Scheduling for Low-volume Operations

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Operations Management
Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Operations Scheduling
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Operations Management R. Dan Reid & Nada R. Sanders
Operations Management
Scheduling.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Scheduling – Day 2. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material.
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
OPERATIONS SCHEDULING AND SEQUENCING
Industrial Systems Engineering Dept. İzmir University of Economics
Chapter 16 Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough - UNH.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
1 Chapter 10 Scheduling 1 Chapter 10 SCHEDULING McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
© Wiley 2007 Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 3rd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling Seminar exercises Process and Production Management.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
Production Activity Control
Infinite loading A scheduling approach that ignores capacity constraints. Click here for Hint finite loading or infinite loading or priority rule?
Scheduling Operations
assemble-to-order (ATO) A system that produces standard modules to be
Chap 11 Learning Objectives
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Scheduling Seminar exercises
Operations Management
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Scheduling for Low-volume Operations

Scheduling Definitions Routing: The operations to be performed, their sequence, the work centers visited, and the time standards Bottleneck: A resource where scheduled work exceeds capacity Due date: When a job is supposed to be finished Slack: The time that a job can be delayed & still finish by its due date Queue: A line of jobs or people waiting for work or service

Low-Volume Operations Low-volume, job shop (batch) operations, are designed for flexibility. Use more general purpose equipment Customized products with higher margins Each product or service may have its own routing (scheduling is much more difficult) Bottlenecks move around depending upon the products being produced at any given time Many service operations have similar issues

Gantt Charts Developed in the early 1900’s by Henry Gantt Load charts Illustrates the workload relative to the capacity of a resource Shows job schedule by employee

Gantt Chart (continued) Progress charts: Illustrates the planned schedule compared to actual performance Brackets show when activity is scheduled to be finished. Note that design and pilot run both finished late and feedback has not started yet.

Scheduling Work - Work Loading Infinite loading: Ignores capacity constraints, but helps identify bottlenecks in a proposed schedule to enable proactive management Finite loading: Allows only as much work to be assigned as can be done with available capacity – but doesn’t prepare for inevitable slippage

Forward and Backward Scheduling Forward Scheduling – starts processing immediately when a job is received Backward Scheduling – begin scheduling the job’s last activity so that the job is finished on due date

Job Sequencing Considerations at Work Centers Which of several jobs should be scheduled first? Priority rules: Decision rules to allocate the relative priority of jobs at a work center Local priority rules: determines priority based only on jobs at that workstation Global priority rules: also considers the remaining workstations a job must pass through

Commonly Used Priority Rules Local priority rules First come, first served (FCFS) (local) Earliest due date (EDD) (local) Shortest processing time (SPT) first (local) Global priority rules Slack time per remaining Operations (S/RO) - global Slack /(number of remaining operations) – schedule lowest first Critical ratio (CR) - global (Time until due date)/(processing time) Job with lowest CR first

Example Using SPT, EDD

Measuring Scheduling Performance Job flow time: Time a job is completed minus the time the job was first available for processing; avg. flow time measures responsiveness Average # jobs in system: Measures amount of work-in-progress; avg. # measures responsiveness Makespan: The time it takes to finish a batch of jobs; measure of efficiency Job lateness: Whether the job is completed ahead of, on, or behind schedule; Job tardiness: How long after the due date a job was completed, measures due date performance

Scheduling Performance Calculations Job A finishes on day 10 Job B finishes on day 13 Job C finishes on day 17 Job D ends on day 20 Calculation mean flow time: MFT= (sum job flow times)/ # of jobs = (10+13+17+20)/4 = 60/4 = 15 days Calculating average number of jobs in the system: Average # Jobs =( sum job flow times)/ # days to complete batch = (60)/20 = 3 jobs Makespan is the length of time to complete a batch Makespan = Completion time for Job D minus start time for Job A = 20 – 0 = 20 days = sum of job processing times

Performance Calculations (Cont.) Lateness and Tardiness are both measures related to customer service Average tardiness is a more relevant Customer Service measurement as illustrated below

Comparing SPT and S/RO E done at end of day 2 A end of day 5 D at end of day 9 F at end of day 14 C at end of day 20 B done at end of day 27

Comparing SPT and S/RO (cont.) B done at end of day 7 A at end of day 10 F at end of day 15 E at end of day 17 D at end of day 21 C done at end of day 27

Global Priority Rules Slack time remaining per operation (S/RO) = (slack time)/(number of operations remaining) Schedule job with lowest S/RO first Critical ratio (CR) = (time until due date)/(processing time) Schedule job with lowest CR first

Comparing Priority Rules Shortest processing time (SPT) Minimizes mean flow time Minimizes average job lateness Minimizes average time in the system Faster response to most customers Faster cash flow Jobs with long processing times may be pushed further and further back in the schedule

Comparing Priority Rules (2) Rules that consider due dates Slack time per remaining operations Critical ratio These rules reduce tardiness and maximum lateness Jobs with short processing time and large slack will not be finished as quickly

Sequencing Jobs through Two Work Centers – Johnson’s Rule Johnson’s Rule – a technique for minimizing makespan in a two-stage process Step 1 – List the jobs and the processing time for each activity Step 2 – Find the shortest activity processing time among the jobs If the shortest processing time is for a 1st activity, schedule that job first If the shortest processing time is for 2nd activity, schedule that job last Step 3 – Find the shortest activity processing time among the remaining jobs and schedule as in step 2 above. Repeat until all jobs are scheduled.

Johnson’s Rule Example: Vicki’s Office Cleaners does the annual major cleaning of university buildings. The job requires mopping (1st activity) and waxing (2nd activity) of each building. Vicki wants to minimize the time it takes her crews to finish cleaning (minimize makespan) the five buildings. She needs to finish in 20 days.

Scheduling for Service Organizations Demand management: Appointments & reservations Posted schedules Delayed services or backlogs (queues) Managing service capacity: Staff for peak demand (if cost isn’t prohibitive) Floating employees or employees on call Temporary, seasonal, or part-time employees