Modeling Various Tolling Schemes Using Emme: Seattle Experience Andrew Natzel, Parsons Brinckerhoff Bhanu Yerra, Parsons Brinckerhoff Craig Helmann, Puget.

Slides:



Advertisements
Similar presentations
A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM Murli K. Adury Youssef Dehghani.
Advertisements

General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Interstate 2.0: a 21 st -Century Network Financed by All- Electronic Tolling by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation.
UATS Director’s Workshop Agenda April 30, 2001  Introduction (12:30 – 12:35)  Development Review and Mitigation (12:35 – 2:10) Break (2:10 – 2:15) 
Forecasting Traffic and Toll Revenue for Public-Private Partnerships (P3) vs. Metropolitan Planning Organizations (MPO): A comparison 14 th TRB National.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
Project Prioritization - 1 Project Prioritization Using Paramics Microsimulation: A Case Study for the Alameda County Central Freeway Project Presented.
I-394 Express Lane Community Task Force March 18, 2004.
Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Archived Data User Services (ADUS). ITS Produce Data The (sensor) data are used for to help take transportation management actions –Traffic control systems.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Traffic Concepts CEE 320 Steve Muench.
Microsimulation for Rural and Exurban Regions: Lake County, California David Gerstle (presenting) & Zheng Wei Caliper Corporation.
Roads & Transit 2007 A Smart Joint Program? Financial Considerations As of April 15, 2007.
Presented to presented by Cambridge Systematics, Inc. Transportation leadership you can trust. An Integrated Travel Demand, Mesoscopic and Microscopic.
Versatile Applications of EMME/2 and ENIF: Seattle Experience Madhavi Sanakkayala Heather Purdy & Sujay Davuluri Parsons Brinckerhoff, Seattle.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Tolling and Congestion Pricing Patrick DeCorla-Souza Office of Innovative Program Delivery Federal Highway Administration Presentation to Transportation.
Application of SHRP2 Decision Support Tool to SR 509 Corridor Planning The 14th TRB National Transportation Planning Applications Conference May 8, 2013.
Considerations when applying Paramics to Strategic Traffic Models Paramics User Group Meeting October 9 th, 2009 Presented Matthew.
Assessment of Urban Transportation Networks by integrating Transportation Planning and Operational Methods /Tools Presentation by: Sabbir Saiyed, P.Eng.
Lynn Peterson Secretary of Transportation Combining Macro Scopic and Meso Scopic Models in Toll and Traffic Revenue Forecasting SR 167 Corridor Completion.
April 2010 Scott Smith Volpe Center / RITA / U.S. DOT Transportation Border Working Group Meeting Boston, MA An Integrated Regional Planning / Microsimulation.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Presented by: Pascal Volet, ing. City of Montreal TRB Technical Conference May 9, 2007 A Multi-resolution Modelling Framework in the Montréal Area A Multi-resolution.
MATRIX ADJUSTMENT MACRO (DEMADJ.MAC AND DEMADJT.MAC) APPLICATIONS: SEATTLE EXPERIENCE Murli K. Adury Youssef Dehghani Sujay Davuluri Parsons Brinckerhoff.
Transportation leadership you can trust. presented to TRB 11 th Conference on Transportation Planning Applications presented by Dan Goldfarb, P.E. Cambridge.
Transportation leadership you can trust. presented to 12 th Annual TRB Transportation Planning Application Conference presented by Dan Goldfarb, P.E. Cambridge.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
Dynamic Tolling Assignment Model for Managed Lanes presented to Advanced Traffic Assignment Sub-Committee presented by Jim Hicks, Parsons Brinckerhoff.
Dowling Associates, Inc. 19 th International EMME/2 Users’ Conference – 21 October 2005 Derivation of Travel Demand Elasticities from a Tour-Based Microsimulation.
Application of an Activity-based Model for a Toll Road Study in Chicago Matt Stratton Parsons Brinckerhoff May 19, 2015.
Bharath Paladugu TRPC Clyde Scott Independent Consultant
TRANSIMS Version 5 Network Files January 20, 2011 David Roden – AECOM.
A Dynamic Traffic Simulation Model on Planning Networks Qi Yang Caliper Corporation TRB Planning Application Conference Houston, May 20, 2009.
DVRPC TMIP Peer Review Dynamic Traffic Assignment (DTA) Oct. 29 th, 2014.
Interstate 2.0: a 21 st -Century Network Financed by All- Electronic Tolling by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation.
Comparative Analysis of Traffic and Revenue Risks Associated with Priced Facilities 14 th TRB National Transportation Planning Applications Conference.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Analysis of the IH 35 Corridor Through the Austin Metropolitan Area TRB Planning Applications Conference Jeff Shelton Karen Lorenzini Alex Valdez Tom Williams.
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D.
SHRP2 Project C05: Final Report to TCC Understanding the Contribution of Operations, Technology, and Design to Meeting Highway Capacity Needs Wayne Kittelson.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
1 Assessing Travel Demand for Exclusive Truck Facilities Matthew Roorda, University of Toronto Michael Hain, University of Toronto Glareh Amirjamshidi,
A Sketch Planning Assessment of Managed-Lane Options for the I-5 Freeway Corridor Master Plan William R. Loudon, DKS Associates.
The Current State-of-the-Practice in Modeling Road Pricing Bruce D. Spear Federal Highway Administration.
1 Forecasting Traffic for a Start-Up Toll Road 12 th TRB National Transportation Planning Application Conference May 18, 2009 David Schellinger, P.E. Vice.
1 Toll Modeling Analysis for the SR 520 Bridge Replacement and HOV Project 19 th Annual International EMME/2 Users’ Conference October 19-21, 2005 Presented.
1 520 Tolling Implementation Committee Cascadia Center for Regional Development Beyond Oil Conference Thursday, September 4, 2008 Richard Ford, Commissioner.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
Transportation Revenue Sources Presentation to the Discovery Institute October 6, 2004 Amy Arnis Deputy Director Strategic Planning and Programming Washington.
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
WSDOT’s Dynameq Projects
I-77 High-Occupancy Toll Lanes
Jim Henricksen, MnDOT Steve Ruegg, WSP
Slugging in the I-395 Corridor
Current and proposed HOT facilities update
  Advanced Tools to Assess Managed Toll Lane Operations Model Task Force Toll Subcommittee Meeting September 16, 2010.
Presentation transcript:

Modeling Various Tolling Schemes Using Emme: Seattle Experience Andrew Natzel, Parsons Brinckerhoff Bhanu Yerra, Parsons Brinckerhoff Craig Helmann, Puget Sound Regional Council Youssef Dehghani, Parsons Brinckerhoff Model City nd International Emme Users' Conference September 16, 2011 | Portland, Oregon

Presentation Outline Purpose Toll modeling methods/approaches Seattle Experience Four toll feasibility studies Reflections & thoughts

Presentation Purpose Tolling as a tool to finance highways and manage congestion Toll feasibility studies in the Seattle Region Challenges faced in modeling highway tolls Future modeling needs

Toll Modeling Methods/Approaches Ad-hoc non-network-based methods 4-Step modeling process Primary reliance on route choice effect using generalized costs assignment process Reliance on toll choice models capable of simulating toll cost effect discretely thru trip distribution, mode choice and assignment steps Activity-based models (ABM) Role of mesoscopic & mirco-simulation models

Data Requirements Survey data Revealed/Stated Preference (VOT) Counts data Speed measurements Network update/refinement Model estimation & validation

Model/Approach Selection Assess toll study level & focus Sketch level, Toll feasibility or Investment Grade Congestion management vs. revenue maximization Tolling schemes (e.g., dynamic pricing, single- point, segment, etc.) Tolling general purpose lanes or HOV lanes Budget & schedule Determine appropriate method/approach

Seattle Experience All toll studies at feasibility/preliminary assessment level Current PSRC 4-step model deemed adequate Performed network refinement & validation analysis relevant to the study/project corridor

Tolling Schemes Studied Single point tolling Segmental tolling Ramp to ramp toll rates (OD level) Toll rates within a defined highway segment and between segments Distance-based tolling and class-specific tolling

Example Toll Feasibility Studies SR 99 Alaskan Way Viaduct Replacement Finance Plan SR 520 Toll Traffic and Revenue Technical Report – 2008 Sketch Level Feasibility Study – East Corridor Tolling Study (I-405/SR 167) I-5 Express Lane System Pre-Design Study

SR 99 Alaskan Way Viaduct FP A two-mile-long tunnel replacing the existing viaduct Surface street improvements Tolls as a funding mechanism Segmental tolling concept was evaluated

SR 99 Toll Scheme Montlake West Seattle Bridge Harrison St 20% Toll Lower Toll 100% Toll Lower Toll Valley St Dexter Way Alaskan Way N Lower tolls are applied only for vehicles not using the tunnel, but using the sections shown above. Tolling scheme shown was analyzed but is not planned for implementation.

SR 99 Toll Coding Seattle Freeway/ Spokane St Alaskan Way Northbound Southbound Royal Brougham Way Republic St Roy St Valley St Dexter Ave N Segmental Tolling Tunnel Tolling Aurora Ave N

SR 99 Toll Diversion Montlake 20% Toll N -34% -26% peak +17% +13% peak +5% +3% peak

SR 99 Highlights Capturing toll diversion on the local streets Level of Service issues on the local streets Diverting trips are captured by tolling ramps Dense network – difficult to capture true diversion Need for a mesoscopic and microscopic level of analysis ChallengesApproaches/Resolutions

SR 520 Tolling & Revenue Report Replacement of the aging floating bridge Other corridor and interchange improvements Tolls as a funding mechanism Segmental tolling concept was evaluated

SR 520 Toll Scheme Montlake Blvd Arboretum 84 th Ave 92nd Ave Bellevue Way 108 th Ave 20% Toll 10% Toll 100% Toll 20% Toll Tolling scheme shown was analyzed but is not planned for implementation.

SR 520 Toll Coding Lk Washington Bridge ABDE H C F G T1T1 T1T1 T2T2 T4T4 T3T3 T6T6 T6T6 T3T3 T4T4 T 1 – 20% Toll T 2 – 100% Toll T 3 – 10% Toll T 4 – 20% Toll T 6 – 20% Toll Dummy links for tolling

SR 520 – Extended Tolling Scheme Montlake Blvd Arboretum 84 th Ave 92nd Ave Bellevue Way 108 th Ave 20% Toll 10% Toll 100% Toll 20% Toll 30% Toll 40% Toll

SR 520 Highlights Imposing ramp-to-ramp, OD level tolls using currently available tools in Emme OD level tolls modeled using dummy links Dummy links concept worked because: Fewer number of interchanges Relatively simple tolling scheme Nearly impossible for more involved schemes or longer corridors ChallengesApproach/Resolutions

Sketch level feasibility: I-405/SR167 Variety of corridor improvement, including widening Tolls as a funding mechanism Tolling GP lanes as an alternative to HOT lanes Tolling I-405 and SR 167 at a simple segmental rate Quick study

I-405 Toll Scheme Montlake 20% Toll I-5 (South) to Bellevue SR 167 I-5 (North to Bellevue) N Tolling scheme shown was analyzed but is not planned for implementation.

I-405/SR 167 Highlights Perform the study within 3 weeks to support policy discussion Segregating the freeway movements to capture all toll movements on links Keep HOV trips toll-free and using the HOV links Minimize model changes: Network VOT Model Procedures Captured all the required tolling movements The coding scheme does not identify highway ramp movements by direction Assignment properly handled HOV trip assignment ChallengesApproaches/Resolutions

I-405/SR 167 Toll Coding Arterial through movement not separated from the ramp volumes Highway ramp movement separated – by entry/exit. Not by direction. I-5 GP I-5 HOV Arterial Arterial-HOV movement prohibited through turning restrictions

I-5 Express Lane System: Pre-Design Study 91-mile corridor Variety of highway improvements Tolls as a funding mechanism while creating travel options Three Toll Facilities HOV to HOT conversion New HOT lanes Tolling of existing Reversible Lanes

I-5 Toll Scheme Montlake 20% Toll 1 N Reversible Tolling scheme shown was analyzed, but will not necessarily be selected for implemenation.

I-5 Highlights Coding segment tolls with a new network coding convention Study area length, 91miles, along with the links involved Existing VOTs do not necessarily consider variability in VOT by trip Limited time and budget for model updates The coding convention allows for identification of highway ramp movements by direction directly on the links Captured all the required tolling movements, including open tolling Existing PSRC VOT used Extensive QC of turning movements and tolled links ChallengesApproaches/Resolutions

I-5 Express Toll Lanes Coding Arterial through movement not separated from the ramp volumes or GP-HOV connector I-5 GP I-5 HOV Arterial Arterial-HOV movement prohibited through turning restrictions

I-5 Express Toll Lanes Coding GP-HOV movements separated from interchange. GP-HOV movements segregated by directional movements. I-5 GP I-5 HOT Arterial GP-HOT movement controlled through turning restrictions

Reflections & Thoughts Assess Study Level & Focus Sketch Level Investment Grade Does it require micro-simulation? Available Modeling Procedures Data Collection Model Estimation/Validation Available Resources and Schedule

Reflections & Thoughts Focus on the study area Network refinements Validation checks

Reflections & Thoughts Procedural Limitations in the Software Ramp-to-ramp, OD level tolls A distribution of VOT

Questions?