RF and Transverse Dampers Current Systems Wolfgang Hofle W. Hofle - RF+Dampers - R2E and Availability Workshop 14-17 OCtober 2014 1 Acknowledgements: RF.

Slides:



Advertisements
Similar presentations
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Advertisements

A longitudinal damper for the PS (preliminary ideas) 24 April 20121M. Paoluzzi BE/RF.
Introduction to the High Bandwidth Transverse Feedback W. Hofle on behalf of HBTFB Team Proposed New System vs. Existing Feedback System Brief History.
RF Commitments and Major Issues E. Ciapala Input from: P. Baudrenghien, O. Brunner, T. Bohl, A. Butterworth, W. Höfle, T. Linnecar, E. Shaposhnikova, J.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
RF Systems Commissioning O. Brunner AB/RF on behalf of the RF group (LTC – March ’08) Many thanks to L. Arnaudon, Ph. Baudrenghien, W. Hofle, D. Valuch,
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
 Installation: equipment, waveguides, water cooling, local cabling  Upgrade of LEP equipment  Contract follow up: new klystrons, spare circulators.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Collected by E. Jensen, BE-RF 1 ATOP days RF limitations.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
L. Arnaudon BE/RF/CS. Outline  RF systems description  Software environment  RF specialist requirements  RADE tools in use  ACS application  Low.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
Tunnel Gallery Girders x ADC’s HV Power supply Rack channels digitizer VME module (SIS3300), 12 bits 96.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
D. Valuch, N. Schwerg, O. Brunner (CERN)
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Brief summary of Finemet Review 9-10 September S. Gilardoni.
The LHC RF Power Systems Skip the intro… CWRF08 workshop - March'08 1 Presented by : Luca Arnaudon Slides by : Olivier Brunner & Luca Arnaudon Important.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
Status of the single-bunch feedback system for the SPS/LHC M. Pivi C. Rivetta, J. Cesaratto, J. Fox, O. Turgut, S. Uemuda, W. Hofle, U. Wehrle, K. Li,
ELENA installation progress F. Butin / ELENA collaboration.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Report Technical Director Storage-Ring-Installation Completed
RF acceleration and transverse damper systems
System layout in PS ring and possible evolution
LHC-RF activities in LHC PT 4 TS2 YETS LS2
MPE-PE Section Meeting
AD consolidation activities in LS2
on behalf of the RF group
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
10 MHz amplifier status G. Favia
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Linac4 RF System Operation for the Reliability Run in 2017
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Transverse Feedback System (LHC Damper)
Radiation Working Group RADWG
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

RF and Transverse Dampers Current Systems Wolfgang Hofle W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Acknowledgements: RF group, Section Leaders and Deputies Special Thanks to L. Arnaudon, P. Baudrenghien, A. Blas, T. Bohl, A. Butterworth, H. Damerau, F. Gerigk, P. Maesen, E. Montesinos, M. Paoluzzi, C. Rossi, D. Valuch, U. Wehrle Disclaimer: 15 minutes to cover … 2035

W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Accelerators and Projects involving RF (1) Types of electronics: PLC, analogue (A), digital (D), RF power (P)

W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Accelerators and Projects involving RF (2) Types of electronics: PLC, analogue (A), digital (D), RF power (P)

RF waveguide Arc Detector (1) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober D. Valuch et al. This is also a Technology Transfer Project protects  transmission line system  sensitive RF elements (ceramics, ferrites)  based on optical detection currently deployed system in LHC  optical fibers suffer radiation damage  interlock logic to mitigate spurious triggers put in place, no more problem in 2012 run new system, being deployed in LINAC4 gradually to be migrated to LHC  no fibers  four redundant detectors, voting logic  “sun glasses” to blind-out showers  future rad testing envisaged to level expected for HiLumi  needs to be in tunnel  alternative: acoustic detector current new spurious triggers rad damage

RF waveguide Arc Detector (2) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober detector box logic box  new arc detector deployed in LINAC4  reliability testing in LINAC4  many outside labs expressed interest  manufactured in industry under license  future radiation testing envisaged  need estimate of dose rate in tunnel for HiLumi era close to cavities

 “Finemet” is a magnetic alloy  high permeability  potential to replace ferrite based cavity systems in injectors by wideband systems without need for a tuner LIU project proposes:  a finemet based system for PSB (replacing the C02 and C04 RF tetrode systems)  a wideband long. damper for PS Solid state amplifiers for Finemet Cavities PSB RF and PS long. damper (1) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober „Finemet Review“ 9-10 September 2014 (LIU)  series of ceramic gaps  powered by individual amplifiers  modular design  fast feedback requires proximity to cavity and beam  electronics exposed to radiation M. Paoluzzi et al.

Solid state amplifiers for Finemet Cavities PSB RF and PS long. damper (2) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober „Finemet Review“ 9-10 September 2014 (LIU)  design of amplifier in house at CERN  based on experience with transistor in similar applications  drift of bias characteristics compensated by circuit to mitigate ageing by radiation  radiation tests at JPARC (Japan) and Fraunhofer Institut in Germany  solution with Shielding has been studied and deployed for SS02 in PS  tube amplifier would be alternative … but design with many gaps adapted to solid state amplifiers  tubes used in LEIR and JPARC (Japan)  collaboration with JPARC for solid state system integrating effect of radiation compensating circuit being tested shielding PS SS02 for long. damper cavity amplifiers

Solid state amplifiers for PS-RF (40 MHz & 80 MHz) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Annexes for electronics And feedback amplifiers

Solid state amplifiers for PS-RF (40 MHz & 80 MHz) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Doses in Gy

Solid state amplifiers for PS-RF (40 MHz & 80 MHz) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Shielding put in place (LS1)

Pick-up electronics in tunnel (PSB, PS, SPS LSS3) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober PSB (RF resp.) head amplifiers transverse feedback RF loops regular maintenance PS (BI resp.) head amplifiers transverse feedback RF loops SPS LSS3 Beam observation equipment, RF pick-ups if re-design more rad. monitoring may be needed to get levels for specifications Example: SPS pit equipped with Beam Observation equipment in SPS LSS3 (U. Wehrle)

Pick-up electronics in tunnel (SPS Damper LSS2) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober electro-static PUs with high impedance preamplifiers in tunnel LS1: electronics moved from 208, 209, 210, 211 to newly installed PUs at 202, 204, 205, 207 all checked and repaired (R. Louwerse/G. Kotzian) spare electronics remains in tunnel (hot 213, 214, 215 pit equipped with damper electronics for fixed target beam, very reliable & robust (20+ years) (future renovation envisaged, outside LIU scope) 100 MHz bandwidth, discrete transistors power supplies need regular changing rad monitoring radiation before redesign ?

High bandwidth Feedback Solid State Amplifiers in LSS3 of SPS (1) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober  R&D project to demonstrate damping of headtail motion in SPS (e.g. ecloud)  funded by LARP and LIU SPS  decision in 2016 on full deployment  solid state amplifiers 4x100 W installed since 2011 under QD319  driving BPW pick-up as kicker  radiation damage to power supply mitigated by change of power supply  powering of amplifiers only during MDs tunnel

High bandwidth Feedback Solid State Amplifiers in LSS3 of SPS (2) W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober  new amplifiers for next stage  jointly with SLAC selected amplifiers from R&K Japan (4x200 W)  Installation in tunnel to power new kickers  radiation measurements ongoing to decide on installation location  later stage (>2016) if full system deployment  more amplifiers  need for proper radiation measurements, testing, calculations, started existing amplifiers (QD319) new stripline kickers in 321

LHC: Summary of equipment underground W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober  Tunnel:  Cavities with arc detectors  ADT tetrode amplifiers (considered robust)  APW pick-ups (re-design due to losses for HighLumi ?)  Cryo side of UX45:  beam observation equipment for long. plane  digitizers, VME hardware, timing, fiber optic links  relocation to ex-LEP klystron gallery for HiLumi era  Cavern side of UX45 considered ok:  Klystron related drive and controls  Faraday Cages with fast feedbacks and cavity tuning  ACS cavity controls  ADT drive and control layout is result of radiation simulations, e.g. LHC Project Note 342 all radiation issues needs re-consideration for HighLumi era measurements also would be highly appreciated, deploy in EYETS ?

LHC point 4 – UX45 cavern W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Radiation sources: X-rays from cavity conditioning Beam-gas interaction chosen location inside Faraday cages rack location Beam observation relocation for HighLumi 24 m 5 m two shielding walls + chicanes Klystron related Faraday Cages LLRF, feedbacks ACS cavity PLCs ADT drive/PLCs APW observation arc detectors

Availability – LS1 W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober See P. Maesen at 2013 Workshop on Availability and Dependability availability of RF in run 1 not driven by R2E  part of big 4 for lost Physics hours mitigations in place and being followed-up for non-R2E ACS (400 MHz RF)  arc detectors (this was R2E)  crawbar, new development, see G. Ravida et al., IPAC’12 THPPD056  klystron filament current: bad HV cables, connector weldings  ACS Module exchange, driver amplifiers  klystrons exchanged and klystron cooling fixed ADT (transverse damper)  cabling replaced  electronics upgrade, electrical contacts  power system maintenance and fixes, air cooling improved  new water cooling interlocks  vacuum interlocks SR4 air conditioning and temperature stabilization in RF zone (roof)

Summary and final thoughts W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober most of R2E issues for RF are in injectors, need follow-up R2E in injectors not related to HighLumi LHC (radiation driven by non-LHC beams) impact of R2E on availability in injectors if failure of equipment UX45 cryo side equipment likely needs re-location for HighLumi era document evolution of radiation levels in UX45 with measurements with RF and LHC, LHC RF caused a significant number of lost hours during run 2 driving problems for LHC RF availability haven been addressed in LS1 on time horizon of 2035 ageing of material related to radiation has to be addressed through consolidation continuously availability tracking tool highly appreciated only the tedious search & elimination of root causes will increase availability worth to re-check 2012 RF faults statistics in LHC (more time needed)