Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.

Slides:



Advertisements
Similar presentations
1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon.
Advertisements

Inefficiencies in the feet region 40 GeV muons selection efficiency   Barrel – End Cap transition 10th International Conference on Advanced Technology.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
Sez. di Lecce Universita` degli Studi del Salento The Muon Trigger in ATLAS Giovanni Siragusa On behalf of the ATLAS Muon Trigger group.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Muon LPC Meeting, 14 Sep Overview of Muon PRS Activities Darin Acosta University of Florida.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Marcello Bindi, on behalf of ATLAS Collaboration KRUGER 2010 : Workshop on Discovery Physics at the LHC 06/12/20101.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Performance and Physics Workshop Summary: Top and Muons Sarah Allwood-Spiers Glasgow ATLAS meeting June 2008.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Status of work of Russian groups in the ATLAS collaboration CERN-Russia Joint Working Group October 2009 A.Zaitsev, IHEP, Protvino.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Predrag Buncic CERN Future of the Offline. Data Preparation Group.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
U.S. ATLAS Project Manager’s Review with the Project Advisory Panel March 21-22, BNL Introduction Howard Gordon.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
Preparation for Running Outline Present Schedule Detector Preparation Requests for dedicated runs –Cosmics, Splashes, Alignment Muon Shifts Experts A.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
L. Pontecorvo1 The Muon New Small Wheels INFN CSN L. Pontecorvo.
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Muon works in the next months. MDT Up to May 15 Commissioning of EE From May 15 for (at least) 2 moths DCS works – Installation of new hardware – New.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Atlas: Upgrade Phase I Massimo Della Pietra.
HCAL M&O-B Budget CMS Finance Board
Japan Participation in Phase-II TDAQ Upgrade
Third Workshop on GEMs for CMS
for the transition region on behalf of the RPC upgrade group
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
Commissioning of the MUON Spectrometers in ATLAS and CMS
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
ATLAS Muon Spectrometer and
The First-Level Trigger of ATLAS
Preparation of the CLAS12 First Experiment Status and Time-Line
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Pierluigi Paolucci & Giovanni Polese
Plans for the 2004 CSC Beam Test
Presentation transcript:

Main priorities for the next years

Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main problems) All sub-systems have >97% active channels – High data taking efficiency and rather smooth operations No big data loss caused by Muons First system in ATLAS to reduce to 1 shifter per shift – High data quality In almost all data recorded the muon system is usable for physics

Where do we stand – Muon software: good performance and robustness Situation much improved in the last years and further improvements foreseen with the Third Chain – Muon Performance close to design level (but not yet there) Big improvements in Alignment and Calibration, further improvements will be slower Physics with muon signatures now as good or better then electrons (Z’, H  4 leptons) – Very good link between Muon System and Muon Combined Performance: MATF and MCP working together to optimize muon performance and deliver guidelines to physics analysis – A big Thank to all the people that have been strenuously working for the muon system and in particular to the Muon Steering Group TEAM, that made all this possible.

A word on muon organization To achieve these good results the Team work of the members of the Muon Steering Group was essential. I would keep the SG composition as it is: – Run Coordination – Software and DQA coordination – Hardware and Upgrade coordination – Sub-systems (MDT, CSC, TGC, RPC) – Operations (DCS, Trigger, DAQ) – Software (Core Software, Data Base, Reco.) – Data Quality – Performance (Calibration and alignment) …But I’m always open to suggestions form you.

A word on muon organization The creation of the Muon Analysis Task Force has been instrumental for the improvement of the understanding of the Muon performance. – We should always keep this task force alive Z mass MS-SA Barrel + MC with NO alignment errors + MC with realistic alignment + Data

Main issues for the muon spectrometer Hardware: – Some TGC chambers are dying Spare chambers being built but difficult to find the time to do the work in – PL should work together with TC to get in the shut down schedule the time for chambers replacement – RPC chambers have very fragile gas distribution Some Gas inlets crack and/or breaks down Some chambers are disconnected from HV Repair not possible for some chambers Need frequent access without toroidal field – Ensure that technical manpower will still be available for those repairs

Main issues for the muon spectrometer Hardware: – CSC: ROD rate limitations not yet fully established, it might be that this will become the bottleneck for high trigger rate ( ATLAS still aim to 100 kHz) operations – Need to take (very soon) a decision if we want to build a new ROD for the CSC to be installed during the shut down – MDT: EO chambers gas jumpers cracking increase in number and magnitude of gas leaks. – Ensure that yearly maintenance will keep this problem under control

Main issues for the muon spectrometer LVL1 trigger: Trigger rates higher than foreseen may exceed allowed bandwidth for muons at 25ns 8 TeV and L>10 34 cm -2 s -1 : – Barrel: High fake rate in low-Pt (less crucial at high L) – EC: trigger dominated by fakes even at high-Pt – Need to find a way to reduce it (partially cured by new Small wheel)

Main issues for the muon spectrometer Maintenance and operation: – The experts that built the detector and commissioned it are moving away from the operations. Need to form new experts. Motivate people to participate in this activities (OTP, Priorities for conference talks, etc.) – Shut down: Will have problems to find people working on the detector Need help from the institutes On the other hand, very good opportunity to form new experts and to have students to work on the hardware.

Upgrade(s) Phase 0 ( ): – Complete the EE wheel on side A (side C installed this winter) – Install trigger electronics in the BOF-BOG of sector 12 and 14 – Install new chambers for the elevator holes. – Install new alignment system for BEE-BIS7-8 chambers – Commissioning of this new hardware Follow the preparation and ensure manpower for these operations Interact with TC to ensure both technical help and time in the schedule Make sure that software is ready to handle these upgrades

Upgrade(s) Phase 1 ( up to 2021(?)): – Construct Install and commission the New Small Wheel – Install and commission the new End Cap LVL1 trigger – Other possible upgrades: Improve coverage in sect 12 and 14 of the barrel – Small and light chambers to be installed between BMFs Improve LVL1 trigger in the region 1.3>  >1 – Confirm the Big Wheel LVL1 trigger with fast information coming from EE region. – Together with PL of Small Wheel project Take decision on chamber technology Form the collaborations look for the money and organize the work Write TDR and (I)-MOU +……….All the rest

Upgrade(s) Phase 2 (2021(?)-2030(?)): – Main issue is the trigger ! – Very probably we will need to rebuild all the trigger electronics due to the probable increase of trigger latency in ATLAS. – Need to sharpen the LVL1 threshold to reduce LVL1 rates Inclusion of MDT in the LVL1 trigger decision??? – Will the present detector and read-out electronics survive 3000 fb -1 and 7*10 34 ? – Phase 2 seems very far in time but we have to start now to plan for it and to follow what happens in ATLAS – Many decisions have large side effects for the muons.

Software and Performance Third reconstruction chain almost ready to be deployed – By March should be used in the Tier0 together with MuonBoy and Moore – In Rel 18 it should be the only reconstruction chain – The third chain should bring better maintainability but we should not compromise performance: get best features from both algorithms Need intense commissioning and optimization work Ensure that milestones are met Ensure that new people will be injected in the software development Continue to support the Software groups and in particular enhance the effort on simulation for the upgrade needs Ensure that alignment and calibration will achieve the TDR level of accuracy. – Ask at the EB and organize with Run Coordination more Toroid Off runs to improve accuracy of alignment

Manpower issues Need to find a replacement for Stephanie – One of the more difficult task of the present and next PL. Possibly need to find replacement for other very relevant people in the steering group – Up to now we managed quite well in rotating people and responsibilities in the SG but it might get worst due to lack of new experts and/or people resident at CERN.