EHN1 North Wall Dismantling Schedule Bastien Rae.

Slides:



Advertisements
Similar presentations
The MATURA System, an overview. Matura Slide series The Matura System, an overview.
Advertisements

Heating, Ventilating, and Air-Conditioning
Various services have to be connected. Here the sewer is being connected and pipes laid for storm water removal.
NuMI Target Pile Fan Repair Michael Andrews 3/15/10.
Small Wheel Phase 1.9 Nigel Nation 1 November 2006.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
1 13 Oct 2006 Small Wheel Phase 1.9 Logistics C. Weaverdyck N. Nation 13 October 2006.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Construction and Installation of the CLIC Experimental Area
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
ATLAS-CMS Batteries ATLAS - - 2x MSS battery banks + 2x Quench Heater banks - - MSS systems OK (6 hrs minimum) - - HEC batteries promised for week 25,
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
06 August EHN1 civil engineering project status (JULY) Summary: Updating of the activities carried out on-site (Done) in JULY List activities on.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
LS2 Cooling & Ventilation Activities M. Battistin EN/CV Acknowledgements: P. Barriere, R. Bozzi, A. Broche, O. Crespo,
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
TC meeting P2 planning wks 3&4 A.Tauro
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
EHN1 Extension planning
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Budget specification EHN1 Extension: Infrastructure (WG2)
Heating, Ventilating, and Air Conditioning
EN-CV Progress EHN1 Extension Project
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Hall A Target Status 9/27/16 Dave Meekins.
SPS EN-CV Planning LS (initial draft)
YETS Dec 2017 – March 2018 LS Experiments requirements / Services (un)availability F.Butin / EN-EA EACM meetings outcome, thanks to all participants.
Heating, Ventilating, and Air-Conditioning
Jaitique Water Filtration Project
ARIEL Phase I Operations
Moisture and Poor Ventilation
Project 2018 October 31, 2018.
Summary of the presentation:
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

EHN1 North Wall Dismantling Schedule Bastien Rae

EN-CV Task before end of CMS TaskStartDuration Install new cooling system Barrack BE-BIMon day Reroute CMS cold box to raw waterMon week Reroute Vertex cold box to raw waterMon week Reroute Atlas cold box to raw waterMon week Install scaffolding on Jura side (EN-MEF-SI?)Thu days Cut drinking waterMon days Cut Ventilation duct and pipe on Jura sideWed day Remove drinking water from NW (Asbestos)Thu days

EN-CV Task after CMS run TaskStartDuration Disconnect cooling system from CMS Barrack 902Mon day Install scaffolding on Salève side (EN-MEF-SI?)Mon day Cut and remove chilled water pipeWed week Cut Ventilation duct and pipe on Salève sideWed day Install new Chilled water pipe (Gallery + Barrack BE-BI)Thu days Connect the new cooling system for Barrack BE-BITue day Rerouted Gallery Pipes (2 demi water, 2 raw water, 1 compressed air)Mon weeks