Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

Will CO2 Change What We Do?
By: John T. Wenders Ama Agyeiwaa Ferkah Eco 435. INTRODUCTION  The traditional theory of peak-load pricing argues that peak period users should bear.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
1 March 2-3, 2015, Bonn Expert workshop Addressing Variable Renewables In Long‐Term Energy Planning (AVRIL) Renewables Energy Integration In Long‐Term.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
A NEW MARKET PLAYER: THE AGGREGATOR AND ITS INTERACTION WITH THE CONSUMER interaction Ramón Cerero, Iberdrola Distribución Paris, June 9th 2010 ADDRESS.
Announced Coal Unit Retirements: Effect on Regional Resource Adequacy Council Meeting January 16, 2013 Portland, Oregon Boardman Centralia 1.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Eric King/ Mary Johannis PNW Resource Adequacy Technical Committee.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Eugene Water & Electric Board. Dave Churchman Manager, Power Operations Eugene Water & Electric Board.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
2010 Work Plan Steering Committee January 29, 2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.
ISO New England State of the Markets Report May April 2002 Robert Ethier, Ph.D. Manager, Market Monitoring and Mitigation ISO New England June 26,
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Utility Responsibility to Maintaining Load Reliability Resource Adequacy Forum Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
Economic Adequacy Target Resource Adequacy Forum Steering Committee September 27, 2007.
Sustained Hydro Peaking Capacity Contract with Don Long Finalizing Phase II SOW Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23,
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
Modeling the Hydroelectric System in GENESYS Resource Adequacy Forum Technical Committee Meeting July 25, 2007.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Northwest Power and Conservation Council The Role of Electric Energy Efficiency in Reducing PNW Carbon Emissions Tom Eckman Manager, Conservation Resources.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Demand Response in the 7th Power Plan
Steering Committee Webinar March 25, 2016
Vetting the GENESYS Model
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
Economic Adequacy Standard
Pacific Northwest Resource Adequacy Assessment
Technical Committee Meeting January 27, 2012
2021 Adequacy Assessment Status Report
Capacity Analysis in the Sixth Plan
Planning Reserve Margin
Technical Committee Meeting March 18, 2016
Progress on Resource Adequacy Assessment for 2017
Resource Adequacy Steering Committee Meeting October 4, 2011
Presentation transcript:

Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007

Resource Adequacy Steering Committee Meeting 2 Objectives Show the connection between regional resource adequacy standards and utility planning. Must not “trample on the jurisdiction of states or prerogatives of individual utilities in planning and acquiring resources to meet load.”

June 27, 2007Resource Adequacy Steering Committee Meeting 3 Steering Committee’s Charge Develop a simple “rule of thumb” process to convert regional energy and capacity targets into useful values for utilities. Utilities can use this process as a general screening tool but will continue to use their own methods to develop resource plans.

June 27, 2007Resource Adequacy Steering Committee Meeting 4 Regional Energy Adequacy Standard Based on a 5% winter energy LOLP Resources = average annual load Assuming adverse hydro conditions Out-of-region market supply and In-region market supply (uncontracted IPP, non-firm hydro)

June 27, 2007Resource Adequacy Steering Committee Meeting 5 Regional Capacity Adequacy Standard Based on a 5% capacity LOLP Resources = avg peak load + reserve margin Assuming adverse hydro conditions and In-region and out-of-region market supply Reserve margin covers Operating reserves Extreme temperature events Other contingencies

June 27, 2007Resource Adequacy Steering Committee Meeting 6 Developing a Rule-of-Thumb Process Need to take into account dependence on Non-firm hydro and hydro flexibility Out-of-region winter market supply In-region market supply A utility will be energy or capacity constrained depending on its resource mix

June 27, 2007Resource Adequacy Steering Committee Meeting 7 Binding ConstraintEnergyEnergy???????Capacity Hydro/Thermal Mix 100% Hydro 100% Thermal Region Binding Constraint as a function of Resource Mix

June 27, 2007Resource Adequacy Steering Committee Meeting 8 Simple Example: 100% Thermal Utility Annual load = 1,000 MWa Peak single-hour load = 1,600 MW Winter capacity reserve = 25% or 400 MW 7% operating reserves 15% reserves for extreme temp 3% reserves for other contingencies

June 27, 2007Resource Adequacy Steering Committee Meeting 9 Simple Example: 100% Thermal Utility Capacity target = 2,000 MW Energy target = 1,000 MWa Capacity-constrained Resource planning focuses on the capacity target

June 27, 2007Resource Adequacy Steering Committee Meeting 10 Form for a “Rule-of-Thumb” Method Determine reliance on non-firm/uncommitted resources Non-firm hydro and hydro flexibility In-region and out-of-region market supplies Energy standard: Resources = annual average load Capacity standard: Resources = avg peak load + reserve margin

June 27, 2007Resource Adequacy Steering Committee Meeting 11 Non-firm/Uncommitted Regional Resources Capacity Out-of-region market 3,000 MW winter None in summer Hydro flexibility 2,000 MW winter 1,000 MW summer Uncontracted IPPs 3,000 MW winter 1,000 MW summer 1,500 MWa (from LOLP) 2,500 MWa (revised) Energy

June 27, 2007Resource Adequacy Steering Committee Meeting 12 Current Assumptions for the Regional Energy Standard Existing uncontracted in-region IPP generation (2,500 MWa, revised) Other non-firm/uncommitted resources (1,500 MWa, derived from the LOLP analysis): –Out-of-region winter market –Hydro flexibility & non-firm hydro Non-firm/uncommitted resources = 4,000 MWa or about 18% of the regional load If sum of regional firm resources ≥ 82% firm load, then enough resources to “keep lights on”

June 27, 2007Resource Adequacy Steering Committee Meeting 13 Non-firm/Uncommitted Resources for Utility Planning Utility decides on % of non-firm/uncommitted resources based on its risk mitigation strategy, or other methods In lieu of the above, a very rough estimate: In-region Market = Regional total * Load share Out-of-Region Market = Regional total * Load share Non-firm hydro = Regional total * Hydro share Utility is “physically adequate” if: Resources = annual average load Resources = avg peak load + reserve margin

June 27, 2007Resource Adequacy Steering Committee Meeting 14 Caveats to “Rule of Thumb” Process Utilities need to make their own decisions regarding their risk tolerance for non-firm/ uncommitted resources in their portfolio mix in coordination with their regulators/ local boards The Forum process determines a minimum level of physical resource adequacy, but does not address the risk to high electricity prices

June 27, 2007Resource Adequacy Steering Committee Meeting 15 WECC Single-Hour Capacity Reserve Margin

June 27, 2007Resource Adequacy Steering Committee Meeting 16 WECC Single Hour Reserve Margin Targets 1/ 1/ Approved at June 2007 WECC PCC Meeting