KARA – Development & Traffic Update KARA AGM – March 29, 2012.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
1 Beachcomber Bay Sewer Lift Station Homeowners believe a better solution is available for both the City and the Homeowners.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
ESTABLISH A NORTH-SOUTH PARKWAY The LNTC and the towns should plan for a parallel north-south parkway that will expand the commuter rail impact area to.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
February 2013 Quarterly Luncheon. Platte County Public Works Bridge replacements Improvements to current roadways New roadways to serve growing demand.
Transportation Infrastructure Technical Assistance Survey (oil counties)
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
Corridor #5 Update United States Senate Briefing September 26, 2007.
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
Transportation Border Working Group Montreal October 22 and 23, 2013 CBSA Project Update.
Ronald B. Achelpohl, PE Operation Green Light Mid-America Regional Council.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
KARA – Development Update KARA AGM – May 5, 2011.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
The Ministry of Transportation and Infrastructure welcomes you to an Open House for: Trans Canada Highway No.1 Improvements in Salmon Arm Your comments.
West Northern Lights Boulevard – Sound Barrier Improvements August 16, 2006 Meeting Purpose: A Forum to Share and Gather Information The Municipality of.
TOWN OF CALEDON Identifying Strategic Employment Lands along the GTA West Corridor – an OPPORTUNITY Open House Presentation June 29, 2015.
The Bakken Boom – Transportation Impacts Rory Nelson ND Energy Impact Coordinator.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Community Development Department PINE LAKES PARKWAY NORTH ROADWAY IMPROVEMENTS.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Tab 9 Case Studies. Minor Accident Single Vehicle Accident.
“Yesterday, Today and Tomorrow” Kleinburg-Nashville The Making of a Community.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Transportation Projects City Council Workshop May 14, 2013.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
WITH SPECIAL THANKS TO. TOWN OF CALMAR LNEDA PRESENTATION Brought to You By: ED MELESKO Director of Public Works & Land Development.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
 Every sign’s shape and color have special meaning  Regulatory Signs: Signs that set limits, or give commands.  Example: stop sign, Yield, One Way,
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Transportation Master Plan Update Warden’s Forum May 7, 2015.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
The I-465 West Leg Reconstruction Project
Downtown Valdosta Truck Traffic Mitigation Study
Cycling infrastructure spending 2017
City of Bloomfield Hills
Malibu Canyon Pole Replacement Project Information
Hyde St Residents’ Group
9th & Colorado Redevelopment Impacts Denver Public Works - Traffic Safety recommendations Community feedback Survey Results Conducted by: Colorado.
Early Voting Starts Oct. 20 | Election Day Nov
Traffic Study Presented by Keith Wenners, pe, ptoe
Comprehensive Transportation Plan
1. Introduction Today: Markham’s traffic problem
Stockton City Council December 6, 2007 Land Use Diagram Changes
Harbour Island Force Main Replacement
What follows after approval of Active Transportation
Presentation transcript:

KARA – Development & Traffic Update KARA AGM – March 29, 2012

Development & Traffic Update Water Update Kleinburg Streetscape Trans-Canada Parkway Pipeline Summary of Planned Developments within KARA Boundary Traffic Updates/Road Widening West Vaughan & West GTA Infrastructure Planning

City Water Update Kleinburg will move off of wells to Peel Region (lake Ontario based) in 2012 South Kleinburg – end of May Rest – 3 rd quarter

Kleinburg Streetscape Original Study Completed Estimated budget to implement $3.95MM. Expect significant funding from “other sources” – public/private partnership BIA leading effort to raise enough to start detailed planning this year alignment of plans with Major Mack widening

TransCanada Parkway Pipeline Portions of line from Vaughan through Brampton to be ‘twinned’ including section from Kipling to Weston (to increase capacity) Concerns – capacity, pressure, integrity, route – met with TransCanada Originally planned to deviate from current route through subdivision at Kirby/Stephanie around south end of subdivision - KARA and Residents opposed Current plan is to keep along current right-of- way

TransCanada Parkway Pipeline

Planned Developments

Summary of Planned Developments Nashville Heights 2500 units total (1820 low/med density) 8300 people/jobs Kleinburg Heights 69 Units North End ~ 200 people Servicing and Sewage Pump on Stevenson under construction – complete in 2012 Molise & Lake Rivers/Kleinburg Hills ~850 units – access via Major Mack. ~ 2000 people starting later this year Kerrowood 46 units N of Cornerstone Church ~125 people

Summary of Planned Developments Kleinvit Estates (North of Hedgerow) 114 Units ~ 350 people Pine Heights (Teston/Pine Valley) 1300 units ~ 4000 people Kleinburg Village Redcroft (Dawson) Property ~ 52 units More to come? New Vaughan OP Areas Area 1 – Nashville Triangle - ~200 people Area 2 – Huntington Stud Farm ~ 2600 people Areas 5&6 – Kipling S of Kirby ~ 2200 people

Traffic Updates Truck ban continues on Nashville Road Seeking better enforcement on Nashville, Islington & Stegman’s Speed limit reduction on Highway 27 Stop light on 27 North (2012) Still seeking left turn prohibition S 27 onto Islington during morning peak Meeting with Police/Road Watch re aggressive and dangerous driving

W. Vaughan Traffic Planning (25k new residents, 50k jobs by 2031)

W. Vaughan Traffic Planning

Road Widening Major Mack planned to be widened to 4 lanes beginning in 2013 Pine Valley to Weston – 2013 Hwy 27 to Pine Valley – 2014 Hwy 27 to 50 – 2014 – 2016 Design will include potential to upgrade to 6 lanes in future Continue to push for bike lanes off the road Coordinate design with Streetscape at Islington/Major Mack. Meeting with residents and Region to discuss issues (safety, noise, aesthetics, etc.) and review design

West GTA Highway Corridor