1 12/09/2010 PHENIX WEEKLY PLANNING 12/09/2010 Don Lynch.

Slides:



Advertisements
Similar presentations
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
Advertisements

1 12/3/2009 PHENIX WEEKLY PLANNING 12/3/2009 Don Lynch.
1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 4/7/2011 PHENIX WEEKLY PLANNING 4/7/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
11/3/20111 PHENIX WEEKLY PLANNING 11/3/2011 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.
12/22/20111 PHENIX WEEKLY PLANNING 12/22/2011 Don Lynch.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
5/5/11 1 PHENIX WEEKLY PLANNING 5/5/2011 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
10/13/20111 PHENIX WEEKLY PLANNING 10/13/2011 Don Lynch.
1 11/12/2009 PHENIX WEEKLY PLANNING 11/12/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
1 3/24/2011 PHENIX WEEKLY PLANNING 3/24/2011 Don Lynch.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
11/10/20111 PHENIX WEEKLY PLANNING 11/10/2011 Don Lynch.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
1 12/02/2010 PHENIX WEEKLY PLANNING 12/02/2010 Don Lynch.
1 11/04/2010 PHENIX WEEKLY PLANNING 11/04/2010 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
1 1/20/2011 PHENIX WEEKLY PLANNING 1/20/2011 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
1 3/31/2011 PHENIX WEEKLY PLANNING 3/31/2011 Don Lynch.
10/20/20111 PHENIX WEEKLY PLANNING 10/20/2011 Don Lynch.
1 6/23/2011 PHENIX WEEKLY PLANNING 6/30/2011 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
8/11/20111 PHENIX WEEKLY PLANNING 8/11/2011 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
12/15/20111 PHENIX WEEKLY PLANNING 12/15/2011 Don Lynch.
1 5/19/2011 PHENIX WEEKLY PLANNING 5/19/2011 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
11/17/20111 PHENIX WEEKLY PLANNING 11/17/2011 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

1 12/09/2010 PHENIX WEEKLY PLANNING 12/09/2010 Don Lynch

2 12/09/2010 Design, Eng’g, fabrication, procurement and site preparation tasks in support of shutdown tasksDone Shutdown Startup TasksDone Gas system maintenance, repair and upgradeIn progress12/24 PHENIX Infrastructure maintenance, repair and upgradeIn Progress12/24 Remove RPC PrototypesDone Remove HBDDone Remove RXNPDone Remove/Reinstall BBCDone Remove Re-install MPCIn Progress12/3 RPC3N & MuTrigger unfinished businessDone Remove current BP, install new BPDone DC/PC maintenance and repair (mid summer)Done Install RPC3S (including Absorbers)Done MuTr maintenance, repair and upgradeDone Install VTXDone 2010 Shutdown (Overview) Start Date End Date

3 12/09/2010 This Week: Re-Install North MPC Complete VTX Installation Commission VTX cooling system Final prep for commissioning of VTX and RPC3S detectors Complete restoring services to CM and MMS RPC1 and PE/Pb absorber prototype installations Final VTX / BP / CM & MMS Survey Move MuID collars to IR Prep IR & EC for roll-in and begin roll-in Install cables for FoCal prototype Future upgrades support

4 12/09/2010 Next Week Complete EC roll-in DC East/West maintenance and repairs Begin End of shutdown tasks including Pink/Blue/White sheets Final VTX Survey Install RPC1 Prototype Electrical and gas support Future upgrades support

5 12/09/2010

6

7 Easy Bake II

8 12/09/2010 Prototype Absorbers go here RPC1 Prototype Goes Here

9 12/09/2010 Installation scheme for Borated Poly and lead prototypes: Installation support structure attached to CM Prototype absorbers lifted with crane, attached to installation support structure by trolley and slid into position RPC1 Prototype

10 12/09/2010 Installed Borated Poly & Lead Absorber Prototypes Installed Stainless Absorbers RPC1 Prototype Support Structure RPC1 Prototype

11 12/09/2010 ProjectTask Completion Date Task DurationPersonnel reqmtsNotes PHENIXChiller cooling waterDone VTXAssemble west 1/2 detector Done VTX Design survey theodolite support brackets for CM lead shield Done VTXRoute fibers rack room to CME RackDone PHENIXBakeout/activate NEG for new BPDone PHENIXLeak check new BPDone VTXTest west 1/2 detectorDone VTXSurvey east barrels 1-4Done PHENIX Re-run MuTriggger fiber from MMS to rack room Done VTXFabricate survey support bracketsDone VTX Bring Support structure to Chem Lab - Done Done VTXInstall survey support bracketsDone Remaining Shutdown Tasks

12 12/09/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes RPC3SBuild TVB wallDone VTXSurvey west 1/2 detectorDone VTX Re-install bridge water manifold and cable trays Done VTXChiller platform 480V powerDone VTXAssemble east 1/2 detectorDone PHENIX Re-install MuTr station 2 channel air distribution Done VTXPrepare thermocouple mapDone VTXTest east 1/2 detectorDone VTX Install NOVEC piping from chiller platform area to VTX area Done VTX Receive extension rails/design/modify for installation Done VTXSurvey east 1/2 detectorDone PHENIXInstall access to inside MMSDone

13 12/09/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes VTXMate east and west 1/2 detectorsDone VTXSurvey/align east and west detectorDone VTXModify strongbacks for basket liftDone VTXInstall extension railsDone RPC3SNRTL cable traysDone VTXTransport west 1/2 detector to IRDone VTXInstall west 1/2 detectorDone VTX Assemble and install NOVEC distribution manifolds near VTX Done RPC3SRe-install shieldingDone VTXInstall humidity sensorsDone PHENIXRemove bakeout equipmentDone PHENIX Survey and align MMS, CM and new BP Done

14 12/09/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task Duration Personnel reqmtsNotes PHENIXAnnual PHENIX Safety ReviewDone PHENIXInstall power upgrade to bridgeDone RPC3SFinalize cable tray/Cable installationDone May need minor adjustments, etc RPC3SFinal pipingDone May need minor adjustments, etc VTX Install west 1/2 detector Bias, LV and signal cables Done VTX Install one Chiller for QA testing (on ground) Done VTX Connect west 1/2 detector to NOVEC cooling Done VTXSurvey/align west 1/2 detectorDone VTXTransport east 1/2 detector to IRDone RPC1&Abs Proto Installation planDone RPC1&Abs Proto WPDone PHENIXRe-install BBCs cabling/cooling pipesDone PHENIXRe-install BBCsDone PHENIX AH South exit chiller platform installation Done VTXInstall 3 chillers on chiller platformDone

15 12/09/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes VTXInstall east 1/2 detectorDone VTX Route 100 LV cables from bridge rack to near VTX Done VTX Route 260 duplex/simplex fibers from CME rack to near VTX Done VTX Route 7 Belden 16 pair cable trunks from CME rack to near the VTX Done PHENIXInstall East Vertical Lampshade on MMS Done RPC3SThermostatsDone PHENIX Gas mixing house R-134A shed addition R134A bottle warmers Done PHENIX MuTr and MuTrigger remaining subsystem tasks and tests Done May need a few more tests VTXInstall interlock PLC on bridgeDone Testing/ commissioning in progress VTX Route 100+ thermocouple extensions from PLC box to near VTX Done VTX In situ QA electronics test on east 1/2 detector Done RPC3S Re-install FCAL and any other disrupted subsystems Done? RPC1&Abs Proto Installation fixtures design and fabrication 12/9/20103 days PHENIX ME, Designer In Progress

16 12/09/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes VTX Install east 1/2 detector Bias, LV and signal cables 12/9/20101 week2 PHENIX techsIn Progress PHENIXRe-install MPCs12/9/20101 week2 PHENIX techsIn Progress PHENIXWP for DC repairs12/10/20102 daysMEAs convenient VTXSurvey/align east 1/2 detector12/13/20101 day PHENIX tech, designer, 2 surveyors after installation VTX Connect east 1/2 detector to NOVEC cooling 12/13/20102 days2 PHENIX techsIn Progress VTXFinal VTX survey12/13/20101 day 1 PHENIX tech, designer, 2 surveyors After east QA VTXFinal BP survey12/13/20101 day 1 PHENIX tech, designer, 2 surveyors After east QA RPC1&Abs Proto Installation12/13/20103 days3 PHENIX techsIf Time Permits PHENIXPrep EC for move to IR12/14/20101 day3 PHENIX techs After BBCs & MPCs & VTX PHENIXMove MuID collars to IR12/14/20101 day3 PHENIX techsAfter BBCsMPCs PHENIX Re-attach cables, gas piping, water piping and fibers to CM and MMS 12/14/20102 weeks3 PHENIX techsIn Progress PHENIX Remove manlifts, decking and 12 ton crane from IR to run storage 12/14/20101 day3 PHENIX techs After BBCs & MPCs & VTX installed PHENIXMove EC to IR12/15/20101 day3 PHENIX techsAfter Prep

17 12/09/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes PHENIXClose access to MMN12/15/20101 day1 PHENIX tech > MuTr/ Trig < flam gas RPC3S RPC gas controllers final installation and RPC subsystem commissioning 12/15/20101 week 1 PHENIX tech, RPC Group As soon as convenient PHENIXWire dumb waiter12/17/20101 dayElectrician After dumb waiter installed PHENIX Fold down EC platforms and install dumb waiter 12/16/20101 day 2 carpenters, 2 riggers After EC in IR PHENIX Re-install EC cables, fibers, water and gas piping 12/17/20104 days 3 PHENIX techs, 2 scientists, 1 electrican After EC in IR PHENIXInstall MuID collars12/28/20101 day3 PHENIX techsAfter EC in IR PHENIXDC repairs12/23/20103 days 1 PHENIX tech, PHENIX scientists A/R After EC cables, etc. installed PHENIX Pink sheets, blue sheets, white sheets 12/23/20102 weeks 2 PHENIX techs, PHENIX scientists A/R After DC Repairs PHENIX Chiller platform fire detection and suppression 12/230/20101 week 1 CAD plumbers, 1electrican ASAP after platform is installed

18 12/09/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes PHENIXAssemble shield wall12/24/20104 days1 rigging crew After EC rolled in PHENIXStart flammable gas12/27/20101 day1 PHENIX tech After shield wall in place FoCal ProtoDesign plan12/30/20102 weeksPHENIX MEIn Progress FoCal ProtoInstallation plan12/30/20102 weeksPHENIX MEIn Progress PHENIXInstall plug door12/30/20101 day1 rigging crew After shield wall built PHENIXClose shield wall12/30/20101 day3 PHENIX techs After pink/blue/white sheets PHENIXInstall safety interlocks12/30/20101 dayCAD safety After shield wall closed PHENIXClose out all 2010 shutdown WP's12/31/20101 day1 PHENIX ME After shutdown completed RPC1&Abs Proto Electronics & Gas Support Installation 12/31/20113 days3 PHENIX techsIf Time Permits PHENIXEnd of shutdown party1/7/20111 dayAll of PHENIX After shutdown completed

19 12/09/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes FoCal ProtoESRC review>1/1/2011???2 weeksPHENIX MENot Scheduled FoCal ProtoSupport structure design>1/1/2011???3 days PHENIX ME, Designer In progress FoCal ProtoSupport structure fabrication>1/1/2011???2 weeks 2 PHENIX techs, CS After Design is complete FoCal Proto Electronics, cooling, gas support design >1/1/2011???3 days PHENIX ME, Designer In progress FoCal Proto Electronics, cooling, gas support fabrication >1/1/2011???1 week2 phenix TECHSIn progress FoCal Proto Electronics, cooling, gas support installation >1/1/2011???3 DAYS3 phenix TECHSDuring run 11 FoCal ProtoSupport structure installation>1/1/2011???2 DAYS3 phenix TECHSDuring run 11 PHENIXDesign CM alignment stopspostponed For 2011 shutdown PHENIXFabricate CM alignment stopspostponed For 2011 shutdown

20 12/09/2010 Roof leaks in utility bathroom at northwest corner behind tech offices, over door between rack room and assembly hall and over door between control room and elect. ass’y room. General maintenance for Trailer Offices (in progress) Roof leaks in laser room and IR (southeast corner) Flooding in AH/ Driveway heaving [Lake PHENIX] New HVAC in Control Room and Conference Room New projector for conference room 2010 Building Maintenance Issues

21 12/09/2010 PHENIX Procedure Review Current Status: 148 Procedures Identified 85 Made Inactive (not currently in use, will require revision to re- activate if and when necessary, available for reference purposes) 9 CAD procedures relevant to PHENIX, all are up to date and available on the CAD web site 42 PHENIX approved procedures. all are current and up-to-date (1 of these soon needs updating) 11 Proposed/Draft Procedures (never previously formalized) (3 are ready for review) Web retrieval of latest procedures now available from PHENIX Internal:

22 12/09/2010 Safety, Security, Etc. 1.Annual PHENIX Safety review: no significant problems, waiting for minutes/action items 2.RPC1 Prototype & Borated Poly/Lead Absorber Review WP approved by CA Safety 3.Focal Prototype Review: Not enough info yet. Design and technical support are ongoing 4.BNL Standards for Ethics – Required Training Due by 12/31 5.From Mike Zarcone : Ensure your vehicle registration is current, and insure that you have a current BNL sticker displated. 6.From Ray Karol: Please assign staff to walk down your spaces to remove any transient combustibles. This applies to all buildings and all rooms. One of the issues from the recent relay fire in B911 was that we found transient combustible materials in the area. Removing unneeded combustible materials will reduce the chances of worsening the consequences of a fire.

23 12/09/2010 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: It’s beginning to look a lot like Christmas.