CRR Model Building Process Bradley Bell CRR Engineer.

Slides:



Advertisements
Similar presentations
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
Advertisements

Discussion: Use of RAPs in system operations Kris Dixit 1.
11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Joe Mercer Operations Planning Engineer III Operation Planning Analysis PHAAUG Meeting Mar 12 th, 2015.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
Project Name Delete this tip note box: To estimate the length of your presentation multiply each slide by 3 minutes; this gives you the worst case.
ROS Feb 2006 The Model Curtis Crews Network Model Engineering Supervisor
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
July 9, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
March 20, 2008 TPTF CIM Update Raj Chudgar Program Director for Market Redesign.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
September 8, 2008 TPTF Nodal Core Projects Updates Nodal Project Managers.
Matt Tozer ERCOT Manager, Settlements & Billing 9/4/2013 ERCOT Update Management of the Balancing Account CMWG.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
March 6, 2012 ERCOT Public ERCOT CRR Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
1 TSP Nodal Engagement Market Participant Call ERCOT July 14, 2010.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
November 5, 2012 ERCOT Public ERCOT CRR Update to CMWG Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Network Model Management System (NMMS)
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
2009 Project Prioritization Troy Anderson ERCOT Program Management Office February 20, 2008.
Temperature Assumptions for Dynamic Ratings in ERCOT CRR Auctions Proposal to differentiate between Day (PeakWD & PeakWE) and Night (Off-peak) October.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
1 TSP Nodal Engagement Market Participant Call ERCOT June 16, 2010.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
1 TSP Nodal Engagement Market Participant Call ERCOT June 02, 2010.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
Nodal Planning Go Live Austin, TX February 3, 2011
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Market Trials Update NATF March 2,
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
2011 Prioritization Update to Market Subcommittees
Average Monthly Temperature and Rainfall
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Time-Based Management of Large Scale Network Models
Presentation transcript:

CRR Model Building Process Bradley Bell CRR Engineer

Intro: Model Building Process Model Building Environment Model Building Timetable Building Contingency File Outages / Outage Selection Process Running Topology Processor Post Processing Model

Overview NMMS Database Topology Processor Transmission Outages CRR Model

Model Building Environment CRR Model Building Server ◦ - IMM ◦ - TP Snapshot of NMMS model One instance of NMMS model

Timeline (Monthly Model) PROCESSHOURS Build Contingency File16 hours Outage Selection3-8 hours Run Topology Processor24 hours Post Process Model16 hours Model building process will start 6-8 business days before model posting date on CRR calendar.

Outage Pull Date Monthly AuctionOutage Pull Date Dec / 6 /2010 Jan /16/2010 Feb /14/2010 Mar 20111/25/2011 Apr 20112/19/2011 May 20113/11/2011 Jun 20113/30/2011 Jul 20115/27/2011

Timeline (Annual Auction) 1 st ModelHOURS Build Contingency File16 hours Outage Selection3-8 hours Run Topology Processor24 hours Post Process Model16 hours 2 nd – N th ModelHOURS Build Contingency File16 hours Outage Selection 0 hours Run Topology Processor 3 hours Post Process Model16 hours

Create Contingency File NMMS Model CIM Model Contingency Building Program CIM Model Including Contingencies Create NOMCR containing CIM Model w/contingencies

OUTAGES

Outage Query WHERE outage.CATEGORY = 'Transmission‘ AND outage.planned_end_date >= (ADD_MONTHS (TRUNC (LAST_DAY (SYSDATE) + 1), 1)) -- this gives you the current month plus 2 AND outage.planned_start_date <= (ADD_MONTHS (TRUNC (LAST_DAY (SYSDATE) + 1), 2))-- this gives you the current month plus 3 AND outage.status IN ('Apprv', 'Accpt') OR ( outage.status = 'Withd’) AND outage.planned_end_date >= (ADD_MONTHS (TRUNC (LAST_DAY (SYSDATE) + 1), 1)) -- this gives you the current month plus 2 AND outage.planned_start_date <= (ADD_MONTHS (TRUNC (LAST_DAY (SYSDATE) + 1), 2)) -- this gives you the current month plus 3 AND outage.actual_start_date IS NOT NULL AND outage.actual_end_date IS NULL AND outage.CATEGORY = 'Transmission');

Outages / Outage Selection Process Nodal Operating Guides 5.5(6): System Modeling Information (6) Congestion Revenue Right (CRR) Network Model Outage determination uses network topology of the CRR Network Model identified by ERCOT. This must include Planned Outages of Transmission Elements approved by ERCOT at the time the CRR Network Model is being built and that demonstrate significant impact to the transfer capability during the effective period. ERCOT will consider including Outages in the CRR Network Model that are scheduled to occur in the relevant time period and meet one or more of the following criteria: (a)Consecutive or continuous approved Outages greater than or equal to five days; (b)Approved Outages which include Transmission Elements included in the definition of a Hub; (c)Approved Outages which include Transmission Elements in a 345 kV Transmission Facility; (d)Approved Outages that require the use of a Block Load Transfer (BLT); and (e)Any other approved Outage that has been determined by ERCOT to carry a substantial risk of causing significant congestion.

Gantt Chart

Outage Dates Nov. 6 outagesNov 12. outages Line A 138kV Line B 138kVLine X 138kV Line C 345kVLine Y 345kV Line D 69kVLine Z 69kV

Outage Date Selection Market Operator (MO) uses the base case flows in the On-Peak SSWG case for the appropriate year and season to qualitatively estimate the severity of the outaged lines. MO chooses the worst day of the month based on the evaluation from the step above as well as special consideration given to (in descending order) outages involving: ◦ Lines in the W->N constraint ◦ Lines in the N->H constraint ◦ Lines involved in other 2010 CSCs/CREs MO imports the outages into TP the and builds the network model based on those outages.

Topology Processor Create a basecase model and a model with outages Insert dynamic ratings for each weather zone from 10 year historical average Create RAW file and CRR output files

Post Process Model Manually Create ◦ Flowgate rights list and definition ◦ Contingency list and definition ◦ Non-Thermal Constraints list and definition ◦ Monitored Lines and Transformers ◦ CRR to Operations name mapping document ◦ Model Comparisons