Consultant: CMDC Joint Venture 1 Multi-Country Conference Prague 7-9 June 2004 Selected challenges in IPPC permitting - experience from CEE Vibeke Burchard.

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
The Industrial Emissions Directive (IED) 2010/75/EU
IPPC and Industry By Dr. Ken Macken Dublin Regional Licensing Manager.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Consultant: CMDC Joint Venture Application of BAT in IPPC/EIA Experience in EU Member States Per Ponsaing COWI.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
Insert Filepath here International Symposium on Environmental Issues Industrial Pollution Control and Risk Management September 28 & Jack O’Keeffe.
Substantive environmental provisions Prof. Gyula Bándi.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
European Commission, DG Environment Unit B.1: Water, Marine and Soil EU Substitution Conference - Hamburg, 13/14 June 2002 Slide 1 EU Conference on Substitution.
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
IMPLEMENTATION OF EU AQ LEGISLATION IN THE CZECH REPUBLIC J. FIALA Czech Hydrometeorological Institute Prague, Czech Republic.
The IPPC Directive and EPER Iksan van der Putte. Objectives of IPPC (Integrated Pollution Prevention and Control) To prevent or minimise emissions To.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Consultant: CMDC Joint Venture WHAT DOES INTEGRATED PERMITTING MEAN? (presentation based on H1 method, UK, Thames Region)
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
Economic and Cross Media aspects Bo Jansson Swedish Environmental Protection Agency
Emission control in Bulgaria The involved institutions at national and local (sub-national) levels in Emissions inventory are Ministry of Environment.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
Italy: developments in the new legislation and progress in the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting.
The Process of Development of IPPC Legislation Robert Sarlamanov MA, IPPC Expert Ministry of Environment and Physical Planning, Bercen Exchange Programme,
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
1IndustrialEmissionsDirective. 2 The European Parliament is discussing the Industrial Emissions Directive as adopted by the Council for the second reading.
MODULE 1 Water Framework Directive, Relation of WFD with Daughter Directives, River Basin Management Planning, Water Bodies, Typology, Classification Environmental.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
Consultant: CMDC Joint Venture EIA, IPPC and SEVESO Links.
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
Air Quality Governance in the ENPI East Countries Capacity building for decision makers for small businesses regulation Monika P ř ibylová.
3rd BERCEN Exchange Programme, Prague WASTE CONDITIONS IN ENVIRONMENTAL PERMITS Mrs. Marianne Lindström, Finnish Environmental Institute,
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Page 1 Annexes of the Directive 96/61/ES on IPPC Agency on Integrated Prevention Ms. Lucie Svobodová Integrated and Planned Enforcement of Environmental.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
Group EIA 1: Screening for Annex 2 Both:- case-by-case - thresholds < 10% goes to EIA All Countries have problems with “Salami Slicing” Little Information.
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
The current legal situation
VNPIVNPI 1 IPPC Practice Netherlands Refineries Commission Workshop on IPPC Brussels, July 4, 2008 VNPI Mr. Pieter Thomassen and Mr. Frans Driessen.
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
LCPs – Large Combustions Plants – what ist a large combustion plant?  > 50 MW rated thermal input  Irrespective of type of fuel, age and branch  Heat.
Ministry for Ecology, Energy, Sustainable Development and Sea in charge of Green Technologies and Climate Negotiations
IPPC Permit Procedure in the UK Kiev, 26 January 2011 Alex Radway Senior Advisor Environment Agency for England & Wales, United Kingdom.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
Introduction to the philosophy
BMRA Legislative Policy Group – Shredder Sub Group
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
Annexes of the Directive 96/61/ES on IPPC
First position of the Belgian industry about the
SERBIAN NATIONAL ACTION PLAN [DRAFT]
Aleksandra Antonowicz Green Federation GAJA/CCB
Carl Bro a/s - Team Leader - IPPC-experts - Quality Assurance
IPPC Review Stakeholder Hearing
IPPC Review Stakeholder Hearing 4 May 2007
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

Consultant: CMDC Joint Venture 1 Multi-Country Conference Prague 7-9 June 2004 Selected challenges in IPPC permitting - experience from CEE Vibeke Burchard Carl Bro as

Consultant: CMDC Joint Venture years ago focus was upon  What is IPPC – this directive that totally changed the permit system in all CEE countries  Difference between single media system and integrated approach  BAT and Best for the environment as a whole  Focus on input and not only emission and discharges  Public access  Regular inspections checking compliance with permit

Consultant: CMDC Joint Venture 3 NOW Good principal understanding of Integrated Permitting Institutions and competence in place Many permits issued -Still permitters find the permitting task, ”difficult and very time consuming” -Too much ”desk work” – few face to face consultations -Lack of comprehensive BAT evaluation – insufficient applications -Permits do not always have clear and enforceable conditions -Tools for checking EQS missing or permitters have no knowledge

Consultant: CMDC Joint Venture 4 My WARM UP presentation Focus on 1.BAT as a flexible concept, 2.National BAT guidance and BAT evaluation 3.Shortcomings in the applications related to BAT 4.Priority substances 5.Setting emission limit values 6.IPPC and environmental management

Consultant: CMDC Joint Venture 5 of the environment as a whole B est is most effective in achieving a high general level of protection of the environment as a whole sector reasonably accessible A vailable: developed on a scale which allows implementation in the relevant sector under economically and technically viable conditions – reasonably accessible to the operator technologythe way T echnique: both the technology and the way an installation is designed, operated, maintained and decommissioned

Consultant: CMDC Joint Venture 6 Waste Water B est for the Environment as a Whole Raw materials Auxiliaries Energy / Fuel Water INPUT Odour Ground/soil and ground water protection WASTE recovery of waste and disposal local, regional and global Air emissions – local, regional and global Accident prevention Noise and vibrations Decommissioning Management, operation, monitoring

Consultant: CMDC Joint Venture 7 1.BAT is a flexible concept Not enough to consult the BREFS!! Art 9.4: when setting ELV take into consideration: the technical characteristics of the installation, geographical location local environmental conditions minimisation of long distance and transboundary pollution high level of protection of the environment as a whole Annex IV - likely costs and benefits (proportionality) -commissioning dates (respect the investment cycle) -time needed to implement (pre-application consultations needed)

Consultant: CMDC Joint Venture 8 BAT is a flexible concept BUT You cannot allow a heavily polluting installation in a difficult financial situation to continue harming the environment Solution: State funds/loans - not distorting competition EU structural funds for regional development Refusal of permits Time limited permits

Consultant: CMDC Joint Venture 9 Questions 1 BAT Guidance Does you country have (or have plans for) national BREFs How is it ensured that national BAT Guidelines are in compliance with EU BREFs Does your country have set up Technical Working Groups or has plans to do it. What are the mandate/tasks - how are they selected How does the Ministry inform the permitters and operators about BAT? Can you recommend BREFs that are not yet planned by the EU – what do you miss ( for instance BAT for cow farms) Any national initiatives to recommend

Consultant: CMDC Joint Venture 10 Questions 2 BAT is a flexible concept How do you solve problems related to installations with old, outdated technology, high pollution load in areas with high unemployment – has EU funding been sought or national grant/loans be granted Will you make use of time limited permits or even refusal of permits Have consultations started with all existing IPPC enterprises or do you have such plans ? – to leave sufficient time for implementation of BAT measures What can you recommend as a national initiative

Consultant: CMDC Joint Venture Operator’s BAT evaluation - experience shows Operator does not compare his technique to BAT or the information presented in the application is not comprehensive and sufficient He does not present a justified deviation from BAT In case of non compliance with BAT, the operator does not present an action plan with time schedule or the plan is not justified and targets not set The operator does not present sufficient information (BAT is not only ELVs but also use of energy and water, ground and ground water protection, waste minimisation and waste recovery monitoring, prevention of accidents)

Consultant: CMDC Joint Venture 12 Questions 3 Focus at BAT evaluation Are operators in your country obliged, in his application, to compare the techniques to BAT If, yes, how is the information presented (pls give examples) ? Is the operator’s information sufficient? How/where does the operator find knowledge about BAT How do you build in the improvement plans in the permit Can you recommend any national initiatives to improve the situation

Consultant: CMDC Joint Venture 13 4.Focus on Priority Substances Sources of information are eg: ANNEX III of the Directive List of I (and list II) dangerous substances (76/464) Water Framework Directive Priority Substances and Priority Hazardous substances (Annex X 32 substances or groups of s.) - TOXIC, - PERSISTENT and - liable to BIOACCUMULATE VOC Directive 99/13 – phase out carcerogenic, mutagenic and toxic to reproduction (R 45, 46, 49, 60, 61)

Consultant: CMDC Joint Venture 14 RED ligth ! IF R 50,51, 52, 53: Dangerous, Toxic, or very toxic to aquatic environment R 45, 45, 48, 49, 60, 61: Hazardous to man, incl. unborn child R 58 and 59 (long lasting effect in environment, damage to ozone layer) Other Rs eg. Explosive, Highly flammable etc 4.Focus on Priority Substances

Consultant: CMDC Joint Venture 15 -Emission Ceiling Directive (SO 2, NO x, VOC & NH 3 -Air Framework Directive (SO 2, NO x, particles, Pb, benzene, CO, PAH, Cd, Ar, Ni & Hg) - Acidifying substances - Eutrofying substances - Ozone precursors - Toxic /hazardous 4.Focus on Priority Substances - the local environment

Consultant: CMDC Joint Venture 16 focus at long distance and transboundary effects - Acidifying substances - Eutrofying substances - Toxic substances - so dilution is NOT the long term solution 4.Focus on Priority Substances - also long distance and transboundary

Consultant: CMDC Joint Venture 17 Questions 4 Focus on priority substances How do you evaluate the information from operator on his choice of raw materials and auxiliaries Which information does the operator have to present Examples of substitution of hazardous material Do you have specific guidance on priority substances National guidance recommended ?

Consultant: CMDC Joint Venture BAT and emission limit values § ELVs shall be based on the use of BAT,....taking int account: the technical characteristics of the installation, geographical location local environmental conditions minimisation of long distance and transboundary pollution high level of protection of the environment as a whole

Consultant: CMDC Joint Venture BAT and Emission Limit Values EU Emission limit values are minimum values Local conditions (EQS!!) High level of protection of the environment as a whole! EU BREFs for sectors Other BAT sources Technical characteristics of the installation and and Investment cycle Long distance and transboudary pollution

Consultant: CMDC Joint Venture BAT and Emission Limit Values The site specific permit Result of the site specific evaluation

Consultant: CMDC Joint Venture BAT and Emission Limit Values - national challenges ”All limit values need to be in legal acts” – we cannot leave it for the permitter to decide ELVs in the permits” – guidance is not enough. ”We cannot base emission limit values on ”non national BAT guidelines (e.g BREFs) – we need national guidelines”

Consultant: CMDC Joint Venture 22 Questions 5 BAT and Emission limit values Do you have emission limit values in national legal Acts other than EU limit values. Taking into acount the ELVs in the legislation, how do you ensure that Art 9.4 is complied with How do you take ”external water treatment” into account when setting emission limit values (Art 2.6) Should BREFs have more precise guidance on emission limit values rather than the range often seen (e.g mg/Nm 3 ) Are national initiatives needed/recommended (eg. Air and water dispersion models, guidance, training?)

Consultant: CMDC Joint Venture Precise, controllable and enforceable conditions - A challenge for the project training Dust emission from Stack 5: ”100mg/Nm 3” One must consider: - control period (one hour/day/month/year) - average time of measurement (1 hour, average of three times 1 hour measurement, continuous….) - uncertainty of sampling and analysis - measurements/samples should be representative - location of sampling - are exceedance of the limit values allowed? - If yes, how often and how much

Consultant: CMDC Joint Venture 24 Emissions vary over time ELVnever to be exceeded ELV which could be exceeded twice a month for max 1 hour Guiding value to aim for

Consultant: CMDC Joint Venture Environmental management and BAT Technique Technology way the way you operate way the way you design way the way you maintain - decommissioning EMAS ISO 14000

Consultant: CMDC Joint Venture 26 Questions 6 Environmental Management Are the operators in your country obliged to have an environmental management system Does the operator have to include information about management in his application Are national initiatives recommended