PRESENTATION TO NATIONAL TRANSPORT PORTFOLIO MEETING 15 February 2011

Slides:



Advertisements
Similar presentations
S.A.B. Welcomes all Visitors Discussion on Proposed N2 Wild Coast Toll. With specific reference to the Joyner rd Toll.
Advertisements

DEBT OWED TO MUNICIPALITIES PRESENTATION TO THE PORTFOLIO COMMITTEE ON COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS.
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
1 Presentation to the Portfolio Committee on Water Affairs and Forestry and Select Committee on Land and Environmental Affairs 2005 Department of Water.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Environmental Assessment Public Meeting
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Freight-Supportive Guidelines ACT Canada – Sustainable Mobility Summit 2012 November 7, 2012 Ontario Ministry of Transportation.
Presentation to Select Committee on Public Services Briefing on Unproclaimed Roads and Road Maintenance Budgets 14 th August
AQUACULTURE DEVELOPMENT ZONES & INLAND FRESHWATER AQUACULTURE
Main mode to work - % of commuters Western Cape Eastern Cape Northern Cape Free.
Central-Wan Chai Reclamation
Puleng Kekana Department of Arts and Culture PRESENTATION TO LIASA – CICD SEMINAR 30 JUNE 2009.
Alberta Land Uses; History, Current Status, and Future Trends The Development of a Land-use Framework for Alberta Synergy Alberta Conference October 28,
PUBLIC HEARINGS November 2006 KwaZulu-Natal Department of Transport Conditional Grants and Capital Expenditure.
N2 WILD COAST TOLL ROAD PROJECT Draft Environmental Impact Assessment Report Feedback Sessions.
Runways – 7 July Paul Harwood
Leading the Public Service to Higher Productivity Status quo with regard to the representation of persons with disabilities in the Public Service and women.
ROAD INFRASTRUCTURE IMPERATIVES IN SOUTH AND SOUTHERN AFRICA European Union Road Federation 3 June 2005.
Tackling Transport in Africa The TEST Network Status in SA Rahul Jobanputra Centre for Transport Studies University of Cape Town
PRESENTATION TO THE PORTFOLIO COMMITTEE ON TOURISM: AIRLIFT STRATEGY 6 NOVEMBER 2012 Department of Transport.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
SUSTAINABLE LIVELIHOODS – EPWP AND TOURIST GUIDES 23 AUGUST 2011.
FOCUS AREAS ON NATIONAL ROADS Congestion. FOCUS AREAS ON NATIONAL ROADS Causes – Traffic Density.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
EPWP PRESENTATION TO PORTFOLIO COMMITTEE. Principles informing IDT’s role Adding value to government development agenda Delivery of measurable sustainable.
Regional Goods Movement Study for the San Francisco Bay Area presented by Michael J. Fischer Cambridge Systematics, Inc. November 12, 2004 Agenda Item.
Select Committee on Appropriations Wednesday, 29 August 2012 Committee Room M46, Marks Building Presentation by Mr MG Seitisho LOCAL GOVERNMENT TURNAROUND.
PARKING STRATEGY POLICY DEVELOPMENT Transportation & Asset Management Environment & Regeneration Scrutiny Committee 28 February 2007.
1 PRESENTATION TO PORTFOLIO COMMITTEE ON TRANSPORT 22 MAY 2002 NATIONAL DEPARTMENT OF TRANSPORT.
Dr. Graham Dominy National Archivist Department of Arts and Culture COMMUNITY LIBRARY CONDITIONAL GRANT FUNDING: Report to NCOP Select Committee.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
What Census 2011 says about Free State agricultural households Moses Mnyaka – Stats SA 11 October 2013.
Presentation of the Property Rates Debt to the Port Folio Committee on Cooperative Governance & Traditional Affairs 25 October 2011 Presented by: Cathy.
Programme 4: Housing Development Finance Purpose: Fund national housing and human settlement development programmes in terms of the Housing Act (1997),
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
1. PRESENTATION TO SELECT COMMITTEE ON ECONOMIC DEVELOPMENT OF DMR 2010 / 11 ANNUAL REPORT 15 NOVEMBER 2011 Programme 4: Mineral Policy & Promotion 2.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Themba Wakashe Director - General Department of Arts and Culture 2009 / 10 DIVISION OF REVENUE BILL PRESENTATION TO SELECT COMMITTEE ON FINANCE NCOP 3.
EPWP Progress Reports to Portfolio Committee Presented by: Stanley Henderson DDG: EPWP 01 March
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
1 Financing Tourism Development Owen Willcox | Chief Director: Economic Services, National Treasury 31 March 2015.
Status Report on Water User Associations in South Africa Portfolio Committee on Water and Environmental Affairs 24 April 2013.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
BRIEFING ON SCHOLAR TRANSPORT TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON TRANSPORT By Mr George Mahlalela Director General 12 April April 2011.
PROGRESS REPORT ON LAND RESTITUTION CLAIMS PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 07 FEBRUARY 2012 MR T. A MAPHOTO.
2010 World Cup South Africa. One question in everyone’s mouth right now, my guess would be: How does a soccer world cup relate to sustainable technology?
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
1 Presentation of the Financial Performance of the Department to the Standing Committee on Appropriations 23 March 2011 Presented by Cathy Motsisi Chief.
1 Reporting on Conditional Grants Presentation to Portfolio Committee 19 February 2007.
Iliso Consulting (Pty) Ltd Outer West Strategic Evaluation 1 Outer West Development Area Strategic Evaluation Traffic and Transportation Issues February.
Moloto Road (R573) Safety Investigations
Strategies for industrial development
The I-465 West Leg Reconstruction Project
20 PRESENTATION TO THE PORTFOLIO COMMITTEE FOR ECONOMIC
PRESENTATION TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND ADMINISTRATION Oversight Report on the Verification of Qualifications in the Public Service.
PORTFOLIO COMMITTEE ON PUBLIC WORKS VERIFIED GOVERNMENT DEBT OWED TO MUNICIPALITIES AND PAYMENTS Department of Public Works 24 May 2016.
DEPARTMENT OF TRANSPORT
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Progress Report on Payment of Suppliers
Sport and Recreation Infrastructure Programme
Presentation by Head: Transport
Progress report on the roll out of GIAMA
KEYNOTE STAGE SPONSOR.
Department of Transport Conditional Grants and Capital Expenditure
SESSION 2B – TRAFFIC MANAGEMENT, SAFETY AND SECURITY 9 JULY 2019
FREEWAY MANAGEMENT SYSTEMS:
Presentation transcript:

PRESENTATION TO NATIONAL TRANSPORT PORTFOLIO MEETING 15 February 2011 PROPOSED N2 WILD COAST TOLL ROAD PRESENTATION TO NATIONAL TRANSPORT PORTFOLIO MEETING 15 February 2011

NATIONAL TOLLROAD NETWORK STATUS QUO Province Mainline Ramp Eastern Cape 1 Western Cape 1 (+4xN1/2 Toll) - (Approx 4 Winne) Northern Cape - Free State 3 (+ 2xR30) Mpumalanga 3 North West 2 Gauteng 9 (+ 51xGFIP) 15 Limpopo 4 KZN 7 14

KWAZULU NATAL NATIONAL ROAD NETWORK - STATUS QUO ROUTE DESCRIPTION LENGTH Non-Toll Toll R61 Port Edward to Port Shepstone 24km 21km R22 Hluhluwe to Mozambique Border 170km P720 N2 to Golela Border 10km N2 Brooksnek to Port Shepstone 136km Port Shepstone to Hibberdene 27km Hibberdene to Mdloti 117km Mdloti to Empangeni 138km Empangeni to Mpumalanga Border 250km N3 Durban to Paradise Valley 9km Paradise to Key Ridge 20km Key Ridge to Cedara 62km Cedara to van Reenen 151km N11 Bergville Interchange to Volksrust TOTAL EQUATES TO 27% OF NETWORK 948km 356m Additional 102 kilometers of toll road will increase the tolled network to 458kms which equates to 35% of the national road network

KWAZULU NATAL TOLLROAD NETWORK CURRENT TOLLS Mainline Toll Plazas Durban- KZN Border (N3) Class 1 Class 4 Mariannhill 7.50 26.00 Mooi Plaza 32.00 149.00 Tugela 46.00 165.00 Totals R85.50 R340.00 Durban- Richards Bay Tongaat 7.00 28.00 Mvoti 8.50 45.00 Mtunzini 29.00 93.00 R44.50 R166.00 Durban- Port Shepstone Oribi 18.00 74.00 R18.00 R74.00 TOTAL TOLL FEES R148.00 R580.00 Additional ramps tolls Mandini 4.50 14.00 Dokodweni 12.00 39.00 Bergville

PROPOSED N2 WILD COAST TOLL ROAD Length 560 km 9 Major Bridges

STATS KZN EC Length (km) 150 410 % Length 27 73 Cost (billions) R2 R7 Mainline Tolls 3 4 Ramp Tolls 22 2 Toll ratio 1 Proposed Toll Fees R61.00 R260.00

Toll Sites and Traffic Volumes

BACKGROUND Government’s Wild Coast Spatial Development Initiative (1997) focused on a developmental strategy which could address poverty, create jobs and uplift communities of the impoverished Wild Coast area. The strategy sought to extend the development corridor running along the South Coast of KwaZulu-Natal into the Pondoland area and ultimately link this with the Garden Route. The strategy entailed the conservation of the natural and cultural heritage of the Wild Coast through the establishment of a conservation area, focused on people and their sustainable use of the area’s assets.

BACKGROUND Cont. Submission of original EIA report – 28 February 2003 Record of Decision granted by Department of Environmental Affairs and Tourism (DEAT) on 3 December 2003 was appealed. Appeals upheld by Minister of Environmental Affairs and Tourism on 9 December 2004. Result of conflict of interest by environmental consultant

BACKGROUND Cont. Submission of final EIA report – December 2009 Record of Decision granted by Department of Environmental Affairs and Tourism (DEAT) on 19 April 2010. Appeals were submitted to the Minister of Environmental Affairs and Tourism by all stakeholders Awaiting final decision by the Minister

WHY THE N2 WILD COAST TOLL ROAD PROJECT? Improve the road network between East London (Gonubie Interchange) and Durban (Isipingo Interchange) Improved, shorter and safer road for all with a distance saving of +/- 75 km Provide mobility and access to economic activity along the Wild Coast

SOCIAL & CULTURAL ISSUES Limited capacity improvement to KZN Isipingo – Winklespruit section (15 km) Increase in capacity by adding an additional lane for only some 10 kilometers from Isipingo to the Amanzintoti River. The significant traffic volumes on this short section. (2.7% of the total length of 560kms) will have one mainline toll and 6 new ramp tolls which will generate the highest toll income along the route.

SOCIAL & CULTURAL ISSUES Cont. Winklespruit - Southbroom section (112 km) No capacity improvements One new mainline toll plaza at Park Rynie and 10 new ramp tolls. Southbroom – Mthamvuna River section (23 km) Improvement of intersections only Additional 6 ramp tolls

SOCIAL & CULTURAL ISSUES Cont. The Isipingo Toll Plaza will process the highest traffic volume in the country, which will lead: to traffic delays increased air pollution Will escalate transport costs to the commuters discourage economic development

SOCIAL & CULTURAL ISSUES Cont. Increasing the cost of transport and specifically Public transport as due to the user pay principle these costs will be passed onto the commuters who are the poorest of the poor. In KZN the route is not promoting rural development as it follows the coastline which is an already developed area.

SOCIAL & CULTURAL ISSUES Cont. The proposed alternative utilizing the R102 is not suitable for high volumes of traffic as: traverses through densely built up commercial and residential areas which would result in severe congestion damage to the road impact on traffic and pedestrian safety along the route

SOCIAL & CULTURAL ISSUES Cont. Anticipated increase of traffic on R102 to avoid the tolls R102 Joyner Road – Prospecton Road increase of 74% R102 Joyner Road – Dickens Road increase of 273% R102 Park Rynie – Pennington section increase of 62% Will result in the R102 having to be upgraded to accommodate these higher volumes and this cost would have to carried by the local municipalities and the Provincial Department of Transport.

ECONOMIC CONSEQUENCES The impacts of the following need to be considered. The effect the tolling will have on eThekwini integrated transport system (port, rail and road). The relocation of the Airport (KSIA) to the north of Durban and the change of traffic around the old airport (DIA) site.

ECONOMIC CONSEQUENCES Cont. Increase in the transport cost for business which will increase operating costs and will increase commodity prices. Discourage economic development as industry and commercial business will move to other areas to avoid the toll costs

ECONOMIC CONSEQUENCES Cont. The addition of these toll roads may have a negative impact generally on tourism because of the total cost of tolls from N2 North as well as N3 coming from Gauteng. It may become very expensive for tourist who may then choose other destinations.

Conclusion The proposed Tolling of N2 Wild Coast Road was tabled at the Transport Portfolio Committee and rejected It was referred to Cabinet for a decision by the EXCO To support the development of the new corridor.

Conclusion cont. However KwaZulu-Natal motorists should not subsidise the road in the Eastern Cape. Therefore the establishment of additional Tolls on the KZN section of the proposed road is not supported.

Thank You QUESTIONS AND ANSWERS