M. Letheren, EAB 3 July 2001; MIC group activities1 EP-Microelectronics group Overview of activities & Project Summaries (more info at:

Slides:



Advertisements
Similar presentations
Actividades de I+D en IGFAE/USC Pablo Vázquez (IGFAE-USC) IV JORNADAS SOBRE LA PARTICIPACIÓN ESPAÑOLA EN FUTUROS ACELERADORES LINEALES Madrid, 2-3 Diciembre.
Advertisements

The ATLAS Pixel Detector
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
LECC COLMAR - Alessandro Gabrielli1 Realization and Test of a 0.25  m Rad-Hard Chip for ALICE ITS Data Acquisition Chain Davide Falchieri - Alessandro.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
LAr Frontend Board PRR Introduction 1.Overview of FEB functionality 2.FEB performance requirements 3.Development and evaluation of FEB 4.Organization of.
Status of 65nm foundry access for Aida June 2013 A. Marchioro CERN/PH-ESE.
FF-LYNX R. Castaldi, G. Magazzù, P. G. Verdini INFN – Sezione di Pisa G. Bianchi, L. Fanucci, S. Saponara, C. Tongiani Dipartimento di Ingegneria della.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Si Pixel Tracking Detectors Introduction Sensor Readout Chip Mechanical Issues Performance -Diamond.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
Robert Szczygieł IFJ PANSPIE 2005 Radiation hardness of the mixed-mode ASIC’s dedicated for the future high energy physics experiments Introduction Radiation.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Advanced Semiconductor Technologies for SLHC A. Marchioro / PH-ESE.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review1 Status of RD49 and COTS and objectives of a one-day review RD49 -
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
The GBT, a Proposed Architecture for Multi-Gb/s Data Transmission in High Energy Physics P. Moreira CERN – Geneva, Switzerland Topic Workshop on Electronics.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
13 Nov Dimitris LOUKAS Name of the Institution : NCSR Demokritos Contact person: Dimitris LOUKAS
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
CCU25 Communication and Control Unit ASIC in CMOS 0.25 μm Ch.Paillard
ASIC Building Blocks for Tracker Upgrade A. Marchioro / CERN-PH-ESE October, 2009.
CMS Upgrade Workshop – Nov 20, H C A L Upgrade Workshop CMS HCAL Working Group FE Electronics: New GOL Nov 20, 2007 HCAL personnel interested in.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
PH-DT-DD Meeting – PH-DT-DD: SSD-Solid State Detectors The team today (CERN & visitors): R&D: Development of radiation tolerant silicon detectors.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Jorgen Christiansen, CERN PH-ESE 1.  EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not.
Microelectronics for HEP A. Marchioro / CERN-PH-ESE.
K.Wyllie, CERNIWORID 2004 Readout of the LHCb pixel hybrid photon detectors Ken Wyllie on behalf of the LHCb collaboration and industrial partners The.
Update on works with SiPMs at Pisa Matteo Morrocchi.
An Overview of the FPIX Detector Upgrade – CMS Experiment
RD53 1.  Full/large demonstrator chip submission ◦ When: 2016 A.Early 2016: If chip must have been fully demonstrated in test beams for TDRs to be made.
R. Kluit Electronics Department Nikhef, Amsterdam. Integrated Circuit Design.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
R&D for SLHC detectors at PSI and Geneva CHIPP workshop on the high-energy frontier of particle physics Zürich 6. September 2006 R. Horisberger (Paul Scherrer.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
KIT TA Status Felix Bögelspacher, Bärbel Bräunling, Wim de Boer, Alexander Dierlamm Prof. Dr. Max Mustermann | Name of Faculty.
Possible contribution of Pisa on pixel electronics R&D
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Readout System of the CMS Pixel Detector
A Rad-Hard Slow Control Network for the CMS Central Tracker
BOND/QART Lab and Pixel R&D
Electronics reorganization
Roberto Dinapoli CERN-CEM II,Montpellier For the ALICE Collaboration
LHCb and its electronics
Phase shifter design for Macro Pixel ASIC
VELO readout On detector electronics Off detector electronics to DAQ
Optical links in the 25ns test beam
Silicon pixel detectors and electronics for hybrid photon detectors
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

M. Letheren, EAB 3 July 2001; MIC group activities1 EP-Microelectronics group Overview of activities & Project Summaries (more info at: )

M. Letheren, EAB 3 July 2001; MIC group activities 2 Overview Design Projects Infrastructure and Services R&D Other Responsibilities

M. Letheren, EAB 3 July 2001; MIC group activities 3 Overview (1) – Design MIC group collaborates (mainly) with LHC teams and other HEP electronics groups to: Develop mixed-signal, (rad-hard) electronics for front-ends and data acquisition systems: System design & partitioning into ASICs. Prototype ASIC development. (spec., design, fab., evaluation) Proto ASIC integration. (hybrids, modules, beam tests)

M. Letheren, EAB 3 July 2001; MIC group activities 4 Overview (2) – Support HEP-wide support for rad-tolerant design: Rad-tol digital library & design kit for 0.25um process. (responsibility shared with RAL) Multi-Project Wafer service for 0.25um process. Packaging and mounting of chips on hybrids. (assembly, glueing, wire bonding, etc.) Mixed-signal IC test lab. (verification of prototypes and small production volumes) X-ray irradiation. COTS assistance (advice, SEU testing, database) Wafer storage. (Controlled environment: N2-flow, antistatic, temp., humidity, access) Organization of ASIC volume production & test. Participation in volume testing for some projects.

M. Letheren, EAB 3 July 2001; MIC group activities 5 Overview (3) – R&D Completed R&Ds: RD9 – Rad-hard SOI (Thomson). (RD29) – Rad-hard SOI (DMILL). RD19 – Hybrid pixel detector systems. RD31 – Event Building with ATM switches. RD48 – Hardening of Si detectors. R&Ds continuing as common projects: RD49 – Rad-tolerant design in deep submicron. COTS – Understanding COTS issues at LHC. R&D for future experiments? Ultra-hard electronics (cryogenics, < 0.1um). Monolithic systems.

M. Letheren, EAB 3 July 2001; MIC group activities 6 Overview (4) – other responsibilities Integration of CMS Tracker electronics (A. Marchioro) Electronics coordination for LHCb (J. Christiansen)

M. Letheren, EAB 3 July 2001; MIC group activities 7 MIC Group Structure B. van Koningsveld M. Letheren Staff: F. Anghinolfi G. Anelli P. Aspell J.-P. Avondo-Bedone M. Campbell F. Cossey-Puget (0.5) F. Faccio J. Kaplon J.-C. Santiard Staff: G. Cervelli J. Christiansen C. Ljuslin P. Moreira E. Murer C. Paillard Visitors M. Despeisse N. Pelloux S. Saramad R. Szczygiel Visitors: P. Vazquez Staff: M. Glaser Visitors: M. Moll R. Eggert A. Marchioro Digital designs (DG) M. Letheren Semiconductor detectors (SD) P. Jarron Front-ends (FE) CAE support Moved to TA1-SD (01/01/2001) K. Haensler

M. Letheren, EAB 3 July 2001; MIC group activities 8 DESIGN PROJECTS

M. Letheren, EAB 3 July 2001; MIC group activities 9 MIC design projects (1) ATLAS SCT (CERN, Cracow, Geneva, RAL) ABCD baseline DMILL ABCD 0.25um backup SCTA analog (DMILL) Chip & module test TRT (CERN, Cracow, Geneva, U-Penn) DTMROC in DMILL DTMROC 0.25um CMS Tracker (CERN, RAL, IC,…) Fast controls, FEC ASICs for opto-links Electronics integration Preshower (CERN, Lyon) Delta+PACE (DMILL) Fast controls + GOL ECAL 1 Gbit/s opto-link (GOL) Muons 0.75ns TDC (0.25um)

M. Letheren, EAB 3 July 2001; MIC group activities 10 MIC design projects (2) ALICE ITS - Pixels (MIC, ED) Pixel readout chip Pilot-chip, GOL Bump-bonding Testing ITS - Si-drift (RD49 -> Torino) PASCAL front-end HMPID & DiMuon Spect Gassiplex, DiLogic & hybrids (MWPC readout). TOF Hi-res TDC (<50ps) LHCb RICH (MIC, ED, TA2) Pixel readout chip Bumping & testing VELO (MIC -> ED) Adapted SCTA (DMILL) Muons (CERN, Rio de Janeiro) Carioca fast FE amp & discriminator (readout of MWPCs for L0 trigger)

M. Letheren, EAB 3 July 2001; MIC group activities 11 Common developments Rad-hard chips: TTC receiver (TTCrx) All Gigabit Optical Link  G-link & Gigabit ethernet 800 and 1600 Mbit/s CMS + Alice Programmable delay All Voltage Regulators (ST Microelectronics) All

M. Letheren, EAB 3 July 2001; MIC group activities 12 INFRASTRUCTURE & SERVICES

M. Letheren, EAB 3 July 2001; MIC group activities 13 Rad-tolerant design support Rad-tol design support: Library Core cells, pads, memory, etc. CAE customisation Cadence, Synopsys, Hercules, etc. 0.25um NRE runs & MPWs: Demand-driven MPWs (~3-4 per year, 20 designs each) Services: Forecasting & billing, DRC, reticle assembly, polygon filling, fab submission, dicing & shipping, Fab interface for problems & “specials”.

M. Letheren, EAB 3 July 2001; MIC group activities 14 Packaging & module assembly

M. Letheren, EAB 3 July 2001; MIC group activities 15 IC Test Lab  Mixed-signal test system Automatic wafer prober -> * 112 digital 200 MHz * VXI analog instrumentation (synchronized) * Labview environment for DAQ & analysis * Test vector down-load from CAE * Step and Repeat with pattern recognition * Stand alone or interfaced to IMS

M. Letheren, EAB 3 July 2001; MIC group activities 16 X-ray irradiation facility X-ray energy: 20 – 60 keV Beam diameter: 100 um – 1 cm Dose rate: 20 – 800 rad/s 8-inch wafer probe equipped with CCD camera Thermal chuck:-25 0 C – C

M. Letheren, EAB 3 July 2001; MIC group activities 17 R&D PROJECTS

M. Letheren, EAB 3 July 2001; MIC group activities 18 Low-key R&D activities RD49+ Prepare for next-generation technology: IBM 0.25um frame contract valid thru Q Extension possible until which date? Prepare rad-tol design support for next-generation. Choose & characterize a technology. Develop design method & tools (CAE, test). Develop low-voltage analog circuit design techniques. Develop LHC Demonstrators. Ultra rad-hard systems (NA60 beamscope, LHC luminosity upgrade) Cryogenic detectors => cryogenic electronics. Characterization of 0.25um CMOS at cryogenic temps. (device model and parameters) Readout ASIC for NA60 cryogenic beamscope.

M. Letheren, EAB 3 July 2001; MIC group activities 19 Future R&D activities? Monolithic Systems? Integration of sensor on electronics wafer. Integrated APDs (EPFL). Integrated pixels. CERN/Berne patent pending (with ETT) Assisting LEPSI (Strasbourg) with 0.25um What else? LHC upgrade study groups being set up.

M. Letheren, EAB 3 July 2001; MIC group activities 20 OTHER RESPONSIBILITIES

M. Letheren, EAB 3 July 2001; MIC group activities 21 APVs CLK - T1 CCU DCU Det PLL A/D Memory TTCrx I2C FED FEC IVIV TTCrx PCI Intfc CLK & T1 A/D Temp FE Hybrid CCU Module FEC ctrl Data Path Control Path to DAQ LD Integration of CMS tracker electronics. (A. Marchioro)

M. Letheren, EAB 3 July 2001; MIC group activities 22 CMS Tracker Integration Tracker electronics: FE chip (APV25)RAL + IC FEDRAL FECCERN Opto linksCERN Fast controlsCERN (rad-hard ASICs) CCU – Communication & Control Unit PLL - Phased Locked Loop DCU – Detector Control Unit LD - Laser Driver RX40 – 40 Mbit/s receiver TTCrx – TTC receiver etc. Tracker system tests: 1. CERN 25ns structured beam: * Confirm functionality * Synchronization of front-ends 2. Milestone -> 2 working Rods

M. Letheren, EAB 3 July 2001; MIC group activities 23 LHCb electronics coordination (J. Christiansen ~ 50%) Common LHCb front-end architecture Modeling and simulation studies Organizing LHCb electronics meetings. Organizing Reviews etc.

M. Letheren, EAB 3 July 2001; MIC group activities 24 Summary of MIC activities ASIC developments for all LHC experiments Infrastructure & support for design, test, packaging, module assembly, radiation studies, etc. Technology R&D for future experiments. Direct involvement in LHC collaborations (CMS tracker integration, LHCb electronics coordination)