Review of NTS entry charge setting arrangements - IA 1 July 2010.
Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
LTSEC summer auction Transmission Workstream 6 th April 2006 Dave Adlam, National Grid NTS.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Industry Dialogue on xoserve Services 14 th September 2007.
Force Majeure Existing FM situation: Up to 200GWh/d capacity shortfall due to the rejection of NG’s planning application for a PRI in Corse / Tirley area.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Transmission Workstream 6 January 2011
Entry Capacity Overrun price calculation
Modification Proposal 0283 Update
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workstream 4th July 2007
UNC Trader User – Licence obligations
NTS Entry Charging Review Update
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Discussion on Mod262 and next steps
Assignment of NTS Entry Capacity – Background and UNC Obligations
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
The Necessary Criteria for a UNC Modification Proposal
Transmission Workgroup 6th March 2014
UNC Modification Proposal 0201 National Grid Distribution
QSEC auction timetable
Modification 501 slides for Workgroup
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Richard Fairholme Transmission Workstream 4th September 2008
Entry Overrun Calculation
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream 05 November 2009
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Force Majeure - Capacity Transmission Workstream 2 July 2009

2 Background  In terms of context Force Majeure affecting Capacity has only been declared once (as far as we have been made aware) since the inception of code.  Where National Grid NTS gives notice of Force Majeure under UNC General Terms B3.3.1(a) it is relieved of its UNC obligation to take constraint actions (Buy back) where the Shippers nominate flows in excess of the quantity covered by Force Majeure  Currently Shippers receive no relief from the full payment of Capacity charges once Force Majeure has been called  National Grid NTS has received requests from industry parties to look at addressing this issue

3 High level Proposal  National Grid NTS to:  Continue to invoice Shippers for their full NTS Entry Capacity Charges  Calculate and issue a Force Majeure rebate based on Shipper Holdings ie. Force Majeure quantity prorated between affected Shippers based on individual holdings for an amount that equates to the Force Majeure quantity Price to be based on a weighted average price based on a Shippers overall holdings at the affected point  Recover the Rebate via the Commodity charge  Suspend additional Capacity sales at the affected entry/exit point during the instance of Force Majeure  In the case of a buy back within / below the Force Majeure level affected Shippers to:  Undertake to tender a quantity of capacity (equivalent to the Force Majeure Rebate level) back to National Grid NTS at zero price i.e. the quantity rebated will be bought back at zero price in the case of a buy-back  Any additional constraints beyond the Force Majeure level would be subject to normal buyback principles

4 Extent to which implementation of this Modification Proposal would better facilitate the achievement (for the purposes of each Transporter’s Licence) of the relevant objectives  1(a) the efficient operation of the pipe-line system – The Proposal would introduce additional certainty into the UNC that will enable optimisation of Supply at an Entry Terminal under circumstances of Force Majeure (whether or not such Force Majeure is agreed between parties)  1(d) so far as is consistent with sub paragraphs (a) to (c) the securing of effective competition (i) between relevant Shippers – This Proposal is likely to be fairer in the context of individual projects, hence encouraging future investment and improving effective competition between Shippers. The Proposal may also secure effective competition between Shippers by ensuring that players at single points would not be inappropriately or disproportionately affected by Force Majeure.

5 Proposed Timeframes  If agreement can be reached then National Grid NTS to raise a UNC mod along the following timeframes: Proposal discussed at Tx Workstream02/07/09 Proposal issued for Consultation 16/07/09 Closeout for representations (15bd)06/08/09 Mod Panel decide upon recommendation20/08/09 FMR issued to Ofgem21/08/09 Proposal implementation date01/10/09