May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres1 Pixel Electronics slides for UCSC Cover 0.13 FE chip ROD Other Activities (except.

Slides:



Advertisements
Similar presentations
The ATLAS Pixel Detector
Advertisements

Radiation Tolerance D. C. Christian, J. A. Appel, G. Chiodini,
Nov. 7, 2002The SVX4 Chip -- M. Garcia-Sciveres1 The SVX4 Readout Chip Vertex 2002 M. Garcia-Sciveres, Lawrence Berkeley National Lab. SVX SVX
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
Chronopixel R&D status – May 2014 N. B. Sinev University of Oregon, Eugene In collaboration with J.E.Brau, D.M.Strom (University of Oregon, Eugene, OR),
GOSSIPO-2 chip: a prototype of read-out pixel array featuring high resolution TDC-per-pixel architecture. Vladimir Gromov, Ruud Kluit, Harry van der Graaf.
Timepix2 power pulsing and future developments X. Llopart 17 th March 2011.
ACES Workshop 3-4 March, 2009 W. Dabrowski Serial power circuitry in the ABC-Next and FE-I4 chips W. Dabrowski Faculty of Physics and Applied Computer.
Status of opto R&D at SMU Jingbo Ye Dept. of Physics SMU For the opto WG workshop at CERN, March 8 th, 2011.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
Nov. 10, 2005UCSC US ATLAS Upgrade meeting -- Ely, Garcia-Sciveres1 DC to DC Power Converion R. Ely and M. Garcia-Sciveres Atlas Upgrade Workshop Santa.
2. Super KEKB Meeting, DEPFET Electronics DEPFET Readout and Control Electronics Ivan Peric, Peter Fischer, Christian Kreidl Heidelberg University.
1 ACES Workshop, March 2011 Mark Raymond, Imperial College. CMS Binary Chip (CBC) status 130nm CMOS chip for short strip readout at sLHC contents introduction.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
VI th INTERNATIONAL MEETING ON FRONT END ELECTRONICS, Perugia, Italy A. Dorokhov, IPHC, Strasbourg, France 1 NMOS-based high gain amplifier for MAPS Andrei.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
Fully depleted MAPS: Pegasus and MIMOSA 33 Maciej Kachel, Wojciech Duliński PICSEL group, IPHC Strasbourg 1 For low energy X-ray applications.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
Specifications & motivation 2  Lowering integration time would significantly reduce background  Lowering power would significantly reduce material budget.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Common ATLAS/CMS Electronics Workshop March, 2007 W. Dabrowski Atlas ABCNext/SiGe W. Dabrowski Faculty of Physics and Applied Computer Science AGH.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
A.A. Grillo SCIPP-UCSC ATLAS 3-May Evaluation of SiGe Technology – Status Report US-ATLAS Upgrade Meeting Evaluation of SiGe Technology - Status.
65 nm CMOS analog front-end for pixel detectors at the HL-LHC
Thanushan Kugathasan, CERN Plans on ALPIDE development 02/12/2014, CERN.
Development of Pixel Phase 2 chip. Goals New Pixel Chip needed to go beyond the Phase 1 baseline chip – Should be the solution for Phase 2 pixel – Should.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
ASIC Activities for the PANDA GSI Peter Wieczorek.
TIMELINE FOR PRODUCTION 2  Need to be ready for production end next year  => submission of final mask set ~September 2015  Would like one more iteration.
BeamCal Electronics Status FCAL Collaboration Meeting LAL-Orsay, October 5 th, 2007 Gunther Haller, Dietrich Freytag, Martin Breidenbach and Angel Abusleme.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
UPDATE ON CLICPIX2 DESIGN Pierpaolo Valerio Edinei Santin
-1-CERN (11/24/2010)P. Valerio Noise performances of MAPS and Hybrid Detector technology Pierpaolo Valerio.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
May 2007DC-DC --- US ATLAS Upgrade R&D --- Garcia-Sciveres1 DC-DC converter R&D US ATLAS Upgrade UCSC May 2007.
Eleuterio SpiritiILC Vertex Workshop, April On pixel sparsification architecture in 130nm STM technology ILC Vertex Workshop April 2008 Villa.
FPIX2: A rad-hard pixel readout chip for BTeV David Christian Fermilab Homestead September 14, 2000 Vertex 2000 f.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
Jorgen Christiansen, CERN PH-ESE 1.  EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not.
R. Kluit Nikhef Amsterdam R. Kluit Nikhef Amsterdam Gossopo3 3 rd Prototype of a front-end chip for 3D MPGD 1/27/20091GOSSIPPO3 prototype.
TIMEPIX2 FE STUDIES X. Llopart. Summary of work done During summer I have been looking at a possible front end for Timepix2 The baseline schematic is.
RD53 1.  Full/large demonstrator chip submission ◦ When: 2016 A.Early 2016: If chip must have been fully demonstrated in test beams for TDRs to be made.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
Comparison of the AC and DC coupled pixels sensors read out with FE-I4 electronics Gianluigi Casse*, Marko Milovanovic, Paul Dervan, Ilya Tsurin 22/06/20161.
FE-I4 chip development status ATLAS Upgrade, R.Kluit.
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
SVT – SuperB Workshop – Annecy March 2010
Pixel front-end development
Charge sensitive amplifier
LHC1 & COOP September 1995 Report
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
PID meeting SCATS Status on front end design
ATPIX65A: presentation and very preliminary results
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
ME1/1 Electronics Upgrade
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres1 Pixel Electronics slides for UCSC Cover 0.13 FE chip ROD Other Activities (except DC-DC)

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres2 Progress in FY07 Epilogue from 2004 test chip Preamp chip submission & testing Workshop at CERN Work-plan for full size chip submission –Includes non-US manpower CPPM: Bonn: Genova: –US to focus on unique capabilities Analog design Architecture Full chip integration

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres test chip epilogue CPPM has prepared an SEU measurement setup using the LBNL um test chip. They are irradiating with 20GeV protons at CERN right now to extend the studies done at the LBNL 88” cyclotron in FY06. LBNL simply provided test boards, a few chips, and advice, but we are getting a great deal in return More on collaboration with European institutes later…

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres4 Analog test chip submitted Feb nm bulk CMOS 840 pixels complete with threshold and bias registers. 2 basic charge-integrating amplifier designs: –resistor continuous reset. –current source continuous reset. nominal current 22  A/pixel –Goal for final chip is ~10  A/pixel Simulated ENC ~200e- for 400fF input load and ~20ns peaking time –Exact value depends on many tunable parameters 2.8mm 3.6mm

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres5 Analog test chip plans Expected chip delivery late May Test board in fabrication now Initial “checkout” by Abder at LBNL Distribution of chips to other test efforts in June/July –Interest from European collaborators to participate in testing Some irradiation possible in FY07, but mainly in 08 –Hope that European colleagues will set up irradiation tests in FY08- no project fund request for this. –Note that all transistors are linear (with guard rings around Nmos) Critical initial measurements expected –Threshold dispersion –Uniformity across array. Operating margin. –Current consumption, noise and timewalk

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres6 Pixel Upgrade Electronics Workshop Held on March 22 at CERN following ATLAS-CMS Electronics (ACES) workshop electical engineers not presently involved in pixels attended this meeting –CPPM, Bonn, Nikef, Genova –Clearly there is interest Work Plan drafted in April to foster efficient collaboration –First global chip designers’ pone meeting to go over this plan isnext week

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres7 Plans for FY08 Work-plan milestones –Architecture definition: September 2007 –Initial Design review: January 2008 –Final Design review: September 2008 –First full size chip submission: December 2008 LBNL engineering manpower –100% Abder Mekkaoui: Lead IC designer, analog front end, integration –40% Dario Gnani: IC designer, High level description, readout logic –30% George Chao: Pad frame –10% Peter Denes: Organization, pads. (no cost to project) LBNL purchases/fabrications –Assume a second iteration of front end design (if nothing else to fine tune lower current modifications): $65K including test board.

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres8 FY09 Continue same level of design effort until submission –For Dec. submission this is 25% of FY08 manpower cost Reduced effort still needed after submission in FY09 for simulation and testing –Take 50% of FY08 cost for remaining 75% of FY09 Finally need to cover test board design (based on existing TPLL) and fabrication –EE, drafter, and board fab cost. –Student-like personnel to operate test setup Cost of engineering run to be paid out of BL replacement ATLAS project, which is M&O-B with the usual sharing. –20% of $400K

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres9 LBNL FE chip Cost breakdown FY08-09

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres10 Chip Requirements Pixel size50 x 250 m2m2 Bump pad diameter12 mm InputDC-coupled negative polarity Normal pixel input capacitance range* fF Long pixel input capacitance range* fF In-time threshold with 20ns gate4000e Two-hit time resolution400ns DC leakage current tolerance100nA Single channel ENC sigma (400fF)300e Tuned threshold dispersion100e Analog supply AA Radiation tolerance200MRad Average hit rate200MHz/cm 2 Acquisition modeData driven with time stamp Time stamp precision8bits Readout initiationTrigger command Max. number of continuous triggers16 Trigger latency3.2 ss Single chip data output rate160Mb/s * Low value given by planar sensors and high value by 3D. Very difficult. Critical for power distribution and material High luminosity and small radius. Wants new ROD

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres11 ROD development ROD total bandwidth limited by output s-Link at 1.28Gb/s. This is only enough for 8 chips at 160Mb/s each. This would have to fed into the ROD on 32 40Mb/s inputs. To read out a single R=4cm layer would need 94 RODs! It would be much cheaper and reliable to build fewer new, faster RODs using modern components Can keep the basic data flow architecture, but simply implement within new FPGA. This is NOT yet an urgent need. Could in principle start in FY09 instead of FY08, but –There is available manpower in FY08 –Early design would feed-back into chip I/O architecture, leading to a better system –There is synergy with PLL-based test setup needs

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres12 ROD & PLL test setup Interface definition is common to ROD and PLL test setup work, and is needed for chip architecture design. Expertise at LBNL is common to ROD and PLL test setup (same people) FY08 Tasks to be covered in the ROD/PLL area are: –Interface definition –Schematic layout of revised PLL test card –Initial look at new generation candidate FPGA for replacement ROD. FY08 requested resources (split between chip and ROD) –0.2 FTE under –0.083 FTE under ROD –10K M&S under ROD (Xilinix evaluation boards) FY09 requested resources (split between chip and ROD) –0.53 FTE under (includes PLL test card layout & fab) –0.3 FTE under ROD (prototype BOC and ROD design) –30K M&S under (PLL test card fab)

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres13 LBNL ROD Cost breakdown FY08-09

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres14 Other LBNL activities Progress in FY07 in –3D sensor testing and –Nanowire carpet hybrid pixel development 3D sensor testing –Minor involvement but very positive impact Established characterization setup at CERN enabling test work by U. of Oslo Provided test boards and debugging help Results from this work used to specify load requirement on new 130nm amplifier. –Will need to increase involvement in FY09 once first 130nm full chip is available Note request for “tester” support in FY

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres15 Nanowire carpet hybrid pixels W. Kim (molecular foundry), C. Tindall (eng.), H. Spieler (phys.), M. Garcia-Sciveres (phys.), and brand new addition CERN Medipix group 2007 Realized implementation Concept shown at UCSC upgrade meeting Nov. 2005

May 2007Pixel Electronics --- US ATLAS Upgrade R&D --- Garcia-Sciveres16 Nanowire carpet hybrid pixels (cont.) Funding sources so far –LBNL molecular foundry (FY06) –LBNL LDRD “surplus” (FY06) –ATLAS project R&D 0.07FTE (FY07) –No explicit ATLAS R&D request for FY08 Diode behavior of NW carpet sample fabricated by C. Tindall in FY07