Historical Year for 2026 Common Case Load/Hydro/Wind/Solar Shapes TAS November 2015 Meeting Tom Miller- TAS Vice Chair W ESTERN E LECTRICITY C OORDINATING.

Slides:



Advertisements
Similar presentations
1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
Advertisements

Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Study Results February 10, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
RPCG – CCTA Process Vijay Satyal & Colby Johnson Reliability Planning & System Adequacy April 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Case Report PC 10 High Carbon Price PC 11 Low Carbon Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Energy-Water-Climate Change Scenario Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Study Case Results PC06 High NG Price PC07 Low NG Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Effect of Thermal Generation Replacement on System Frequency Response Enoch Davies, PE Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Creating Profiles Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
ELECTRICITY SOURCES Twenty five percent of the state’s electricity comes from out-of-state generation.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Study Program Comparison Protocol vs Proposal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Update: 4.9 Work Team on Committee Role, Scope and Structure Melanie Frye Vice President, Reliability Planning and Performance Analysis W ESTERN E LECTRICITY.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Environmental and Cultural Data Use in Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC 401K Plan Annual Review Jim Robb, CEO and 401K Trustee W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAS – Review Load and Hydro Shapes for use in TEPPC 2026 Common Case Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
TAS Quarterly Meeting Further Investigation of Load and Energy Shapes for use in the 2026 Common Case November 4-5, Tom Miller- TAS Vice Chair.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
TEPPC 2015 Work Plan Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MWG Webinar January 25, 2016 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Use of EDWG Data by the LTPT WECC Staff January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Clean Power Plan & Reliability – An Update TEPPC Winter 2016 Meeting February 3 rd – 4 th 2016 Vijay Satyal PhD, Sr. Policy Analyst W ESTERN E LECTRICITY.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAS & TEPPC Update CCTA Assumptions Vijay Satyal - RPCG Liaison, Sr. Policy Analyst & Colby Johnson - Associate Engineer, SAP W ESTERN E LECTRICITY.
2026 Common Case Development Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee ISAS Report Pete Heiman April 20, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
DWG Wind Profile Review November 11, 2014 Dan Beckstead Associate Staff Engineer.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Economic Planning Study June 23, In this presentation  Major changes from last meeting  Results: 2010, 2014, 2019  Finish analyst  Next steps.
TEPPC Review Task Force Proposed Process W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
TAS Follow-up Webinar Historical Year Energy Shape Compromise for 2026 Common Case December 14, 2015 Jim Filippi- TAS Chair Tom Miller- TAS Vice Chair.
TEPPC Review Task Force Meeting February 4-5, 2016
MWG Recommended Hydro Improvement March 7, 2017
2018 VELCO IRP Forecast Preliminary results
Recommended Hydro Improvement April 11, 2017
Outline Modeling Issue 2017 Modeling Goals
MWG Recommended Hydro Improvement March 14, 2017
MWG Recommended Hydro Improvement March 7, 2017
Recommended Hydro Improvement April 11, 2017
Study Results Drought Scenario Study
Technical Committee Meeting March 18, 2016
Presentation transcript:

Historical Year for 2026 Common Case Load/Hydro/Wind/Solar Shapes TAS November 2015 Meeting Tom Miller- TAS Vice Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Discussion 1.WECC Anti Trust Statement 2.Meeting Background and Objectives 3.Use of Load Shapes in Gridview- WECC Staff 4.California Load Attributes – Developing Criteria for Load Shapes – Peak Load Months and Heating/Cooling Days 5.Revisit 2008 vs 2009 Hydro – CA Concerns about 2008 Hydro – Northwest Load and Wind (April) 6.The Great Recession 7.Alternative Proposal (Vote at TAS Quarterly meeting) 8.Other Lessons learned and Next Steps 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Background and Objectives Background – TAS Vote - Michael Bailey – Concerns Raised – Further Investigation Meeting Objectives – Overview of further investigation of Load shapes – Present and discuss rationale for alternative proposal- VOTE – Lessons Learned and next steps Meeting Success: – Provide stakeholders additional information and opportunity to discuss attributes of candidate energy shape years – Provide alternative proposal to be considered with original proposal for 2026 Common Case (Note: Vote will be done at TAS Quarterly Meeting in November) 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Use of Load Shapes- Gridview Over view of Gridview Modeling Options for use of load shapes – Monthly Peak MW and Energy – Annual Peak and Energy (Uses 8760 profile)logic Issue: Need to review reported LRS data too! 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC Staff to add slides for discussion

Load Criteria Development 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL What Criteria do Planning Regions Plan to? Summer Winter Peak Mw Energy Load-net wind-solar Peaks Table shows assessment of Annual Peak Month Non-Typical Peak Month Typical Peak Month

Load Criteria Development 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL 2008 California Major Load Centers June Peak not typical Conclusion: 2009 is a better representative year over 2008 regarding typical system peak months

CA Annual Cooling Days 7 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Conclusion: both 2008 and 2009 are good candidate years regarding CA CDDs

Typical Northwest Wind and Loads 8 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Wind: Northwest (WA+OR) WECC-Wide Stress: In California-Southwest, the system is more prone to over- generation (with high solar and low load in April). In Northwest, it is also more likely to have over-generation (with higher wind) in April than in June.

NW Hydro Data 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Concerns Non-typical NW Hydro Monthly Shape April 2008: Below typical NW Hydro may under-state over- generation issues in the Northwest (Wind) and Southwest/California Regions (Low Load/High Solar) June 2009: late runoff and above average my “stress” flows across COI and CA 500/230kv Backbone Conclusion: 2009 better representative of typical year that has benefits for all regions to assess April stress

The Great Recession 10 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Conclusion: 2009 loads more typical and reflect rebound from 2008 as peak of economic down-turn

Pros and Cons 11 W ESTERN E LECTRICITY C OORDINATING C OUNCIL PROS Annual Hydro Energy Good (Pro) CA Load Peak MonthPoor (Con) CA June Peak non-typical Good (Pro) Hydro Monthly VariationsDeviations from typical (Con) In line with typical (Pro) April NW Hydro Lower than typical NW Hydro: under represents Over-Gen (Con) Favorable for Assessing typical Over-Gen WECC- wide (Pro) June NW Hydro Non Typical (High) “Stress” on COI Favorable (Pro) CA Cooling Degree Days Good (Pro) June not typical Good (Pro) “Stress” sensitivities Good (Con) Poor (Pro) Updated NREL Wind SolarAvailable (Pro) Great Recession Peak of Economic Down-turn (Con) Recovery towards economic growth (Pro)

Proposals Original Proposal for TAS Vote: 2008 Coincident Load-Wind-Solar-Hydro New- Alternative Proposal: 2009 Coincident Load-Wind-Solar-Hydro 12 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Lessons Learned Gridview modeling of monthly peak-MW and energy helps mitigates concern over 2008 CA June peak Issues Need to develop regional criteria for load shapes Reported load forecasts need to be vetted for use in TEPPC data-set – Implied Load Modifiers: EE, BTM-PV – Incremental Modeling: EE, BTMPV, Other – Understand underlying assumptions: economic, temperature (1 in 2) adjusted Need for WECC Staff time for load assessments 13 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

NEXT Steps 2026 Common Case Energy Shape Implementation Smart Goals discussion at Upcoming TAS Quarterly Meeting Discussion – Smart Goal: Measurable, Attainable, Relevant, Time-bound): Understanding WECC Load Forecast Data Investigate 2026 Common Case Load Forecasts Shapes TAS Process Improvements for Load Assessments 14 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Questions or Comments 15 W ESTERN E LECTRICITY C OORDINATING C OUNCIL