HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

Studying the Physical Properties of the Atmosphere using LIDAR technique Dinh Van Trung and Nguyen Thanh Binh, Nguyen Dai Hung, Dao Duy Thang, Bui Van.
S. Bricola, A. Menegolli, M. Prata, M.C. Prata, G.L. Raselli, M. Rossella, C. Vignoli INFN and University of Pavia - Via Bassi, 6 – Pavia – Italy.
CRAYS and TA telescope calibration ICRR N. Sakurai, M. Fukushima Utah University L. Wiencke.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Transducers Converts one type of energy into another. Light  Electrical (current, voltage, etc.) What characteristics should we look for in a transducer?
October 1 -10, 2014JEM-EUSO Workshop - Toulouse1 Balloon – EUSO Xenon / UV LED Flasher Calibration Evgeny Kuznetsov for UAH / MSFC GLS team University.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
1 HF Laser/LED Calibration Studies L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH 1->9 light splitter w/ pulsed.
Measurement of the absolute efficiency,
HBD Transmission Monitor: Update on Assembly & Testing HBD Working Group Meeting 8/29/06 B. Azmoun Brookhaven National Lab.
CsI Photocathode Production and Testing
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
A RICH Detector for strangeness physics A RICH Detector for strangeness physics in Hall A at Jefferson Lab in Hall A at Jefferson Lab. Why. How. Main Characteristics/Expected.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Development of New Detectors for PET Imaging at BNL DOE/JLAB Meeting Bethesda, MD May 20, 2004 Craig Woody Physics Dept Brookhaven National Lab RatCAPBeta.
Optronic Laboratories Inc. OL Series 750 Automated Spectroradiometric Measurement System Optronic Laboratories Inc. OL Series 750 Automated Spectroradiometric.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
Gas measurements and CsI photocathode studies at WIS Ilia Ravinovich November 2002 Weizmann Institute.
Prototype Tests and Construction of the Hadron Blind Detector for the PHENIX Experiment at RHIC Craig Woody Brookhaven National Lab For the PHENIX Collaboration.
Update on TPC R&D C. Woody BNL DC Upgrades Meeting October 9, 2003.
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
Neutron detection in LHe ( HMI run 2004) R.Golub, E. Korobkina, J. Zou M. Hayden, G. Archibold J. Boissevain, W.S.Wilburn C. Gould.
HBD Transmission Monitor Update VIII: HBD Gas Transmittance + Systematic Error HBD Working Group Meeting 1/23/06 B.Azmoun, S.Stoll Brookhaven National.
OL 750 Measurement Systems OL 750 Measurement Systems Optronic Laboratories, Inc.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
Status of TPC/HBD for PHENIX Craig Woody BNL DC Upgrades Meeting February 12, 2002.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Pe Collection Efficiency in CF4 Revisited HBD Meeting 04/15/08 B.Azmoun, A.Caccavano BNL.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors Craig Woody Brookhaven National Lab B.Azmoun 1, A Caccavano 1, Z.Citron 2,
HBD Gas System and Monitoring Craig Woody BNL HBD Working Group Meeting December 8, 2004.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors C. Woody B.Azmuon 1, A Caccavano 1, Z.Citron 2, M.Durham 2, T.Hemmick 2, J.Kamin.
1 Fulvio TESSAROTTO GDD meeting, CERN, 01/10/2008 Trieste THGEM news New THGEM test in the COMPASS hall New THGEM test in the COMPASS hall Preparation.
Basic Measurement of the Hamamatsu 10 inch PMT at –40 degree –40 degree Hiroko Miyamoto Dept. of Physics CHIBA University The Uniformity measurement of.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Photodetection EDIT Absolute Measurement of the Quantum Efficiency of a Classical PMT Task: measure the QE of a PMT in the wavelength interval 200 to 800.
HBD Transmission Monitor Update VII: Systematics & HBD CF4 B.Azmoun, S.Stoll Brookhaven National Lab HBD Working Group Meeting: Jan. 9, 2007.
P HOTON Y IELD DUE TO S CINTILLATION IN CF4 Bob Azmoun, Craig Woody ( BNL ) Nikolai Smirnov ( Yale University )
Status of TRIUMF Prototype Studies Christopher Hearty University of British Columbia/IPP May 31, 2010.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
1 HMPID Project Assembly & Tests of CsI QE monitors: VUV-scanner and ASSET Milestone: December 2002.
UNIT-3 ADVANCES IN METROLOGY
LXe Alignment with X-rays
Chapter 3. Components of Optical Instruments
Practical Absorbance and Fluorescence Spectroscopy
BESIII EMC electronics
Development of hybrid photomultiplier for Hyper-Kamiokande
Status of Readout Boards
OL 750 Measurement Systems
OL 750 Spectroradiometer & Linear Spectral Transmission Measurements
Presentation transcript:

HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005

C.Woody, HBD Working Group Meeting, 10/19/052 HBD Gas System Single pass system for Run 6 Input Output Not initially instrumented

C.Woody, HBD Working Group Meeting, 10/19/053 Gas Monitoring McPherson 234/302 VUV spectrometer Uses pure argon as reference gas (no vacuum) H 2 0 O 2 VUV transmission Gas monitoring near detector (under stairs by labyrinth)

C.Woody, HBD Working Group Meeting, 10/19/054 Oxygen and Water Sensors GE Infrastructure Sensing (GE Panametrics) MIS1 system 6 dual channel inputs One moisture, one oxygen (aux input) per channel Control unit in hand, sensors ordered M2LR moisture probe O2X1 oxygen sensor Will monitor H 2 O and O 2 on common gas input and separately on east and west detector outputs

C.Woody, HBD Working Group Meeting, 10/19/055 Gas Transmission Monitoring  Based on McPherson 234/304 VUV monochrometer  Use high intensity D 2 lamp to provide sufficient current for CsI PMTs operated in photodiode mode  Constant monitor of lamp intensity  Measure common gas input and east and west gas outputs separately using motorized translatable mirror. D 2 Lamp Monochromator Focusing elements Beam Splitter Reference CsI PMT CsI PMTs MgF 2 Window Gas Cells Common input East Output West output MgF 2 Window Motor control Movable Mirror LC switch pA

C.Woody, HBD Working Group Meeting, 10/19/056 System Throughput 12 mm Beam spot at end of 50 cm gas cell (12 mm collimator)

C.Woody, HBD Working Group Meeting, 10/19/057 McPherson System in HBD Lab

C.Woody, HBD Working Group Meeting, 10/19/058 Photocathode currents D2 Lamp Upper Beam Light Coll. Box Lower Beam Slits Monochromater Cross Beam Splitter Flux and PMT current measured at three locations: Output of the light collection box Top flange of cross Lower flange of cross Peak currents are ~ nm with a 30 W D 2 lamp Currents are < 10 pA below 120 nm  Probably will want to use 150 W D 2 lamp (water cooled), but must check efficiency B.Azmoun

C.Woody, HBD Working Group Meeting, 10/19/059 Keithley Current Measuring System

C.Woody, HBD Working Group Meeting, 10/19/0510 Quantum Efficiency Monitoring Two possible methods:  DC UV lamp and measure current Measure current from mesh Cannot easily measure using HV module (100 nA resolution) Could use current switch and series picoammeter, but this complicates the HV distribution system  Pulsed UV lamp and use FEM readout

C.Woody, HBD Working Group Meeting, 10/19/0511 Grounding System HV Supply LV Supply FEM Preamp Board GEM Detector HV Distribution Box +6.5 V -7.0 V MVD Rack return

C.Woody, HBD Working Group Meeting, 10/19/0512 Xenon Flash Lamps Size ~ mm diameter Power: W Energy per pulse: Joules  ~ 2 x photons per pulse in wavelength range nm Time jitter ~ ns Frequency up to 300 Hz Properties Time jitter requires external trigger trigger from PPG (like EMCAL laser) monitor with photodiode (  timing signal) Must provide large attenuation Possible problem with RF noise Possible Problems Can test this with full scale prototype

C.Woody, HBD Working Group Meeting, 10/19/0513 Mounting Install 1” MgF 2 windows