic Maps Topographic Maps and Contour Lines Index Contour, Contour Interval,
PART 2 – SITES EARTH SPILLWAY EVALUATION B. Earth Spillway Integrity Analysis i. Three phase model of spillway performance ii. Phase 1 and phase 2 inputs.
VIEWING SURVEY DATA IN CONTEXT: CRITICAL, MAINTENANCE AND DESIGN TRIGGER LEVELS Jonathan Clarke Canterbury City Council.
International Levee Handbook Overview of the handbook Chapter 8 Physical processes and tools for levee assessment and design.
RASP - Risk Assessment of flood and coastal defence for Strategic Planning A High Level Methodology Project partners and co-authors Paul Sayers / Corina.
NASA BAER Project: Improving Post-Fire Remediation Through Hydrological Modeling NASA Applied Science Program Applied Sciences Program - Wildfires.
What is the Bradshaw model?
Presented by Engr. Motaher Hossain
Flood Forecasting as a tool for Flood Management
IMPACT ~ Breach Formation (WP2)
Flood Routing.
IMPACT BREACH FORMATION (Location).
Earth and Rock fill Dams
IMPACT ~ Breach Formation (WP2)
IMPACT BREACH FORMATION.
Presentation transcript:

EPSRC Grant: EP/FP202511/1 WP4.4 A Rapid Embankment Breach Assessment (AREBA) Myron van Damme Sept 2011

Goal of the work WP4.4 (University of Oxford and HR Wallingford): Rapid breach assessment - will develop simplified equations for the rapid prediction of breach size for a limited range of embankment structures. The methods will be directly applicable to practicing engineers and will replace the default and very approximate breach modelling methods currently included within the RASP family of tools.

EPSRC Grant: EP/FP202511/1 Context – system risk needs System risk models simulate flood risk from many combinations of potential defence failures, inundation etc. Assumptions for breach are currently crude. Hence, the need for a more accurate, fast breach model – simplified breach

EPSRC Grant: EP/FP202511/1 Context – Physical processes Failure mechanism for breach depends upon hydraulic loading and soil erodibility Surface erosion Headcut Piping (internal erosion) Failure mechanism for breach depends upon hydraulic loading and soil properties (erodibility, cohesion) Surface erosion Head cut Piping (internal erosion)...

Study physics Study HR Breach Creation of the simplified breach model Create datasets with HR Breach Derive simplified physical equations Estimate inaccuracies input parameters Collect breach data Organize data into datasets Validate model against datasets Estimate inaccuracies datasets Create the simplified model Are the model predictions within the uncertainty band? yes no Check the code Write up the method behind the development of the simplified model.

Underlying assumptions (1)  1D flow behaviour  No equilibrium transport conditions (HR BREACH)  Instantaneous failure grass cover (HR BREACH)  Soil erodibility is equal along the embankment and constant in time (BRES, HR BREACH) Source: TAW (1999)  Downstream slope retreats through the embankment before widening (surface erosion) f.e. BRES model (Visser 1997)  No lowering of the crest level before the headcut has reached the upstream slope. (SIMBA) (Temple & Hanson (2005))  Breach widening rate is a function of the rate at which the crest lowers. (HR BREACH, SIMBA) Mohamed (2002)

Underlying assumptions (2)  Slope gradient of the inland slope is limited (BRES)  Fixed side slope assumptions (BRES, SIMBA)  Headcut starts at the top of the inland slope (SIMBA)  No erosion below the foundation of the embankment (HR BREACH)  An initial pipe diameter widens in an equal rate due to the flow through the pipe  After slumping of the soil above the pipe, potential further failure of the embankment is described by the surface erosion failure process

Global description: surface erosion

Global description Headcut erosion

Performance and validation AREBA gives promising results when being bench marked against HR BREACH Validating AREBA against the IMPACT experiments showed that the model prediction lie within the bounds of uncertainty following from the uncertainty in input parameters Run speed AREBA is approximately 0.2s per run.

Conclusions A fast running simplified breach model has been developed suitable for the use in system risk models that deals with grass protection failure, surface erosion failure, head cut failure, and piping. The model is able to predict a flood hydrograph that falls within the bounds of uncertainty given by the input parameters. A comparison between the outcomes for system risk analysis using the current method applied in RASP versus this new approach is currently underway. Deliverable = report detailing the modelling methodology (Jan 2012)

EPSRC Grant: EP/FP202511/1 Acknowledgement The research reported in this presentation was conducted as part of the Flood Risk Management Research Consortium with support from the: Engineering and Physical Sciences Research Council Department of Environment, Food and Rural Affairs/Environment Agency Joint Research Programme United Kingdom Water Industry Research Office of Public Works Dublin Northern Ireland Rivers Agency Data were provided by the EA and the Ordnance Survey. Thank you to: Mark Morris, Alistair Borthwick for their ongoing supervision. Mohamed Achmed Ali Mohamed Hassan for his assistance