Assembly Line Balancing Boeing Corporation

Slides:



Advertisements
Similar presentations
Graph. -traffic modeling MAXIMUM FLOW -shortest (fastest) route SHORTEST PATH -efficient distribution, logistics, pickup/delivery HAMILTONIAN PATH/CYCLE,
Advertisements

Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
Tutorial 2 Project Management Activity Charts (PERT Charts)
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
9 Layout Strategies PowerPoint presentation to accompany
Chapter 4: Manufacturing Processes. Learning Objectives How production processes are organized Trade-offs to be considered when designing a production.
Queuing Theory Worthmore Department Store
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
3rd EDITION STATE l UNIVERSITY
9 Layout Decisions PowerPoint presentation to accompany
MGT3303 Michel Leseure Facility Decisions Learning objectives: –To discuss facility location decisions –To discuss capacity planning –To discuss factory.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
f has a saddle point at (1,1) 2.f has a local minimum at.
AB EH C D F G I 10 Min Example Balance for 3 units/hour and compute theoretical min number of stations (primary: longest task time; secondary:
COMSOAL Computer Method for Sequencing Operations for Assembly Lines Lindsay McClintock OPERMGT 345 – 004 May 6, 2003.
Assembly Line Balancing Applied Management Science for Decision Making, 1e © 2012 Pearson Prentice-Hall, Inc. Philip A. Vaccaro, PhD.
Operations Management Layout Strategy
This is the graph of y = sin xo
Chapter 9 : Layout Strategies
Scheduling (Part II) Mohd Zaidan bin Abdul Aziz B
Line Balancing Problem
Network Analysis Terminology
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 5 Manufacturing and Service Process Structures McGraw-Hill/Irwin.
Assembly Line Balancing
Assembly Line Balancing
Process Selection and Facility Layout
9 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout Design Considerations  Higher utilization of space, equipment, and people  Improved.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Process Layout Chapter 7 July 20, 2005.
Line Balancing. Example problem - Golf Club mfg/assy firm Customer demand requires production volume of 24 finished clubs in an 8 hour shift Customer.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Assembly Line Balancing Introduction to Industrial Engineering.
Assembly Line Balancing
1 Lean Office – Layout & Cells
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Homework Assignment Simulation Modeling The Cobbler Problem MGMT E Operations and Logistics Management Due September 25 th.
Project Management in Practice
Slide 1 Chapter 05 – Part 2 Data Modeling with the Entity-Relationship Model.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Speeding up and slowing down f = ma Terminal velocity.
5-1 Scheduling The Project. Outline: 5-2  Project network diagrams  Identifying critical paths and activities  Determining activity slack times  Gantt.
Revision BUSI 2301 B. Averaging methods b). Moving average - sample problem Compute a three-period moving average forecast for period 6, given the demand.
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Nursing homework help BEST ASSIGNMENT.
Supply Chain Customer Order Decoupling Point
GSCM 520 RANK Success Our Tradition/gscm520rank.com
GSCM 520 RANK It's Your Life/gscm520rank.com
GSCM 520 RANK Let's Do This /gscm520rank.com
Additional line balancing notes
Analytical Tools for Process Analysis and Improvement
1. Draw the precedence diagram.
ASSIGNMENT NO.-2.
GSCM 520 Competitive Success/snaptutorial.com
GSCM 520 Innovative Education--snaptutorial.com
GSCM 520 Education for Service/snaptutorial.com
GSCM 520 Teaching Effectively-- snaptutorial.com.
Assembly line balancing
FACILITY LAYOUT Facility layout means:
דיני חברות ד"ר ויקטור ח. בוגנים
Lecture Objectives: Look at the cooling side of air condition
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Section 6 – Critical Points and Extrema
EDLC(Embedded system Development Life Cycle ).
Using the queuing-theoretic approximations for the performance of “push” and “pull” production lines to address Design Problems.
Unit 3 Review (Calculator)
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
Obj: graph parabolas in two forms
Speeding up and slowing down
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
Presentation transcript:

Assembly Line Balancing Boeing Corporation Due October 30th Homework Assignment Assembly Line Balancing Boeing Corporation MGMT E-5065 Operations and Logistics Management

Boeing Corporation Task Performance Time ( minutes ) Boeing wants to develop a precedence diagram for an electrostatic wing component that requires a total assembly time of 66 minutes. Task Performance Time ( minutes ) Precedence Relationship A 10 - B 11 C 5 D 4 E 12 F 3 C,D G 7 H I G,H

Boeing Corporation REQUIREMENT: Calculate the maximum allowable cycle time, assuming 480 productive minutes of work available per day, and a daily production quota of 40 units each day. Balance the line under the lot assignment heuristic. Calculate the efficiency under the above.

Boeing Corporation REQUIREMENT: Calculate the minimum allowable cycle time, assuming 480 productive minutes of work available per day, and a daily production quota of 40 units each day. Balance the line under the lot assignment heuristic. Calculate the efficiency under the above.

Boeing Corporation REQUIREMENT: If Task ‘I’ requires 6 minutes ( instead of 3 minutes ) : Calculate the maximum allowable cycle time, assuming 480 productive minutes of work available per day, and a daily production quota of 40 units each day. Balance the line under the lot assignment heuristic. Calculate the efficiency under the above.

Boeing Corporation REQUIREMENT: If Task ‘I’ requires 6 minutes ( instead of 3 minutes ) : Calculate the minimum allowable cycle time, assuming 480 productive minutes of work available per day, and a daily production quota of 40 units each day. Balance the line under the lot assignment heuristic. Calculate the efficiency under the above.

Boeing Corporation REQUIREMENT: If Task ‘I’ requires 6 minutes ( instead of 3 minutes ) : Calculate the maximum allowable cycle time, assuming 480 productive minutes of work available per day, and a daily production quota of 40 units each day. Balance the line under the shortest operating time assignment heuristic. Calculate the efficiency under the above.

Boeing Corporation REQUIREMENT: If Task ‘I’ requires 6 minutes ( instead of 3 minutes ) : Calculate the minimum allowable cycle time, assuming 480 productive minutes of work available per day, and a daily production quota of 40 units each day. Balance the line under the shortest operating time assignment heuristic. Calculate the efficiency under the above.