Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
EU Developments Transmission Workgroup 3rd November 2011.
15 th September 2013 Enagás and TIGF Information to NRAs.
Progress with coupling FUI and CWE region
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
EU Developments Transmission Workgroup 6th October 2011.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
RWE Transportnetz Gas 04/28/2009PAGE 1 ERGEG Gas Regional Initiative NW Short-term Capacity Project (C1) Comments by TSOs regarding different models discussed.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
Erik Sleutjes (Ofgem) GRI NW Government Meeting The Hague, 6 May 2010 Pilot framework guideline on gas balancing – ERGEG initial steps.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
NW GRI Investment Project Virtual Test Case Adam Cooper - EFET.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
All Island Single Electricity Market IWFA Update Laura Brien
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Initial ideas regarding pre-comitology meetings RCC The Hague, 5 July 2010 Programme Office GRI NW.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
European Developments Transmission Workgroup 3 rd May 2012.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Gas Regional Initiative North West Region - Short Term Capacity RCC Meeting Den Haag – 21 September 2010.
Congestion Management
Conclusions STC Core Group 8 September 2009 The Hague
New transparency guidelines
Strategic rationale According to Roadmap project shall focus on short-tem capacity issues: maximising use of existing capacity including reserve capacity.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative
Gas balancing – where next
Gas Regional Investment Plan project
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Presentation transcript:

Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010

2 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010  According to Roadmap project shall focus on short-tem capacity issues: -maximising use of existing capacity including reserve capacity through examination of how unused capacity could be released day-ahead and -investigating into how TSOs could be incentivised  Aim: make available firm primary capacity on day-ahead market Strategic rationale

3 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010 Day-Ahead Oversubscription  TSO has good knowledge on how much capacity will be used  TSO slightly oversubscribes the system‘s capacity  In (rare) cases where flows exceed the system‘s capability TSO buys back the usage rights from shippers Short-Term Calculation  TSOs calculate available firm capacity based on long term assumptions and scenarios  In the period running up to real time TSOs have more certainty about network conditions, e.g.  Can release additional firm capacity to the market day-ahead Discussed Models

4 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010 Incentivisation  TSOs: Incentive mechanism that compensates the additional financial risks coming along with providing additional capacity is needed  If not fulfilled, how does it impact the project?  The alternative of an ex-ante cost recovery guarantee requires a high level of detailing (no quick-win)  An agreed methodology will probably prove to be sub-optimal for each IP  No incentive for the TSO to do more than absolutely required/covered  TSOs see incentive mechanism as prerequisite for further steps

5 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010  France: Regulatory system incorporates an incentive to oversell capacity as long as regulator does not increase its sales forecast each year  Belgium: Regulatory system not specific to additional revenues generated from extra sales of capacity. No ex-ante guarantee that TSO would be allowed to retain extra revenues  Germany: Additional costs for establishing short-term capacity market are not covered in revenue cap and will in practice lead to lower earnings of the TSO  Netherlands: revenues resulting from capacity sold above this estimated quantity can be kept by the TSO Status Quo – according to TSOs

6 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010  European Process coincides with GRI NW STC process  Framework Guidelines Capacity Allocation contain proposals to strengthen short term markets  Aims at harmonised standards on certain capacity related issues  Potentially impacts STC pilot  Finalised Document to be expected in May 2010  ENTSOG to draft network codes  Incentivisation is closely linked to national regulators practices  National processes e.g. in Germany Status Quo – The Wider Picture

7 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010  April to August 2010  Workshop on incentives for TSOs to maximise available short-term capacity  September 2010  Re-evaluate and if needed adapt project in light of recent developments on European and national levels  October 2010  Core Group to propose detailed project  Update Programme Board  November 2010  Stakeholder Workshop  Draft implementation plan to be prepared by Core Group Proposed Way Forward

8 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010 Thank You!