Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 25, 2013 Mira Vowles, P.E., CEM.

Slides:



Advertisements
Similar presentations
HVAC Equipment Efficiency Overview Building Performance Matters.
Advertisements

Advanced Heat Pump Water Heater Research Conducted by WSU Energy Program Funded by Bonneville Power Administration BPA Technology Innovation Project #292.
Efficient Low-Lift Cooling with Radiant Distribution, Thermal Storage and Variable-Speed Chiller Controls Srinivas Katipamula, Ph.D. Peter Armstrong, Ph.D.,
Partnership Gwinnett + Southeast Green Series- Debunking Energy Efficiency Myths: Why your bottom line depends on Energy Efficiency Property of VIS VIVA.
Emerging Technology Field Test 1 February 5, 2015 Brown Bag Mira Vowles, BPA Wesley Saway, BPA.
Ductless Heat Pumps in Manufactured Homes with Zonal Electric Resistance Heat Adam Hadley Regional Technical Forum February 18, 2015.
Ductless Heat Pumps in Residential Applications Proposed Research Plan.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 28, 2011 Mira Vowles, P.E., CEM.
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
Deeming Savings for Ductless Heat Pumps in Manufactured Homes Regional Technical Forum January 4 th, 2011.
Small Compressed Air Analysis Tool Summary of Subcommittee Meeting Presented to the Regional Technical Forum on January 6, 2008.
VRF for the Seventh Plan Preliminary Approach and Data for a Variable Refrigerant Flow Measure for the Seventh Plan Regional Technical Forum January 21,
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
BPA Pre-Pilot, Monmouth  14 homes with installed DHP, single zone, single compressor.  11 Monmouth, 2 Moses Lake, 1 Tacoma  Savings.
1 Proposed Changes to the RTF’s Heat Pump Specifications Impact on Estimated Deemed Savings and C&R Discount Program Credits.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee April 25, 2012 Mira Vowles, P.E., CEM Emerging.
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Emerging Technology Update Presented To Conservation Resources Advisory Committee June 4, 2014.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Prioritization of VC HP Measures Variable Capacity Heat Pump Measure RTF Sub-Committee June 22, 2011 meeting.
Hawke’s Bay Refrigeration
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee March 27, 2013 Mira Vowles, P.E., CEM Emerging.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Desuperheaters on Residential Air-Source Heat Pumps
Residential Single Family HVAC UES Measures Proven and Planning UES Measure Proposals Adam Hadley Regional Technical Forum December 16, 2014.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
Sunset Date Extension Requests Jennifer Anziano Regional Technical Forum August 18, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum April 14, 2015.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
N O R T H A M E R I C A C O M M E R C I A L TDP
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
Air Source Heat Pump Specifications Proposed Revisions Regional Technical Forum Subcommittee July 2, 2013.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Variable Capacity Heat Pump RTF Sub-Committee
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum September 17, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee June 12, 2014 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 27, 2013 Mira Vowles, P.E., CEM.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Combo products: Space + Water Market Drivers and Field Testing Status.
Northwest Power and Conservation Council Residential Conservation Resource Assessment Overview of Analytical Process and Major Assumptions April 21, 2009.
Of moderated conference calls on energy efficiency Utility Brown Bag Series BPA’s Rooftop Unit Service Pilot Jan 29, to 2 p.m. (PST) Facilitator:
Northwest Power and Conservation Council New Commercial Building Program Quest Presentation, Discussion and Decision of Proposed Approach to Estimating.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Alternative Incentive Approaches BPA Energy.
Variable Speed Heat Pumps Provisional UES Proposal Presentation to the Regional Technical Forum September 18, 2012 Presentation by Kacie Bedney, Bonneville.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee August 28, 2013 Mira Vowles, P.E., CEM.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee July 24, 2013 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee May 7, 2013 Mira Vowles, P.E., CEM Emerging.
RTF Administrative Measure Decisions November 14, 2012.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Unit efficiency versus Building System efficiency – Equipment Ratings EER and COP.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Building System efficiency not just a unit rating – Equipment Ratings EER and COP.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Of moderated conference calls on energy efficiency Utility Brown Bag Series Commercial New Construction -tools for your commercial customer’s new energy.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum March 17, 2015.
ECAM M&V Examples For Packaged Equipment Bill Koran, P.E. Director of Energy Analytics, NorthWrite Inc.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Seventh Plan Update RETAC September 23, Final Plan Update Review of Past Program Results Emerging Tech & New Measures Finance, Admin Cost, Line.
Research Strategy: Residential Ductless Heat Pumps Research and Evaluation Subcommittee Christian Douglass and Josh Rushton January 8, 2016.
. Level 3 Air Conditioning Inspections for Buildings
Variable Frequency Drive Savings Calculator Tools
Types of HVAC Technology Used in Business Establishments
Presentation transcript:

Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 25, 2013 Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency

Slide 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Meeting Topics 1.VC HP Overview (Mira) 2.LBNL VRF Project (Tianzhen) 3.NEC Article VRF Project (Marcia) Plus if time allows: Other VRF research projects (all) Suggestions for future meetings (all)

Slide 3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pumps (VC HP = VRF + DHP) + Ductless Heat Pumps Variable Refrigerant Flow Heat Pump System

Slide 4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Refrigerant Flow (VRF) Systems VRF systems, either heat-pump or heat-recovery models, provide heating and air-conditioning, with: 1.Inverter driven outdoor-unit compressors and condenser fans, providing improved part-load and low-ambient performance, 2.Multiple indoor-units with multi-speed fans, electronic expansion valves and integrated thermostats, 3. Refrigerant piping network for heat transfer, 4.Integrated control system, and 5.Ventilation provided by VRF system, natural ventilation or a dedicated outside air system (DOAS).

Slide 5 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N VC HP Sub-Committee 1.Sub-Committee of the Regional Technical Forum (RTF) 2.Purpose: develop and recommend VC HP measures with a)high consensus methodology to estimate and verify electrical savings b)specification for cost effective installations that ensures persistent savings 3.Minutes and presentations are posted at:

Slide 6 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N LBNL VRF Project Tianzhen Hong, LBNL Phase 1 –complete Title 24 prescriptive home with 3 ton, 3 zone VRF system EnergyPlus model with custom algorithms Phase 2 –underway 2,000 SF Title 24 prescriptive home (Stockton, CA), conditioned by a 3 ton, 3 zone VRF system M&V to validate EnergyPlus model and Title 24 compliance tools Phase 3 –future Test at LBNL FlexLab

Slide 7 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NEC Article Marcia Karr, WSU Energy Program NEC Article allows derating Multi-Family electric- service size: based on the number of multi-family dwelling units, with electric heat and cooking equipment; Demand factors range between 23 and 45%, resulting in first-cost electric-service cost savings; but Appeal needed for VRF systems.

Slide 8 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NEC Table

Slide 9 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NEC Article VRF Project Appeal City of Portland appeal for multi-family building, which could result in first-cost electric-service cost savings Supporting metering on 2 existing Portland buildings: o Both with 1 st floor retail and 4 floors of multi-family o One building with electric baseboard heat, and o One building with VRF system; To verify VRF system load diversity is similar to electric baseboard heat, amperage will be metered for 30 days: 1.Both whole building amperage, and 2.amperage for two dwelling units in each building.

Slide 10 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Next Meeting: 10/23/13 at 10 am Potential topics: DOE ASRAC (Paul Doppel) Other VRF research projects (all) Suggestions for future meetings (all)

Slide 11 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N November Meeting 11/20/13 at 10 am Potential topics: BPA’s Residential VC HP Research Other