Report from Task Force on Beam Instrumentation Stephen Molloy.

Slides:



Advertisements
Similar presentations
MEBT Design Considerations The beam energy in the MEBT is sufficiently low for the space charge forces to have a considerable impact on the beam dynamics.
Advertisements

R. Miyamoto, Beam Physics Design of MEBT, ESS AD Retreat 1 Beam Physics Design of MEBT Ryoichi Miyamoto (ESS) November 29th, 2012 ESS AD Retreat On behalf.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Requirements Structure and Status for NCFE
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ESS DTL beam commissioning
Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations 5 November 2014 Dave McGinnis.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Managed by UT-Battelle for the Department of Energy Using Online Single Particle Model for SNS Accelerator Tuning Andrei Shishlo, Alexander Aleksandrov.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Future challenges for minimum diagnostics requirements for beam commissioning and characterisation: The ESS as an example Marc Munoz, Beam Dynamics meets.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Beam Instrumentation in Monolith Stephen Molloy PBI Taskforce Leader.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
R. Miyamoto, MEBT Lattice Optimization, ESS AD Beam Physics Internal Review 1 MEBT Lattice Optimization Ryoichi Miyamoto (ESS) For Beam Physics Group,
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
Installation plans for RFQ and Superconducting linac Dave McGinnis Chief Engineer Eugene Tanke Systems Engineer March 20,
PBI task force intermediate report Stephen Molloy.
HEBT Design Considerations Jingyu Tang, Xiangqi Wang, Hao Hao, Jiajia Tian IHEP, USTC International Review Meeting on Accelerator Physics Design of C-ADS,
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
Accelerator Systems Integration Stephen Molloy Section Leader for Accelerator Integration April, 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
The Preparation for CSNS Accelerator Commissioning Sheng Wang June 8, 2015, Dongguan.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
ESS Front End diagnostic
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Beam Commissioning Adam Bartnik.
Experience with beam instrumentation at Linac4
LINAC 4 source & LEBT measurement results
Tom Shea Front End Meeting Catania
LINAC4 commissioning plans etc.
Diagnostics overview and FB for the XFEL bunch compressors
Considerations on Beam Diagnostics Physics
commissioning and measurements
Beam Commissioning at ESS
RF systems introduction
Ciprian Plostinar Workshop on Testing and Commissioning
Linac Diagnostics Commissioning Experience
DTL M. Comunian M. Eshraqi.
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Beam Commissioning Planning
RF introduction Anders Sunesson RF group leader
Radiation fields During 1st stage beam commissioning
Presentation transcript:

Report from Task Force on Beam Instrumentation Stephen Molloy

Contents Mandate of the taskforce – Authorities – Deliverables Assumptions Tasks Status Preliminary conclusions 2

Mandate Deliverables A written report with: A definition of the ACC:TGT interface. This will allow the task force to concentrate on accelerator diagnostics, and leave aside those that are purely for TGT purposes. The beam parameters that AD need to measure, and the lattice locations in which AD need to measure them. The baseline technology for the core PBI devices (that includes e.g. the BCMs, BLMs, BPMs). The priority in time for the additional PBI proposed in the existing plan from the BD group for PBI at ESS 3

Structure Online documentation: – Roles: – Stephen Molloy, Chair, Secretary – Andreas Jansson, Group Leader for Beam Instrumentation – Mamad Eshraqi, WP Leader for Beam Physics – Others called in as necessary Many thanks to the Beam Instrumentation, Beam Physics, & Aarhus University teams for their enthusiastic cooperation with this process Meetings: – Ad-hoc and based on linac sections – Typically proceed as follows Meeting #1: Discuss the various needs of the section, decide on tasks Meeting #2: Present strawman proposal, & review Meeting #3: Determine pseudo-final proposal Meeting #4: Address remaining issues 4

Assumptions The region of interest extends from the interface between the ion source and LEBT all the way to the Target, including the Tuning Beam Dump. The purpose of commissioning is to achieve the L3 requirements. – This must take into account the staged construction of the linac E.g., devices only required for >1 MW operation have less time-pressure than others The purpose of PBI is: – Beam measurements required for set-up of component to design values. For example, cavity phase scans making use of beam phase monitors. – Debugging of off-normal beam conditions. Specifically those conditions not otherwise communicated to the control system – Demonstrate achievement of the L3 requirements, including interface requirements, and the ACC:TGT interface requirements. Only those requirements related to the beam Including subsequent monitoring of those parameters – Machine optimisation and development. 5

Tasks Task #1: Nominal operations Assume that ACCSYS L3 requirements have been achieved, and that the machine is operating as designed. What PBI is needed to maintain nominal operations? – This should include debugging of off-normal beam conditions. 6 Split the work amongst four tasks based on the assumptions Task #2: Demonstration of successful commissioning/restart Assume the existence of the PBI suite detailed in the response to task #1. What additional PBI is needed to demonstrate the successful achievement of the L3 beam requirements? Task #3: Commissioning/restart Assume the existence of the PBI detailed in the responses to tasks #1 & #2. Assume that all accelerator systems and components have achieved (or can achieve) their requirements. What additional PBI is needed to allow set-up of component parameters to their design values? Of these, which are needed only during commissioning, and which need to be permanently installed? Task #4: Optimisation & development Assume the existence of the PBI detailed in the responses to the previous three tasks. What additional PBI is needed for machine optimisation and development?

LEBT Proposal 7 Doppler Measurement for species fraction. For commissioning, possibly relocated to test-stand during operations. Not yet decided. Transverse x & y position & profile. Gated to suppress signal from chopped beam. Allison Scanner

MEBT Proposal 8 DC remainder from RFQ takes ~3 quads to be cleaned out, so an additional measurement here is necessary “Slit & grid” 4-D transverse phase space measurement Chopper & Dump Fast current monitor (~1 GHz BW) to measure chopping efficiency 3 WS’s, 2 NPM’s, & a BSM give a very complete suite of measurements of the 6-D phase-space

DTL Proposal 9 Faraday Cups for beam commissioning/startup. Note that the transmission of tank #1 depends strongly on RF phase/amplitude, which can therefore be coarsely tuned based on the BCM. Transmission is very good for remaining tanks, even if powered off. No WS’s. Incoming mismatches are not visible after tank #1, so must be corrected in the MEBT. DTL quads are PMQ’s, so no transverse optics to correct. Unequal number of BPM’s in each tank to assist with trajectory correction. Proposed distribution is 6,4,3,2,2

DTL: Commissioning Proposal Temporary Diagnostics Line for DTL commissioning One possible configuration shown here 10 Note that this proposal is consistent with the proposed installation sequence

Cold linac + HEBT + Dogleg These sections are broadly similar – Doublet lattice separated by acceleration (or drift) slots Overarching decisions – Wire-scanners installed as triplets, not singlets Reduces the aging of individual scanners – One BPM per LWU – Non-invasive profile monitors – i.e., residual gas ionisation or beam induced fluorescence Not critical for commissioning, and so re-prioritised to a subsequent phase – Operations/power-ramp up 11

Spoke Proposal 12 Single BPM in each LWU NPB co-located with WS Three WS to measure DTL output transverse phase-space Faraday Cup acting as a low- power beam stop. For commissioning DTL Tank#5 Faraday Cup acting as a low-power beam stop for machine start-up

Medium-Beta Proposal 13 Three WS to measure transverse phase-space after the frequency jump (352 MHz acceleration  704 MHz) Faraday Cup for machine start-up

High-Beta Proposal A placeholder for a transverse measurement in case the performance of the Medium-Beta linac requires it.

HEBT & Dogleg Proposal 15 WS triplet near the end of the HEBT. Slow phase advance leads to a large separation

A2T Proposal 16 Raster system Action point of raster system. 180deg out of phase (both planes) from the cross-over point in the Neutron Shield Wall. WS will therefore measure the same beam as at the cross-over. Cross-over point in the Neutron Shield Wall. Position measured here should not be affected by deflections close to the raster action point. This BPM will therefore allow verification of the lattice values. Post-raster BPMs verify correct triggering of the raster magnets. Measured amplitude of beam position and B-dot loops in the raster magnets can be correlated with the beam spot on the luminescent coatings in the Target. Steerers located symmetrically around the raster action point to allow for verification of the downstream optics and probing of

Target Instrumentation Instrumentation to be installed in the Target Monolith was also discussed – This was presented earlier today Conclusions – Luminescent coatings applied to the PBW and BEW – Halo monitors on the PBW and PBI Plug – Consider backup options Specifically the use of a wire-grid system in the PBI Plug 17

Summary Multiple recommendations made throughout the linac and target The difference from the previous baseline is significant but not drastic Achievements: – A better integration with Target Systems – Closer ties between Beam Physics and Beam Instrumentation – Defined a core suite of systems to take ESS through commissioning to operations 18

Spare slides… 19

Working assumptions (initial) The region of interest extends from the interface between the ion source and LEBT to the interface between accelerator and target. – The tuning dump interface is also included in the ACC:TGT definition. – The mechanical and beam interfaces between the accelerator and target are coincident at the upstream face of the neutron shield wall. Note that this implies that target PBI is not part of ACCSYS scope. The purpose of commissioning is to achieve the L3 requirements. The purpose of PBI is: – Measurement of the beam to allow the set-up of component parameters to design values. For example, cavity phase scans making use of beam phase monitors. – Debugging of off-normal beam conditions. Specifically those conditions not otherwise communicated to the control system – Demonstrate achievement of the L3 requirements, including interface requirements, and the ACC:TGT interface requirements. Only those requirements related to the beam Including subsequent monitoring of those parameters – Machine optimisation and development. 20

ACC:TGT interface negotiations Target Division didn’t agree to the proposed change in the ACC:TGT interface definition They’re happy to have TGT beam diagnostics taken into the scope of this taskforce Thus: – Proton beam diagnostics within the TGT monolith are now part of this taskforce 21