Improvements of the ALFA and TOTEM Roman Pot Movement System in TS1 Mario Deile with input from P. Fassnacht, S. Jakobsen, J. Kaspar, S. Ravat for the.

Slides:



Advertisements
Similar presentations
Windows XP System Restore July 22 nd, 2006 CAEUG Meeting.
Advertisements

PLC Applications[ATE-1212] Module-1
A1 Acoustic Rhinometer The following presentation gives an overview of the main functions of the A1Acoustic Rhinometer, it’s accessories and normal operational.
PLC OPERATION & PROGRAMMING Dr. ONUR TOKER. What is a PLC ? PLC is a computer system controlling a process. inputs - the keyboard is analogous to a proximity.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 12: Managing and Implementing Backups and Disaster Recovery.
Failure mode impact studies and LV system commissioning tests
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 12: Managing and Implementing Backups and Disaster Recovery.
INCIDENT MANAGEMENT (SERVICE REQUESTS) WebDesk Training.
Drivers Station 2010 Joe Ross Team /12/2009.
Driver Station MVRT 2009 – 2010 Season. Add information Breadboard Classmate PC USB Hub Joysticks Stop Button.
Study Island Teacher Demo
Booting in Windows XP Presented and Designed By: Luke Ladd.
Hands-On Microsoft Windows Server 2003 Administration Chapter 2 Managing Windows Server 2003 Hardware and Software.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 12: Managing and Implementing Backups and Disaster Recovery.
Therac 25 Nancy Leveson: Medical Devices: The Therac-25 (updated version of IEEE Computer article)
Programming PLCs using LADDER Logic
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
MagicInfo Pro Scheduler Now that a template has been created from content imported into the Library, the user is ready to begin scheduling content to.
Running at Low  * and High Lumi Test insertion on 13 October 2011:
Status of the Roman Pot Movement System and the Interlocks Mario Deile
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Session Objectives How to Debug PTF test case/Script Session-6 DebuggingSlide 2.
Version How to Use Packet Tracer MarinaMD.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
A MOVEMENT CONTROL SYSTEM FOR ROMAN POTS AT THE LHC Ben Farnham, Sylvain Ravat, Federico Ravotti, Mario Deile, Patrick Fassnacht, Odd Oyvind Andreassen,
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
Instructor Suleiman Muhammad (mcpn,mncs)
Eva Barbara Holzer MPP, CERN Eva Barbara Holzer 1 Approval procedure for master threshold changes.
Chamber Monitor Panel Emiliano Furfaro 16 october 2012.
P. 1Mario Deile – Meeting on Experiment Protection from Beam Failures Protecting TOTEM Mario Deile PH-TOT
Chapter 3 Device Monitor Screen Otasuke GP-EX! Chapter 3 Device Monitor Screen Chapter 3 Device Monitor Screen.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
GMT Config. for the experiments: Summary of received requests / LEADE Meeting 4 th Feb.08 / B.P. 1 Summary of received requests for Safe Machine Parameters.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
TOTEM Roman Pots MPP Meeting 19/06/2015 MPP Meeting 19/06/ Sylvain Ravat1.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
 Follow the steps in order to solve the sync issue with the best fitness trackers;best fitness trackers  1. Reboot your Fitness Tracker and the device.
© ExplorNet’s Centers for Quality Teaching and Learning 1 Explain the importance of routine backup and maintenance. Objective Course Weight 4%
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Copyright © 2007 by Pearson Education 1 UNIT 6A COMBINATIONAL CIRCUIT DESIGN WITH VHDL by Gregory L. Moss Click hyperlink below to select: Tutorial for.
Proctor Caching and System Check September 4, 2014 Becky Hoeft Conference Number: (877) Conference Pin:
Copyright Pte Ltd Installing iZeno SMS Module Version 1 for SugarCRM 6 updated on 25 Nov 2011 Benny Ng Director Business Development.
for-windows-10
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
Software Version: DSS ver up85 Presentation updated: September 2011 Step-by-Step Guide to Asynchronous Data (File) Replication (File Based) within.
Step-by-Step Guide to Asynchronous Data (File) Replication (File Based) over a WAN Supported by Open-E ® DSS™ Software Version: DSS ver up85 Presentation.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group 25FEB2016.
3.14 Microscan QX-870 Scanner Configuration
ATLAS-AFP interlock validation
Study Island Teacher Training
Saturday 30th June - Sunday: Rocky !
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Tuesday Loss maps in the night:
90m "proper" VdM scans in the 90m/10m optics
Beam Interlocks for Detectors and Movable Devices
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Fri :52 Stable beams fill #2536
Presentation transcript:

Improvements of the ALFA and TOTEM Roman Pot Movement System in TS1 Mario Deile with input from P. Fassnacht, S. Jakobsen, J. Kaspar, S. Ravat for the TOTEM and ALFA Teams 27 April 2012

The Problem with Very Small Steps Despite all the tests after the winter activities, one detail was missed: Movement steps < 30  m not correctly executed [although steps  30  m perfect within system precision of 5  m] Requested: sequence of 20  m movements 20  m Settings: Motor LVDT System followed the settings on average, but individual steps were wrong. Mario Deile – p. 2

Explanation Mario Deile – p. 3

Explanation Mario Deile – p. 4

Explanation Mario Deile – p. 5

System Test after Error Correction TOTEM: See LHC COLL elog: For all 24 RPs the following movements were executed (minimum set): Big step towards the beam (typically 40 mm to 5 mm): arrival precision < 5  m Series of incremental movements (mostly manual increments, some BBA tests): * 200  m * 100  m * 50  m * 30  m * 20  m * 10  m * some tests with 5  m = system precision limit  motor step size  rounding effects  No malfunctions observed no deviations > 5  m At the end: Re-verification of position interlock functionality by dumping on the inner limit for 6 RPs (1 Top, 1 Bottom, 1 Horizontal on each beam) Mario Deile – p. 6

TOTEM: Test Examples 30  m, 50  m, 100  m, 200  m 5 x 30  m 4 x 50  m 2 x 100  m 2 x 200  m Mario Deile – p. 7

TOTEM: Test Examples 20  m Motor Setting Mario Deile – p. 8

TOTEM: Test Examples Motor Setting 10  m Mario Deile – p. 9

ALFA Test Example 24/4/2012, 12:04 - Test repeatability of small steps: example 10  m

Mario Deile – p. 11 Commissioning of the LVDT Bypass Boxes One key per experiment (ALFA, TOTEM) to - bypass LVDT input to interlock - and disable all pots at the same time. Key to be kept in the CCC. Vertical key position : - LVDT Position interlock active, - RP motors can be enabled. Diagonal key position : - LVDT Position interlock bypassed, - RP motor power disabled by hardware link Circuit diagrams in EDMS by Xavier Pons. ALFA and TOTEM: boxes now operational. Tests done on 25 April. TOTEM: LHC COLL logbook: ab-dep-op-elogbook/elogbook/secure/eLogbook.php?shiftId= EDMS (interlock test report) updated ! ALFA: LHC OP logbook: ab-dep-op-elogbook/elogbook/secure/eLogbook.php?shiftId= TOTEM LVDT Bypass Box

ALFA. Before technical stop: 4 individual keys for LVDT comparison override. ALFA. Now: 1 key for override all LVDT comparison. The key also cut the power to the motors. ALFA LVDT Bypass Box Modification

LVDT Bypass Box: Test of 4 Scenarios Test 1 (Failure during TOTEM / ALFA Run) 1)RPs are near the beam. 2)Simulate failure: Switch PXI crate off  dump, RP extraction 3)Turn BYPASS on  USER_PERMIT back, RP motors disabled. [LHC can operate without RPs while repairs are done] 4)Restart PXI and its processes. Verify that no RP movement is possible. 5)Turn BYPASS off and re-enable the motors. 6)Check normal functionality of RP movements and interlocks Mario Deile – p. 13

ALFA. Bypass key test. Wednesday 25th TEST 1, sequence :37 ALL pots at 20mm (upper) and -35mm (lower) - 9:21 switch off PXI. Dump and extraction. User_Permit gone

ALFA. Bypass key test. Wednesday 25th TEST 1, sequence 3. - ALFA BYPASS key turned at 9:48. USER_Permit back. No changes in the Application window (no traces). Trying to move triggers message: "no acknowledgement from PXI".

LVDT Bypass Box: Test of 4 Scenarios Test 1 (Failure during TOTEM / ALFA Run) 1)RPs are near the beam. 2)Simulate failure: Switch PXI crate off  dump, RP extraction 3)Turn BYPASS on  USER_PERMIT back, RP motors disabled. [LHC can operate without RPs while repairs are done] 4)Restart PXI and its processes. Verify that no RP movement is possible. 5)Turn BYPASS off and re-enable the motors. 6)Check normal functionality of RP movements and interlocks Test 2 (“The Forbidden Use Case”) [tested only for completeness] 1)RPs are near the beam. [Imagine PXI is stuck and needs reboot] 2)Turn BYPASS on 3)Reboot PXI  no dump Verify that no RP movement is possible 4)Turn BYPASS off and re-enable the RP motors. 5)Check normal RP functionality Mario Deile – p. 16

Test 2, step1. All pots in position Test 2, step2. Bypass ON. Retraction Bypass Box Test 2: ALFA

LVDT Bypass Box: Test of 4 Scenarios Test 3 (“Holiday Mode”) 1)All pots are in garage (at HOME switch) 2)Turn BYPASS on Verify that no RP movement is possible 3)Turn BYPASS off and re-enable the RP motors 4)Check normal RP functionality Test 4 (Failure while TOTEM/ALFA in Standby – “When the CCC calls in the night…”) 1)All pots are in garage (at HOME switch) 2)Simulate failure: Switch PXI crate off  dump, RP extraction 3)Turn BYPASS on  USER_PERMIT back, RP motors disabled [LHC can operate without RPs while repairs are done] 4)Restart PXI and its processes Verify that no RP movement is possible 5)Turn BYPASS off and re-enable the RP motors 6)Check normal RP functionality Mario Deile – p. 18

Done (thanks to Gianluca and Stefano): Fixed the broken STOP button in the BBA version of the RP-collimator application Configured the button “Out Switches” to send the pots to the OUT Stopper positions Included BBA version in the LHC menu tree (no more confusion about versions and typing explicit web URLs) Tested driving pre-defined open “parking” limits with EquipState (easier and less error prone) Medium Term Wishes: Display new inner limits as curves Add the BBA tab to the default version (reachable via the LHC menu) Long Term Wishes: Naming conventions for existing button display: UP-IN UP-OUT  IN-Stopper HOME Add another button for the real OUT Stopper Display difference between motor and LVDT (as a number) Human-understandable error messages (presently “java …” over ~20 lines) Improvements of the CCC Application Mario Deile – p. 19

Mario Deile – p. 20 Backup

Mario Deile – p. 21 Motor Control GMT (SMP) CIBU 1 (double) ALL_RP_HOME_B1 DEVICE_ALLOWED USER_PERMIT1 (Beam 2) CIBF 1 INJECTION_PERMIT (Beam 1) CIBF 2 TOTEM Operator / ATLAS Slimos OVERRIDE1 OR STABLE_BEAMS NOT_BACK_HOME IN MOTOR CONTROL RACK x 24 all machine flags TOTEM / ALFA INTERLOCK LOGIC OR AND Home Switch B1(01) AND RP_HOME_B1(01) RP_HOME_B1(12) x 12 LVDT_B1(01) FESA compare Pos_B1(01) Pos_B1(12) x 12 Limits Home Switch B1(12) LVDT_B1(12) x 12 compare x 12 AND all machine flags ALL_LVDT_OK_B1 Home Switch B2(12) AND RP_HOME_B2(12) RP_HOME_B2(01) x 12 LVDT_B2(12) compare Pos_B2(12) Pos_B2(01) Home Switch B2(01) LVDT_B2(01) x 12 compare x 12 AND x 12 ALL_RP_HOME_B2 OVERRIDE1 AND OR ALL_LVDT_OK_B2 AND INJECTION_PERMIT_KEY (TOTEM only) INJECTION_PERMIT_KEY OR USER_PERMIT1 (Beam 1) INJECTION_PERMIT (Beam 2) DCS AND CMS S1E08 / ATLAS USA15 Y A1 LVDT Bypass Box Bypass Key Interlock Logic 2012

Examples for 5  m Movements Very good case: initial deviation ~ 0 Worse case: initial deviation ~ 5  m  Rounding produces steps of 0 or 10  m Setting Motor After 21 steps: Double step for rounding compensation Mario Deile – p. 22