Green Valley Corridor Road Network Issues  Regional traffic  Local traffic  Combined traffic.

Slides:



Advertisements
Similar presentations
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Advertisements

Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Lec 25: Ch2.(T&LD): Site planning
Interstate 2.0: a 21 st -Century Network Financed by All- Electronic Tolling by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation.
© 2001 Joint Venture : Silicon Valley Network. “Silicon Valley is at an important evolutionary stage... Our region needs to decide what kind of place.
Highways and Highway Components
European Commission Directorate-General for Energy and Transport n° 113/12/2002 IDEAS FOR COMMON CHARGING PRINCIPLES TO ALL MODES December 2002 Catharina.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
US 52 Corridor Study Public Meeting November 15, 2010.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
GMVUAC Presentation June 1, 2009 David Mark and Jim Ishimaru Road Services Division King County Department of Transportation.
11 Tunde Balvanyos, Ph.D. Bus Rapid Transit Coordinator, Pace APTA BRT May 2009.
Module 7 Exercise Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Byron Becnel LA DOTD June 16, Microscopic simulation models simulate the movement of individual vehicles on roads It is used to assess the traffic.
9/7/2012 MBS UU.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
US 1 CORRIDOR STUDY AND PROJECT PRIORITIZATION PROCESS Augusta, GA November 29, 2012 Jeff Carroll CDM Smith Georgia Association of MPOs Annual Conference.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.
North Carolina’s Integration of 511 and Workzone Information Jo Ann Oerter State Technology Implementation and Maintenance Engineer North Carolina Department.
Enhanced analytical decision support tools The Scheme level Final workshop of the DISTILLATE programme Great Minster House, London Tuesday 22 nd January.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Network Topologies.
Limebank Road Environmental Assessment Study February 19, 2003.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Research | consulting | technology safety and efficiency in transport through knowledge Moving people and freight in the urban.
Analysis of Responses February  Number Issued: 316  Number Returned: 141  Response Rate: 44.6%
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Transportation Concurrency The provision of “adequate transportation facilities” Integrating land use and transportation.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Community Development Department Construction Phase BULLDOG DRIVE.
Interstate 2.0: a 21 st -Century Network Financed by All- Electronic Tolling by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
MED SR 18 Corridor Project MED PID October 13, 2015.
Chapter 6: Intersections
Complete Streets Training
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Rebuilding Rhode Island’s Aging Bridges with Truck Tolling
WSDOT’s Dynameq Projects
RPS Modeling Results Second Round
Evaluation and Re-Design Haifa and Yafa Streets.
TVTC Impact Fee Update Nexus Study January 30, 2008
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
ROADS Services Training Group
Issaquah-Fall City Road
Design Criteria CTC 440.
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Presentation transcript:

Green Valley Corridor Road Network Issues  Regional traffic  Local traffic  Combined traffic

Western Route End Point & Waypoint Area Eastern Route End Point & Waypoint Area

A growth issue: Road Network too sparse for good service in urban & suburban land use  Inadequate capacity on critical links causes congestion & delays.  Lack of parallel links limits road network capacity.  Lack of alternate routes produces additional delays during heavy traffic, road obstructions, and closures.

Sacramento County’s urban & suburban road network is dense, El Dorado County’s road network is sparse.

Icons for final slides, about viability of possible alternative solutions (yes, it’s tongue-in-cheek ratings for serious business) Goes down in flames Flies like a dodo This pig might fly Flies great, costs zillions, annoys some folks Flies a few feet & plops, just damage control It flies. Not dazzling, but gets us somewhere, annoys other folks

Ways to improve traffic on Green Valley Road Reduce traffic volume, no changes to road: Buy back existing development & revert it to open space or rural land uses. Try to charge tolls for through traffic. Starting with the silliest proposal and groping onward toward a solution… Don’t worry about traffic. Just continue approving more new development along the Green Valley Corridor. Institute a moratorium on new development until the tooth fairy funds road system improvements.

Ways to improve traffic on Green Valley Road Less-simple solutions have ranges of viability (2 icons), they depend on details… Build new small roads, including at least one additional arterial to relieve Green Valley traffic. Overall, give EDH a denser, better-connected road network Theoretically feasible, satisfies multiple objectives. Catch: $$$$. EDH roads could devour the entire County budget. Rebuild a lot of Green Valley Road to add capacity. -- Widen 2-lane to 4 or 5 lanes, Francisco to Cameron Pk. -- Replace signalized intersections with roundabouts. -- Be ready to widen the existing 4 lane section (west of Salmon Falls) to 6 lanes SOON. Feasible and not cheap, but cheaper than going for new roads to offload Green Valley.