WHAT HAPPENS TO SATELLITE NETWORK FILINGS IN RADIOCOMMUNICATION BUREAU.

Slides:



Advertisements
Similar presentations
World Meteorological Organisation Use of Radio Spectrum for Meteorology: Weather, Water and Climate Monitoring and Prediction Jean-Michel Rainer.
Advertisements

International Telecommunication Union Yvon HENRI Head, Space Services Department, Radiocommunication Bureau WMO Workshop 2006, Geneva Orbit / Spectrum.
World Meteorological Organisation Use of Radio Frequency bands for meteorological systems Jean-Michel Rainer.
RADIOCOMMUNICATION BUREAU BROADCASTING-SATELLITE SERVICE PLANS AND LISTS by Mark Griffin BR/SSD/SNP.
International Telecommunication Union World Radiocommunication Seminar (Geneva, 6-10 December 2010)
Slide 1 World Radiocommunication Seminar Geneva, November 2004 AP30/30A Plans & Lists Workshop Examination of a Satellite Network submitted under.
BR Information Meeting on RRC-04/05 (Geneva, 18 – 19 September 2003) RRC-04/05: Terms of reference and scope of work T. GAVRILOV Radiocommunication Bureau.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Results.
BR/TSD Accra 2005 BCD Salient issues related to the production of the draft plan 10 – 14 October 2005 Accra David Botha Workshop for the African Countries.
Preparation of requirements for the production of Draft Plan Borislav M. Rackov ITU/BR/TSD/TPR Preparation of requirements for the production of Draft.
Notification of Digital requirements for the Draft Plan – Damascus, August Regional Information Meeting and Workshop related to the RRC-06.
BR/TSD دمشق 2005 BCD Salient issues related to the production of the draft plan أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of.
Regional Radiocommunication Conference 2006 (RRC-06) Regulatory and Procedural aspects François Rancy Chairman, Regulatory and Procedural Group.
Conversion of analogue assignments Protection of existing and planned services Conversion of analogue assignments Protection of existing and planned services.
Yvon Henri Radiocommunication Bureau ITU.
1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013.
1. The ITU Radiocommunication Sector (ITU-R) will remain the unique and universal convergence and regulatory centre for worldwide radiocommunication matters.
ITU-R World Radiocommunication Seminar Geneva, 8–12 December 2008 SpaceQry Workshop Space Query and Extract System Steve Boswell Space Administrative Software.
The Radiocommunication Data Dictionary (RDD) ITU-R SM.1413 Presented by David Barrett.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Department of Children and Families Care Provider Background Screening Clearinghouse.
WRC-12 Preparation CPG Chairman /
Standards experts. Accreditation solutions. Andrea Spencer Coordinator, WTO/NAFTA Enquiry Point (Canada) TBT Special Meeting on Procedures for Information.
EI PRODUCT WORKFLOWS. BOOKING Current Process CUSTOMERWWAMEMBER Booking Request (EDI ) Receives Booking Request MEMBER Folder TRANSFE R (Based on CustomerControlCode.
Teaching American History Grant Program (TAH) FY 2009 Grants.gov.
National Science Foundation 1 Dr. Tomas E. Gergely Electromagnetic Spectrum Manager National Science Foundation Registration of Radio.
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
Chris Hose Geoff McMillen
Secretary of State Voting System Security Standards Juanita Woods Secretary of State Elections Division HAVA Information Security.
Department of Commerce Bureau of Industry and Security “EAR Regulatory Update” Arlington, Virginia June 10, 2008 Timothy Mooney Export.
United Nations Procurement Division
How is Technical & Regulatory Examination carried out in the BR - a detailed view.
Spectrum for UAS UAS at WRC-12 European WRC-12 preparation Martin Weber, Federal Network Agency, Germany EU UAS Panel Workshop Brussels,
Processing and circulation of notifications: the experience of the Secretariat Special Meeting on Procedures for Information Exchange Geneva, 2 November.
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
Communications Assistance for Law Enforcement Act & Higher Education: or How I Learned to Stop Worrying and Love Wiretaps Terry Hartle American Council.
Information Asset Registries of Latvia Secretariat of e-government affairs Riga | 26 th October, 2007.
VALIDATION OF PLANNING & OTHER APPLICATIONS A brief guide for Planning Agents.
Passive Services and the ITU Klaus Ruf DLR, RD-RK Bonn-Oberkassel ESF-sponsored Workshop "Active Protection of Passive Radio Services", Cagliari, October.
Reference Database Presented by Fabrice Evangelisti.
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
Legal Holds Department of State Division of Records Management Kevin Callaghan, Director.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.20 – High Altitude Platform Stations (HAPS) Presenter: Dick Butler.
Tunis, Tunisia, December 2015 ITU Training Course on “Homologation Procedures & Type Approval Testing for Mobile Terminals for AFR Region”
CLOSE PROJECT OR PHASE CLOSING PROCESS GROUP PROJECT INTEGRATION MANAGEMENT.
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
1. 2 Notification of frequency Assignments for recording in the Master Register Prepared by : Eng.yasir Mohammed Bashar
Agenda item 9.2 On any difficulties or inconsistencies encountered in the application of the Radio Regulations (non-ESOMPS)
FIELD TRAINING SESSION 2 (OPENING/CLOSING/RECONFIGURING SCHOOLS) 9:05-9:30 Ethan Taylor Dept. of Administration and Finance Coordinator of Budgets and.
THE K-12 LEARNING INFRASTRUCTURE PROGRAM & WI-FI UPGRADE INITIATIVE FEBRUARY 18, 2016.
Omnibus Rate Case Implementation Pricing and Classification Implementation Pricing and Product Design, USPS - HQ.
Department of Children and Families Care Provider Background Screening Clearinghouse.
Radiocommunication Bureau International Telecommunication Union
Non Planned Space Services (Coordination and Notification procedures)
CIS 518 STUDY Lessons in Excellence-- cis518study.com.
Meghan Haukaas Team: Brett Brist | Chris Ruiz | Ronghui Zuo
IMT-Advanced Opening Report
Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8) Khalid Al Awadhi.
“Homologation Procedures & Type Approval
Coordination of Satellite networks
Space Query and Extract System
To convert API to notification
RR-TAG Liaison Report IEEE
Instructions for New Contractors Construction Division
Possible Future Agenda Items
Ownership of Satellites
Agenda Item Overview & draft India proposal
SIG RFC 2019 Relevant Summary
WRC 19 Agenda Item 7 Issue A New Delhi 11 June 2019.
Presentation transcript:

WHAT HAPPENS TO SATELLITE NETWORK FILINGS IN RADIOCOMMUNICATION BUREAU

Administration WHAT HAPPENS IN BR TO SATELLITE NETWORK FILINGS API CR N RES 49 BR Central Registry SSD Registry Documentum Notices for Advance Publication of Information, Coordination, Notification & Resolution 49 submitted by the Administration to the BR in ELECTRONIC FORM (Refer Resolution 55 of Radio Regulations). Keeps ALL the correspondence in the BR, in electronic form Notice forms: AP4/V: coordination not required (non-GEO) AP4/VI: coordination required (GEO, non-GEO)

Administration WHAT HAPPENS IN BR TO SATELLITE NETWORK FILINGS API CR N RES 49 BR Central Registry SSD Registry Documentum First Validation & Receivability check Correspondence with Admns. Regulatory date of receipt Issue of Cost-Recovery invoices Notices are checked for: Completeness (ANNEX 2 of APP 4 - RR) Receivability ( Para of the ROP) Validation check is applied using the validation software. Receipt of the Notice is acknowledged. Formal date of receipt is then established.

Administration WHAT HAPPENS IN BR TO SATELLITE NETWORK FILINGS API CR N RES 49 BR Central Registry SSD Registry Documentum First Validation & Receivability check Correspondence with Admns. Regulatory date of receipt Issue of Cost-Recovery invoices Data Management Graphical Data Capture GIMS Data Base SNS Data Base Published –`As Received’ BR IFICBR WEBSNL Data (API, CR, N, RES 49) is captured & is made available by the BR within 30 days (RES 55 of RR) as: - BR IFIC (Space services) CD-ROM - ITU website ITU Radiocommunica tion SNL PART-C at: /ITU- R/space/snl/

Administration WHAT HAPPENS IN BR TO SATELLITE NETWORK FILINGS API CR N RES 49 BR Central Registry SSD Registry Documentum First Validation & Receivability check Correspondence with Admns. Regulatory date of receipt Issue of Cost-Recovery invoices Data Management Graphical Data Capture GIMS Data Base SNS Data Base Second & Final Validation Check Coord. Req. & Notif. Coord. Req. & Notif. Published –`As Received’ BR IFICBR WEBSNL API, RES 49 Publish BR IFIC API/A, API/B, RES49 Issue of Cost-Recovery Invoices for API/A BR WEB Preparation of Notices (Coord. Request & Notification) for Technical & Regulatory exam.

Administration WHAT HAPPENS IN BR TO SATELLITE NETWORK FILINGS API CR N RES 49 BR Central Registry SSD Registry Documentum First Validation & Receivability check Correspondence with Admns. Regulatory date of receipt Issue of Cost-Recovery invoices Data Management Graphical Data Capture GIMS Data Base SNS Data Base Second & Final Validation Check Coord.Req. & Notif. Coord. Req. & Notif. Published –`As Received’ BR IFICBR WEBSNL API, RES 49 Publish BR IFIC API/A, API/B, RES49 Issue of Cost-Recovery Invoices for API/A BR WEB Publish in BR IFIC PART-1S Technical & Regulatory Examination COORD. REQUEST NOTIF. REQUEST

Administration WHAT HAPPENS IN BR TO SATELLITE NETWORK FILINGS API CR N RES 49 BR Central Registry SSD Registry Documentum First Validation & Receivability check Correspondence with Admns. Regulatory date of receipt Issue of Cost-Recovery invoices Data Management Graphical Data Capture GIMS Data Base SNS Data Base Second & Final Validation Check Coord.Req. & Notif. Coord. Req. & Notif. Published –`As Received’ BR IFICBR WEBSNL API, RES 49 Publish BR IFIC API/A, API/B, RES49 Issue of Cost-Recovery Invoices for API/A BR WEB Publish in BR IFIC PART-1S Technical & Regulatory Examination COORD. REQUEST NOTIF. REQUEST TASKS WITHIN THE RED DOTTED LINE ARE CARRIED OUT WITHIN THE SSD (SPACE SERVICES DEPT.) BY THE DIVISION CALLED `SPACE PUBLICATION & REGISTRATION DIVISION’ (SPR).

Administration WHAT HAPPENS IN BR TO SATELLITE NETWORK FILINGS API CR N RES 49 BR Central Registry SSD Registry Documentum First Validation & Receivability check Correspondence with Admns. Regulatory date of receipt Issue of Cost-Recovery invoices Data Management Graphical Data Capture GIMS Data Base SNS Data Base Second & Final Validation Check Coord.Req. & Notif. Coord. Req. & Notif. Published –`As Received’ BR IFICBR WEBSNL API, RES 49 Publish BR IFIC API/A, API/B, RES49 Issue of Cost-Recovery Invoices for API/A BR WEB Publish in BR IFIC PART-1S Technical & Regulatory Examination COORD. REQUEST NOTIF. REQUEST We now move on to the Technical & Regulatory examination of notices for Coordination and Notification. These are dealt within the SSD (Space Services Department) by the Division called `Space Services Coordination Division’ (SSC).