By: Texas RE Enforcement April 25, 2013 Guidance on Requirements for PRC-005 Mitigation Plans Talk with Texas RE April 25, 2013.

Slides:



Advertisements
Similar presentations
The Regulatory Perspective
Advertisements

With thanks to Dr J Foulkes Wessex Deanery. Headline Changes Updated look and feel New functionality Educational Supervisors Review(ESR) Revalidation.
Keshav Sarin Manager, Compliance Risk Analysis
Creating and Submitting a Necessary Wayleave Application
SC 18 Ad Hoc Task Group API Staff Issues Ed Durante, Chair.
Section 1: Process to create EAS Interface File  DoD Batch and Timecard Status Report  DoD Employee Missing Payroll Data Report  Distribute Labor Cost.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Online Option Choice 2013 Process and system overview Curriculum and Timetabling Team April 2013.
UTHSC IRB Donna Hollaway, RN, CCRC 11/30/2011 Authority to Audit 45 CFR (e) An IRB shall conduct continuing review of research covered by this.
Health Insurance Portability Accountability Act of 1996 HIPAA for Researchers: IRB Related Issues HSC USC IRB.
This tutorial will take approximately 15 minutes. Click here to advance. Click here to go back.
How to…….  ICID review is moving from paper-based to electronic  Some elements of the review remain as they were, ie:  You will edit your document,
3-1 Chapter 3 Data and Knowledge Management
Online Funding Application Guidance Our online application process is fast and efficient and it means you have peace of mind financially before embarking.
1.  Incident reports should be written only when you are sure that a persons rights have been violated. True False  Full names of consumers should never.
Information for students Welcome to the S 3 P system. Login to the system by entering your User ID and password. The User ID is the same as your normal.
E | W | E | W | NHS e-Referral Service Referring Roles Issued: 3 June.
On-Line Database Placement Application Tutorial. How to Change Your Information On York’s System.
HIPAA COMPLIANCE IN YOUR PRACTICE MARIBEL VALENTIN, ESQUIRE.
Invoices On – Line Registration Instructions for Vendors.
Health screening & Par Q
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
Quick Reference Guide Welcome TEST USER Version_NSU_ HELP RETIREMENT MANAGER DEMO FEEDBACK.
Compliance Monitoring Audit Tutorial Version 1.0 April 2013.
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
Creating a Parent Portal Account in PowerSchool 2015.
Departmental Inventory Portal (FRMS) Inventory Services University of Texas at Austin.
How to use TREx 1 Disclaimer: TREx under development, minor modifications may occur pending final release. Prepared for Education Service Center TREx Training.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
Step-by-Step Guide to Completing Biennial Report Reviews in SharePoint Accreditation Department June 2008.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
 So far in ICT we’ve covered how data is entered into computers (data capture) and how it’s checked (validation and verification).  In this section.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 6-1 Chapter Six Internal Control in a Financial Statement Audit.
Registration Solutions for your Event Management.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction Special Education Self Review (SESR) Activity Three: Corrective.
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
Public Libraries Survey Data File Overview. What We’ll Talk About PLS: Public Libraries Survey State level data Public library data (Administrative Entities)
Public Libraries Survey Data File Overview. 2 What We’ll Talk About PLS: Public Library Survey State level data Public library data (Administrative Entities)
Dennis Glass Compliance Analyst III January 21, 2016 PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Talk with.
Session 6: Data Flow, Data Management, and Data Quality.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Plans of Correction (PoC) Donna Tiberi, RN Standards Interpretation p: e: 1.
E | W | E | W | NHS e-Referral Service Referring Roles Issued: 27 th.
Online Funding Application Guidance Our online application process is fast and efficient and it means you have peace of mind financially before embarking.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
How to Guide: Performance Feedbacks Learn how to complete, upload and publish Performance Feedback forms.
Final Rule for Sanitary Transportation. Background Proposed Rule: February 5, 2014 Public Comments: More than 200 Final Rule: On Display April 5, 2016.
Low Cost/Low Risk Improvements
Immigration – Common Errors and How To Conduct An Internal I-9 Audit
Standard Operating Procedure
Investigator of Record – Definition
CIIMS Proposal for TOP-003 Approach
Competence Pack Guide to Assessment.
GO! with Microsoft Access 2016
PRC Implementation Plan and Summary of Devices
Flooding Walkdown Guidance
Final Order The Final Order is a very important section that must be completed. In this area, you will put the issuance date, and the requirements that.
Investigator of Record – Definition
Investigator of Record – Definition
Competence Pack Guide to Assessment.
Trainee ePortfolio Revision 2013
Presentation transcript:

By: Texas RE Enforcement April 25, 2013 Guidance on Requirements for PRC-005 Mitigation Plans Talk with Texas RE April 25, 2013

2 PRC-005 Mitigation Plans ●For the purposes of this presentation, hypothetical entity “ABC” is required to provide a Mitigation Plan. ●Once ABC’s violation has been entered in webCDMS, ABC will be able to enter a Mitigation Plan. ●ABC should make sure to address each step that is covered on the following slides. These slides refer to the “Plan Details” and “Activities and Timeline” fields in the Mitigation Plan. Talk with Texas RE April 25, 2013

3 Step 1: Identify the Issue and Mitigation ●ABC should identify the issue. ●Identify how ABC mitigated the issue. ●Evidence is required. ABC should provide:  Maintenance Log  Testing Records ●Upload the supporting evidence into the Entity Document section of the Mitigation Plan. Talk with Texas RE April 25, 2013

4 Step 2: Comprehensive Survey ●Perform a comprehensive survey to ensure all the elements subject to PRC-005 are included and none are missing (generation and transmission, as applicable).  Evidence: Provide a spreadsheet listing all elements’ maintenance and testing history. Include last two maintenance and testing dates. For station batteries provide last two maintenance and testing dates of each type of testing. Upload the supporting evidence into the Entity Document section of the Mitigation Plan.  Spreadsheet: If the prior maintenance and testing dates are unknown, enter your registration date in the “Date: Maintenance and testing performed (prior to the possible violation period)” column. Enter comments if necessary. Note: Do not provide any supporting maintenance and testing records for this milestone. Provide the spreadsheet or screen display of the database containing devices and maintenance/test dates. Talk with Texas RE April 25, 2013

5 Step 3: Questionnaire ●Complete the questionnaire and the embedded spreadsheet (available on Texas RE’s website).questionnaire  This questionnaire determines the potential risk and severity due to the violation.  Upload the completed questionnaire and spreadsheet into the Entity Document Mitigation Plan section. ●Complete the section of the questionnaire relevant to violation (i.e., do not complete PRC R2). ●Each piece of equipment subject to PRC R2 that was missed must be listed. If you missed any equipment multiple times, each instance of non-compliance should be listed separately.  For example, if battery testing was missed in 2nd quarter of 2010 and again in 3rd quarter of 2012, two line items should appear to address these issues. Talk with Texas RE April 25, 2013

6 Internal Control ●Evidence is required. ●ABC should describe its internal control process:  ABC’s monitoring process/plan to prevent or minimize the probability of further PRC R2 violations. Talk with Texas RE April 25, 2013

7 Mitigation Plan Validation ●Provide Data to Texas RE demonstrating completion of the mitigation plan  Transmission: Texas RE staff will make random equipment selections and request maintenance and testing records for such selections. All the issues need to be resolved before closing the mitigation plan. The proposed completion of this milestone must allow an additional 4 to 6 weeks.  Generation: Texas RE staff will select random generators and associated substations. Within that subset, Texas RE will again select random equipment for verification. Texas RE staff will then ask for maintenance and testing records of relays and associated equipment within the protection system.  Include evidence of continuous monitoring, if applicable. This would include items such as a screen display. Talk with Texas RE April 25, 2013