Wolfgang Hofle AB/RF LHC MAC - June 15, 2007 - Abort gap cleaning with damper 1/23 Acknowledgements: T. Kramer (AB/BT), E. Shaposhnikova (AB/RF) Wolfgang.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
REPHASING TESTS DURING THE TWO BEAM IMPEDANCE MD P. Baudrenghien, J. Noirjean, T. Mastoridis 10/26/2012LSWG meeting 1 Oct 7 th,18:00 – Oct 8 th, 04:00.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Introduction Status of SC simulations at CERN
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
Details of space charge calculations for J-PARC rings.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Simulations and measurements of the injection oscillations and the MTE A. Huschauer Supervisor: S. Gilardoni Acknowledgements: H. Bartosik, H. Damerau,
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Chapter 10 Rüdiger Schmidt (CERN) – Darmstadt TU , version E 2.4 Acceleration and longitudinal phase space.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
1 Consequences of RF system failures during LHC beam commissioning T.Linnecar AB-RF.
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Field quality to achieve the required lifetime goals (single beam)
Jeffrey Eldred, Sasha Valishev
Multiturn extraction for PS2
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Limits on damping times
LHC (SSC) Byung Yunn CASA.
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Multi-Turn Extraction for PS2 Preliminary considerations
Saturday 7th May Sat – Sun night
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Collimators: Operations - Baseline Assumptions
Observation of Transverse Mode Coupling Instability at the PS and SPS
Thursday 30th September De-bunching test
Another Immortal Fill….
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
JLEIC Ion Integration Goals
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 1/23 Acknowledgements: T. Kramer (AB/BT), E. Shaposhnikova (AB/RF) Wolfgang Hofle AB/RF Alexander Koschik AB/BT Abort gap cleaning with transverse damper update

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 2/23 Overview Principle of abort gap cleaning – reminder SPS as LHC test bed: planned experiments in the SPS for 2007 simulations for the SPS 2007 test bed case first simulation results for LHC

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 3/23 Principal of abort gap cleaning using the transverse damper cleaning pulse (gate) centered in abort gap modulation of pulse with betatron frequency full amplitude up to ~ 1 MHz possible LHC nominal bunch pattern 2808 bunches [3] 1 st injected batch abort gap (119 missing bunches) amplitude can be modulated with any frequency between 1 kHz and 20 MHz; gate feedback action off during gap resonant excitation of transverse oscillations capture of beam by aperture limit (LHC: by collimators)

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 4/23 Results of cleaning experiment in SPS [9,10] (horizontal plane) After application of 6 cleaning pulses applied in center of batch (17 minutes later) LHC batch with 72 bunches in SPS bunch spacing 25 ns; start of coast

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 5/23 Earlier estimation for LHC abort gap cleaning Maximum capability of coherent excitation with LHC damper (assuming peak kick) of ~0.33  per turn [10] assume excitation off 7x10 -3 in tune (tune uncertainty, non-linearities) 450 GeV: collimators (7  ) reached after 55 turns (if collimators at 6  -> even faster) estimate for 7 TeV: ~220 turns to reach collimators [10] more accurate description needs tracking studies to take into account cleaning efficiency and all non-linearities from [11]

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 6/23 Current assumption: Longitudinal motion frozen SPS: injection: 2 MV, f s =182 Hz, Q s =0.004 (synch. period: 240 turns) LHC: injection: f s = 61.8 Hz (sync. period: 182 turns) collision: f s = 21.4 Hz (sync. period: 525 turns) Not a fundamental limitation, longitudinal motion can be switched on in MAD, However, limitations due to heavy computing load With expected cleaning times of the same order of magnitude as the synchrotron period, we should see the effect of chromaticity, hence assumption not justified in all cases Implementation of time (i.e. turn by turn) varying kicks in MAD (T. Kramer, A. Koschik) Tracking with MAD

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 7/23 Planned Experiment (MD) in the SPS in 2007 (1) following initial experiments in 2002 in the SPS (reported at the LHCMAC in July 2004) new experiments are planned for week 32 in the SPS (August 2007) objective: benchmark simulations and optimize excitation pulse fixed frequency or sweep; cleaning speed and efficiency in presence of non-linearities and coupling 2002: horizontal plane both dampers H1 and H2 could be used straightforward applying the same signal to both of them as they are installed next to each other -> no phase advance in between them Problem: large horizontal aperture, TIDH -> half gap ~55 mm -> 17.8  H (  H = 3.1 mm,  H =89 m for  n = 3  m, 26 GeV/c) 2007: vertical plane: internal dump TIDV as aperture limit TIDV -> half gap 20.4 mm -> 6.9  V  V = 3 mm,  H =89 m for  n = 3  m, 26 GeV/c) Problem: dampers V1 and V2 at 295 degrees phase advance, need to take this into account for the excitation; excitation at 1-q frac (for better efficiency due to hardware limitations)

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 8/23 Planned Experiment (MD) in the SPS in 2007 (2) Excitation conditions: Vertical dampers V1 (BDV ) and V2 (BDV ) phase advance 295 o Amplitude: maximum single turn kick: ~8  rad (total, i.e. each damper 4  rad) Beam conditions: LHC type beam with 25 ns bunch spacing, up to 4 x 72 bunches up to nominal intensity (SPS: 1.3x1011 protons / bunch) momentum: 26 GeV/c (injection plateau) longitudinal emittance: 0.35 eVs injected transverse emittances:  n = 3  m 4x4 hours parallel MD 1 dedicated MD at 26 GeV with beam stored (“coast”)

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 9/23 Simulations for the SPS experiment (A. Koschik) Tracking with MAD of 1100 macro-particles SPS: cleaning of captured beam simulated (limited possibilities to monitor un-captured beam this year in SPS) 11 slices with different  p/p, 100 macro-particles per slice, i.e. one slice at  p/p = 0 and 2x5 slices up to  p/p | max = +/- 1.5  current assumption (SPS MAD model)  p/p = +/ x central tunes:Q H = Q V = transverse emittances:  n = 3  m -> 26 GeV/c :  V = 2.96 TIDV (  =81 m) beam should be mainly lost at TIDV with half gap of 20.4 mm corresponding to 6.9 

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 10/23 Simulation results for the SPS experiment chromaticities  H =0.2  V =0 (!) Octupoles off k 3 =0 (!)

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 11/23 Simulation results for the SPS experiment chromaticities  H =0.2  V =0 Octupoles off k 3 =0 Influence on the vertical cleaning from H-chromaticity through coupling; still 100% cleaning 11 momentum slices, plus total losses

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 12/23 Simulation results for the SPS experiment chromaticities  H =0.2  V =0 Octupole(s) off k 3 =0 losses at TIDV remaining losses at selected MBBs 70% lost at TIDV 30% lost at various MBBs

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 13/23 Simulation results for the SPS experiment chromaticities  H =0.2  V =0.2 Octupoles off k 3 =0 ~25% cleaning but synchrotron motion will help here to clean other momentum slices on momentum slice total integrated

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 14/23 Simulation results for the SPS experiment chromaticities  H =0.2  V =0.0 Octupoles on k 3 = / 0.0 (OD/OF) ~89% cleaning

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 15/23 Simulation results for the SPS experiment chromaticities  H =0.2  V =0.2 Octupoles on k 3 = / (OD/OF) ~25% cleaning

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 16/23 Simulation results for the SPS experiment chromaticities  H =0.2  V =0.2 Octupoles on k 3 = / (OD/OF) Modulated excitation leads to “continuous” losses need for more simulations and optimised excitation (frequency program) could switch between different frequency programs; excitation in both planes simultaneously

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 17/23 Recapitulation: LHC: Time scales with RF on, at flat bottom energy (450 GeV) q =  E/  E bucket T 2  time to travel one RF period t gap time to cross abort gap (1200 periods ) qT2T2  gap mss Phase space trajectories at flat bottom (450 GeV, no energy loss) E. Shaposhnikova see [4,5] LHC case

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 18/23 Recapitulation: LHC: Time scales with RF on, at flat top energy (7 TeV) Time needed for an uncaptured particle to cross the abort gap as a function of the normalised initial maximum energy deviation [4,5] q t gap [s] At 7 TeV energy loss changes picture particles lost from the bucket with positive energy deviation pass through the hole between buckets and drift away from abort gap particles with negative energy deviation cross abort gap in maximum 25 s 1/6 of ring contributes to abort gap filling, particles lost from other 5/6 of ring are intercepted by the momentum collimation before reaching the abort gap E. Shaposhnikova LHC case

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 19/23 Simulation results for the LHC Beam 1 (450 GeV/c) LHC Model nominal with multi-poles + correction ~76% cleaning very fast cleaning of central momentum slices as expected

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 20/23 Simulation results for the LHC Beam 1 (450 GeV/c) LHC Model nominal with multi-poles + correction ~76% cleaning very fast cleaning of central momentum slices - as expected primary collimators betatron cleaning TCP.D6L7.B1 TCP.C6L7.B1 TCP.B6L7.B1 primary collimators momentum cleaning TCP.6L3.B1

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 21/23 Simulation results for the LHC Beam 1 (450 GeV/c) LHC Model nominal with multi-poles + correction ~100% cleaning seems feasible by tailored f(t) program Two different excitation programs

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 22/23  Further studies to prepare for week 32 MD in SPS: prepare tailored excitation pulses with varying f(t); analysis: compare measurements and simulations to gain confidence in simulations for the LHC case  Continue studies for LHC abort gap cleaning -> switch on RF (full 6D simulation) Conclusions  First results of studies confirm feasibility of abort gap cleaning  The necessity to design optimized frequency sweeps/modulation to achieve full cleaning has been shown in simulations  Study simultaneous excitation in both planes

Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 23/23 1.A. Drees, L. Ahrens, R. Fliller III, D. Gassner, G.T. McIntyre, R. Michnoff, D. Trobojevic, “Abort Gap Cleaning in RHIC”, EPAC’02, Paris, p and EPAC The LHC Design Report, CERN , vol. I, chapter 6, Geneva, The LHC Design Report, CERN , vol. I, Geneva, 2004; and P. Collier, “Baseline Proton Filling Schemes”, LHC Project Workshop –Chamonix XIII, CERN-AB , p. 30, Geneva, E. Shaposhnikova, “Abort Gap Cleaning and the RF System”, LHC Performance Workshop – Chamonix XII, 2003, CERN AB , p. 182, Geneva, E. Shaposhnikova, S. Fartoukh, B. Jeanneret, “LHC Abort Gap Filling by Proton Beam”, EPAC E. Shaposhnikova, “Longitudinal motion of uncaptured particles in the LHC at 7 TeV”, LHC Project Note 338, CERN, Geneva, B. Jeanneret, Private Communication. 8.W. Hofle, “Progress with the SPS Damper”, LHC Workshop Chamonix XI, 2001, CERN SL DI, , Geneva, T. Bohl, W. Hofle, T. Linnecar, E. Shaposhnikova, J. Tuckmantel, “Observation of Parasitic Beam and Cleaning with Transverse Damper”, AB-Note MD, CERN, Geneva, W. Hofle, “Experience gained in the SPS for the future LHC abort gap cleaning”, EPAC S. Fartoukh, O. Bruning, “Field Quality Specification for the LHC Main Dipole Magnets”, LHC Project Report 501, CERN, Geneva, References