Heavy Ions in RHIC – How to get to higher Luminosities? Angelika Drees APS DNP Fall meeting Oct. 30, 2003 I.Accelerator Basics II.Luminosity Limitations.

Slides:



Advertisements
Similar presentations
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Advertisements

1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
Winter Workshop, San Diego Mar 16, 2006Angelika Drees Short- and Long-term Future of RHIC Introduction Luminosity, Luminosity Limitations Runs so far and.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Issues.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Copyright, 1996 © Dale Carnegie & Associates, Inc. Intra-beam Scattering -- a RHIC Perspective J. Wei, W. Fischer Collider-Accelerator Department EIC Workshop,
Thomas Roser NSAC subcommittee April 4, 2005 Facility Strategy RHIC performance overview Luminosity and polarization evolution (towards “enhanced luminosity”)
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Wolfram Fischer1 2 superconducting 3.8 km rings 2 large, 1 small experiments 100 GeV/nucleon Au 250 GeV polarized protons Performance defined by 1. Luminosity.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
Loss Limitations and Collimation Angelika Drees, R. Fliller, W. Fu The RHIC Collimation Sytem: history and overview RHIC Loss Limitations Operational limits.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
ERHIC design status V.Ptitsyn for the eRHIC design team.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
BROOKHAVEN SCIENCE ASSOCIATES Electron Cooling at RHIC Enhancement of Average Luminosity for Heavy Ion Collisions at RHIC R&D Plans and Simulation Studies.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
1 Beam Induced Pressure Rise in RHIC Wolfram Fischer Thanks to M. Blaskiewicz. P. He, H.C. Hseuh, H. Huang, U. Iriso-Ariz, L. Smart, S.Y. Zhang 13 th ICFA.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
Crossing transition at RHIC V.Ptitsyn, N.Abreu, M. Brennan, M.Blaskiewicz, W. Fischer, C. Montag, R. Lee, S.Tepikian.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
1 Electron clouds and vacuum pressure rise in RHIC Wolfram Fischer Thanks to M. Blaskiewicz, H. Huang, H.C. Hseuh, U. Iriso, S. Peggs, G. Rumolo, D. Trbojevic,
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
eRHIC Design and R&D From RHIC to eRHIC
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Heavy Ions in RHIC – How to get to higher Luminosities? Angelika Drees APS DNP Fall meeting Oct. 30, 2003 I.Accelerator Basics II.Luminosity Limitations and how to deal with them III.RHIC II Luminosity Upgrade Angelika Drees, 21st Winter Workshop on Nuclear Dynamics, Breckenridge, Feb. 2-12, 2005

I. Basics: Luminosity The luminosity can be increased if: o There is more beam/bunch in the two rings (N B,N Y ) o There are more bunches colliding (k b ) o The beam profiles, the size of the beam, at the interaction point, is small (  x,  y ) ->  * Common luminosity detectors (ZDC) are installed in all 4 experiments to measure and monitor luminosity (instantaneous and integrated).

Bunched Beam total of 55 bunches per ring 12.8  s per revolution Abort gap Beam is accelerated by Radio Frequency (RF) cavities:  28 MHz for acceleration  200 MHz for storage to reduce bunch length 28 MHz defines the number of “ buckets ” = 360, length is 12.8  s/360=35 ns (or 10 m) Coasting beam: continuous, no bunch structure (debunched), cannot be accelerated Bunched (or captured) beam: every 6 th (3 rd ) bucket, i.e (110+10) bunches per ring with 10 9 Au ions Cu ions Bunch 1 Bunch 55 “cogging”: lock f rev of both beams and rotate bunches such that they collide at IRs

Transition energy crossing RHIC is the first super conducting, slow ramping accelerator to cross transition energy  t (~ 23 GeV): What is “transition” ? ¯below transition fast particles arrive early at the RF ¯with increasing energy fast particles go more and more to the outside (Dispersion!) ¯above transition fast particles arrive late at the RF ¯at transition all particles arrive at the same time: short and unstable bunches! Cross unstable transition energy  t by rapidly changing transition energy (2001) using special quadrupoles: Beam energy RF t t

Transition crossing with radial energy jump Dipole oscillations after transition Transition-phase flip

II. Luminosity Limitations Luminosity from Beam Parameters: beam/bunch intensity beam sizes Why don’t we just in(de)crease both? The RHIC Cycle and its Challenges: 1.Acceleration: the ramp 2.Store Keep in mind that we cannot make more beam ;) nor (yet) decrease beam sizes once injected and accelerated!

Luminosity Limitations Injector performance (routine)/ injections: oAu1  10 9 /bunch, 10  mm mrad oCu 6  10 9 /bunch, 15  mm mrad  additional bunch merge (Booster), damping, new source? Injection/ramp: Vacuum break-downs/electron clouds oAu: < 40  10 9 ions/ring, worse for 110 bunches oCu: with 37x37 pattern and 4.5  10 9 ions/bunch no sign yet  More baking, scrubbing?, NEG coating Ramp: Single bunch instabilities around transition: o Au: < 1.1  10 9 ions/bunch o Cu: so far no sign up to 6  10 9 /bunch  chromaticity control? Store: Intra-Beam Scattering (IBS), beam-beam, debunching oTransverse and longitudinal emittance growth for Au and Cu  stochastic cooling, eventually will need electron cooling Store: Experimental background ocoupling, bump non-closure, halo scraping …  model, 2ndary collimators, gap cleaning RHIC cycle

Pressure rise at injection and during the ramp Mainly in warm sections that didn’t have bake-out; worse with 110 bunches/ring Ion desorption, electron desorption, electron multi-pacting, electron cloud Installed electron detectors in IP12 and IP2 and solenoids for electron suppression in IP Torr Pressure at IP12 Slow rise. Electron cloud + ? 55 bunches 9x10 8 Au/bunch Pressure at IP12 Run-away rise. Loss induced gas desorption? 2x10 -4 Torr 55 bunches 6x10 8 Au/bunch 50 s 20 s

Pressure rise with 100 ns bunch spacing Pressure rise coincides with the electron signal. Solenoid field reduces electron signal. Solenoid field (4 m) partially reduces pressure rise in the 34 m long straight section. Beam intensity [10 11 ] Pressure Rise [10 -8 Torr] Eectron signal [10 mV] Solenoid on Minutes

Flexible Bunch Patterns Use a combination of 60-bunch and 120- bunch fill patterns by injecting bunches into 3 rd and 6 th buckets. Total number of bunches is: 55 < 68 < 110 Increase is 20% per ring. Avoid vacuum pressure rise while maintaining same luminosity (increase bunch current!) by using any number of bunches < 56

Vacuum: NEG coating NEG strips first used in TTB(BNL) and LEP(CERN) Non-Evaporable Gutter coating: Ti 30 Zr 30 V 40 sputtered ~ 1  m thick onto walls Developed at CERN for LHC warm sections Ultimate pressure < Torr Activation: 1 250º C, 5 200º C, º C Can be activated numerous times (order of 10 years) Secondary Electron Yield (SEY): 1.1 after activation of 2 200º C Strong suppression of multi-pacting (tested at SPS) Electron stimulated gas desorption: ~ 100 times lower than baked SS Ion stimulated gas desorption: ~ 10 times lower than SS (tested with 4.2 MeV/n Pb) Test at RHIC: install 60 m of coated pipe, test ion desorption at Tandem NEG strip at TTB

Acceleration: Fast Instabilities 01:53:4301:53:44 With Instability Without Instability

Emittance Growth during the Ramp beginning of ramp transition end of ramp Two ramps of recent Cu stores bottom: before chromaticity adjustment top: after chromaticity adjustment emittance growth of up to 100% still remains (not understood yet) chromaticity: dq/q=  dp/p (tune change as a function of momentum change)

Intra-Beam Scattering (IBS) in RHIC Longitudinal and transverse emittance growth agrees well with model Longitudinal emittance growth causes debunching (bunched beam lifetime) => stochastic cooling will allow up to 50% more beam/bunch Some additional source of transverse emittance growth IBS determines RHIC Au performance Eventually will need electron cooling

Beam Growth during a Store blue and yellow emittances during 3 Cu stores, Jan. 30, 2005 Norm. emittances between 15 and 20  mm mrad grow up to 35  mm mrad at the end of store  => IBS + beam-beam bunch by bunch emittance measured during a Cu store Jan 31, Bunch1 is affected by the gap cleaning procedure, bunch 19,37,121 have 4 collision points, bunch 100 has only 3 => beam- beam causes additional emittance growth.

Gap Cleaning cleaning starts blue total beam blue bunched beam 30 min. was: gap cleaned at the end of store (> 30 min.!), bunch by bunch in gap now: continuous excitation (1 Hz) through store, kicking ~150 ns of gap. “Gap Cleaning” means minimization of the debunched beam (I total -I bunched ) to stay within operational envelope (uncontrolled beam loss/hour) and to prevent magnet quenches at time of beam dump. Abort Gap Cleaning in 2 steps: excite the debunched beam (in gap) transversely with the tune meter IR2 remove the excited beam with the transverse IR8

Cu-Stores with and w/o continuous gap cleaning cleaning in middle and at end of store => loss of time for integrated luminosity continuous cleaning allows physics w/o interruption => risk of higher backgrounds cleaning

Cu FY05 run integrated luminosity so far … maximumminimum  *(m) one week ago: yesterday delivered/accepted varies for experiments!

RHIC HI– achieved parameters Mode No of bunches Ions/bunch [  9 ]  * [m] Emittance [  m] L peak [cm -2 s -1 ] L store ave [cm -2 s -1 ] L week Au-Au [Run-4]    b -1 d-Au [Run-3] 55110/   nb -1 Cu Cu [Run-5] few n.a. Au-Au design    b -1 [best store or week] [incl. beam experiments and maintenance] Enhanced HI Luminosity Goal (before e-cooling, about 2008, assume stochastic cooling) For Au-Au, average per store, 4 IRs: L = 8  cm -2 s -1 at 100GeV/u 4x design 2  achieved

Projected 4-year Au-Au luminosity Assume - 12 weeks production in every year - 8 weeks of linear luminosity increase - 4 experiments - completion of improvements 2  increase

III. RHIC II luminosity upgrade RHIC luminosity is limited by intra-beam scattering  beam cooling at full energy! Needs improved injector -> EBIS Feasibility study by BINP (V. Parkhomchuk et al.): RHIC luminosity can be increased ten times. Bunched electron beam requirements for 100 GeV/u gold beams: E = 54 MeV, ~ 100 mA, electron beam power: ~ 5 MW! Requires high brightness, high power, energy recovering superconducting linac First linac based, bunched electron beam cooling system used at a collider First high p t electron cooler to avoid recombination of e - and Au 79+ Maintains present bunch spacing (~ 100 ns) and available IR length Increased luminosity for pp and other species Longitudinal cooling possibly gives shorter diamond length

EBIS/Linac RHIC Pre-Injector Highly successful development of Electron Beam Ion Source (EBIS) at BNL EBIS allows for a reliable, low maintenance Linac-based pre-injector replacing the Tandem Van de Graaffs Produces beams of all ion species including Uranium and polarized He 3 (for eRHIC) Ready to start construction; Cost: 16.1 M$; Schedule: 2005/6 – 2008/9 EBIS test stand

EBIS layout

RHIC II Luminosities with e-Cooling LinacRf Gun Buncher Cavity Cooling Solenoid (~ 30 m, ~ 1 T) Debuncher Cavity e-Beam Dump Gold beam Gold collisions (100 GeV/n x 100 GeV/n): w/o e-coolingwith e-cooling Emittance (95%)  m15   3 Beta function at IR [m]  0.5 Number of bunches Bunch population [10 9 ]11  0.3 Beam-beam parameter per IR Peak luminosity [10 26 cm -2 s -1 ]3290 Average luminosity [10 26 cm -2 s -1 ]870 demonstrated by JLab for IR FEL. (50 MeV, 5 mA)

RHIC Luminosity with and without Cooling Transverse beam profile during store Leveling of luminosity and beam-beam interaction through continuous cooling and beta squeeze 2 mm 5 hours With e-cooling Without e-cooling Luminosity [10 28 ]

Summary  Successful operation of RHIC with 100 GeV/n HI beams in three modes (at various energies): Gold – gold collisions, peak luminosity = 5  cm -2 s -1 d–Au collisions, peak luminosity = 7  cm -2 s -1 Cu-Cu collisions,peak luminosity = ?  cm -2 s -1  Full exploitation of the many physics capabilities of RHIC requires extensive, ongoing machine development  Accelerator Improvement Projects are required to improve performance and maintain and enhance reliability of the RHIC operation  Successful EBIS R&D allows for the construction of a new Linac-based RHIC pre-injector  RHIC e-cooling R&D program started for 40 times RHIC Au-Au design luminosity upgrade  Luminosity can be increased by another factor x10 => will you be ready to take it?

Supplemental

RHIC Run-5 Run-5 (started in November 2005)  Cu – Cu at 100 GeV/u – 4 weeks set-up / ramp-up – 7 weeks (?) for luminosity – 7 nb -1 integrated luminosity delivered to Phenix/Star (assuming same charge per beam as with Au in Run-4)  p  - p  at 100 GeV/u – 3 weeks set-up / ramp-up – 8 weeks (?) for luminosity – 8 pb -1 integrated luminosity delivered to Phenix/Star, with 45% polarization at store (demonstrated performance of Run-4) [T. Roser, W. Fischer, M. Bai, F. Pilat, “RHIC Collider Projections”, Last update August 16, 2005.]

Low Energy Running

Scraper and Kicker Location in RHIC

The Zero Degree Calorimeter •3 modules on either side of the Interaction Region (IR) •Same detector at all IRs with experiments. •About +/- 18 m distance from center behind DX => Only neutron sensitive •Covers +/- 2.5 mrad forward angle

Storage: Measuring Luminosity Zero-Degree Calorimeters Protons bend away Detects energy from neutrons Timing is Everything

RHIC upgrades for Enhanced Luminosity – risk assessment SpeciesLimitFurther mitigationRiskAlternatives Au, pWarm vacuum1. NEG coated pipes 2. Other (1) Low (2) Solenoids, ion pumps pCold vacuum1. Pre-pumping 2. Beam-scrubbing (3) MediumNo alternatives pBeam-beam (4) 1. Orbit feed back for IP (5) 2. Better  Q min,  control Medium?? Notes: (1) Any workable solution at bottlenecks (solenoids, other coating, redesign for baking, …). (2) Successive layers of bottlenecks may not be removed fast enough (one layer per shut-down). (3) Beam scrubbing for SEY reduction demonstrated by CERN. If e-clouds release chemisorbed molecules they can only be pumped out after warm up. This may need too many thermal cycles (at most one per shut-down). (4) Need to accommodate  Q=0.015 with luminosity lifetime > 10 hours. Selected new working point, concluded that change of phase advance between IPs will not result in any gain. (5) To suppress 10Hz oscillation of about 5% of rms beam size, suspected to lead to emittance growth.

Electron Cooler Beam Dynamics R&D Use two solenoids with opposing fields to eliminate coupling in the ion beam. A quadrupole matching section between the solenoids maintains magnetization. Stretcher / compressor with large M56 and zero M51, M52 Merge beams with two weak dipoles with Stabenov solenoid focusing to minimize dispersion and avoid coupling.

1. New Collimation System set of 4 PinDiodes White Secondary Collimators are Vertical Steering and motion of collimators (total of 18 motion channels!) will be automated by feedback based on signals from PinDiodes (loss monitors). Status: collimators ready to be installed, software development in progress.

Pressure rise with 100 ns bunch spacing Pressure rise coincides with the electron signal. Solenoid field reduces electron signal. Solenoid field (4 m) partially reduces pressure rise in the 34 m long straight section. Beam intensity [10 11 ] Pressure Rise [10 -8 Torr] Eectron signal [10 mV] Solenoid on Minutes