The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.

Slides:



Advertisements
Similar presentations
Institute for Storage Ring Facilities, Aarhus,
Advertisements

HARP-B Local Oscillator
Proton Driver Magnet Power Supply System Cezary Jach BD/EE Support April 19, 2000.
Stephen Molloy RF Group ESS Accelerator Division
ISIS Accelerator Division
Lock-in amplifiers Signals and noise Frequency dependence of noise Low frequency ~ 1 / f –example: temperature (0.1 Hz), pressure.
Searching for CesrTA guide field nonlinearities in beam position spectra Laurel Hales Mike Billing Mark Palmer.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Lock-in amplifiers
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Servos Servos are everywhere. Elements of servo System -- to be controlled Sensor or detector -- measure quantity to be controlled Reference -- desired.
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
G J Hirst Central Laser Facility Status of the CTF3 Photoinjector Laser at CCLRC Central Laser Facility G J Hirst, M Divall, G Kurdi, W L Martin, I O Musgrave,
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Booster Low Level Modules, Timing and some Measurements.
Anders Sunesson RF Group ESS Accelerator Division
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
Beam loss and longitudinal emittance growth in SIS M. Kirk I. Hofmann, O. Boine-Frankenheim, P. Spiller, P. Hülsmann, G. Franchetti, H. Damerau, H. Günter.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
XII-th Collaboration MeetingJan 18, House1 LOI PROGRESS: JANUARY 2008 AT THE HALL 2 Yoshiro Irie, KEK for the LOI/SH collaboration.
Second Harmonic capture in the IPNS RCS: Transition from SH to fundamental rf operation during the acceleration cycle using CAPTURE_SPC Jeff Dooling Presented.
Other Utilities of ALBA LLRF
Measurements and potential improvements of the amplifier for the 10 MHz cavities G.Favia, V.Desquiens, M.Morvillo.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
1 Consequences of RF system failures during LHC beam commissioning T.Linnecar AB-RF.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
Diamond LLRF Activities Pengda Gu For DLS RF Group.
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
LONGITUDINAL COUPLED-BUNCH OSCILLATIONS IN THE RECYCLER RING PRESENTED BY: MUHED RANA UNIVERSITY OF MARYLAND, BALTIMORE COUNTY (UMBC), BALTIMORE, MD SUPERVISOR:
CarterFest 14 th July 2010 Stabilised Magnetrons Presentation to mark Professor Richard Carter’s contributions to Vacuum Electronics Delivered by Amos.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015.
RF acceleration and transverse damper systems
Challenges of Dual Harmonic RF Systems
The ISIS Dual Harmonic Upgrade
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
ISIS Synchrotron RF – Recent Work
Controls CBETA controls will extend existing EPICS control system
PSB rf manipulations PSB cavities
Upcoming longitudinal MDs
LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J
Y. Irie, KEK for the LOI collaboration
Superbeams with SPL at CERN
I Alexander Nass for the JEDI collaboration
Comparison of Fundamental and Dual Harmonic RF Buckets
Beam dynamics requirements after LS2
RF introduction Anders Sunesson RF group leader
PSB magnetic cycle 900 ms MeV to 2 GeV
Presentation transcript:

The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006

Add 2 nd Harmonic RF Component RF Phase → Dual Harmonic P Error → RF Phase → Single Harmonic Voltage → Enlarge Stable Region Optimise trapping Reduce Loss ISIS Dual Harmonic Acceleration 50% More Protons!

ISIS Dual Harmonic Acceleration The required Accelerating Field is given by V = Vo (sin  - .sin (2  +  ) ) The voltage on Cavity Gaps is V = -Vo sin (  ) + .Vo sin (2  +  ) where Vo and  are +ve.  and  chosen to minimise loss during injection, trapping and acceleration cycle

ISIS RF Systems - Overview 13kV pk at 12 1RF accelerating gaps +10kVpk at 8 2RF accelerating gaps

ISIS Dual Harmonic Acceleration Changing Bias Current changes inductance of ferrite & therefore resonant frequency of the cavity. Every 20ms:- InjectionExtraction Proton Energy70MeV800MeV Rotation Freq0.65 MHz1.55MHz 1RF Freq1.3 MHz3.1 MHz 2RF Freq2.6 MHz6.3 MHz Bias current200 A2000 A

2RF System Schematic LPRF Controls: Amplitude, Phase & Cavity Tuning Driver Amplifier Anode Power Supply 2 nd Harmonic high power RF Frequency Law Summing Amplifier Frequency Law Generator Master Oscillator 1.3 MHz MHz Dipole Search Coil Beam Phase Loop Radial Loop Trim Function Bunch Length Loop Existing Fundamental RF System  Phase Shifter Super- period Phase Splitter To Other 2 nd Harmonic Cavity LPRF Systems Phase Modulator 2 RF Level Controller Func Gen. 2 nd Harmonic Cavity Voltage Loop Func. Gen Phase Detector (Cavity Lock) Cavity Lock LPF 2 RF Detector RF Limiters Phase Detector (Cavity Tune) 2 Gated Summing Amplifier Delay Unit RF Summing Amplifier Phase Networks 2 2 nd Harmonic Cavity Phase Loop 2 nd Harmonic Cavity Tuning Loop Digital Signal Processor 2 nd Harmonic Beam Compensation Loop Sum Electrode Func. Gen. Func. Gen. LPF Variable Delay Variable Gain Frequency Doubler 2.6 MHz – 6.2 MHz 2 nd Harmonic low power RF HPD Cavity Cavity Bias Regulator Low Voltage Power Supply Cavity Lock Servo Cavity Gap A Voltage Monitor Summing Amplifier Phase Modulation and Delay Chassis 1RF 2RF A single Burle 4648VI tetrode is used to drive the 2RF cavity Phase Loop ALC Loop Beam Compensation Loop Cavity Tuning Loop

PSU - Splat! + PSU Tripping + ISIS Schedule + Machine Downtime

2RF Commissioning - Preliminary Results DHRF Acceleration beam intensity and beam loss (2 x 2RF Cavities) 93.5% 95%

Schematic of fundamental frequency and 2nd harmonic RF lock loop Var. 90  M. O. Phase Mod  az ±0  / 90  (  = 0  /-18  /- 36  ) Cavity Lock Phase Mod  Trim 1 RF. Cav.  Ref. 90  Cavity lock Phase Mod  Trim  Ref. Var.  Phase Mod Frequency Doubler Fundamental System 2RF System A B  az±45 Phase Mod  Det. 2 RF. Cav. Simulated by Cable Delay and Summing Amp

ISIS 2RF System Phase Modulation  2RF42RF52RF62RF8 Az Shift RF Phase RF Phase Phase offset for location of each system around ring

0° 2RF4 -90° +90° 2RF5 8:1 reduction in combined gap volts (simulated!) (SP4+SP5) / (SP4-SP5) ISIS 2RF System Phase Modulation 200V 10kV

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 0.2ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 0.3ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 0.4ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 0.5ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 0.6ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 0.7ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 0.8ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 0.9ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 1.0ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 1.5ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 2.0ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 3.0ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 4.0ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 5.0ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 6.0ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 7.0ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 8.0ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 9.0ms N - protons

Dual Harmonic Pulses Animated Version? DHRF Acceleration with 3 x 2RF cavities Beam 9.5ms N - protons

Theta Phasing Results 2RF SP5 APS Current SP4, 5 & 6 accelerating Theta = 0 Theta APS Current (with beam) 5Apk APS Current (no beam) 7Apk 0°0° -72° 2RF SP5 APS Current SP4,5 & 6 accelerating Theta

Challenges Solve Anode PSU tripping problem Complete cavity phasing tests DHRF Acceleration with all 4 2RF cavities Run 2RF Cavities reliably Increase beam current!